Appeal 3301626
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Under Article 3(1) and Schedule 2, Part 1, Class A.1.(g) of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (the GPDO), planning permission is granted for the enlargement of a dwellinghouse consisting of a single storey extension beyond the rear wall of the original dwellinghouse of up to 8m in the case of a detached house and 6m in the case of any other house and where its height would not exceed 4m. This is subject to limitations and conditions.
Amongst these conditions, paragraph A.4(7) to Part 1 requires the developer to apply to the local planning authority for prior approval to assess the impact of the proposed development on the amenity of any adjoining premises in instances where any owner or occupier of an adjoining premises has objected to the proposed development.
As an owner or occupier of an adjoining premises objected to the proposed development, the prior approval of the local planning authority was required and was subsequently refused.
Section 04
Main Issue
The main issue is whether prior approval should be granted under Class A of Part 1 of Schedule 2 of the GPDO, having regard to the effect of the development upon the living conditions of the occupiers of [address].
Section 05
Reasons
[site address] is a semi-detached property located within a residential area. The property has a single storey rear extension and, beyond, within a spacious garden, a detached garage and shed. No 98 is the adjoining semi-detached property, its garden is separated from that of the host property by a fence. No 98 does not have a rear extension, though it appears to have a single storey addition to its side. No 98 has a feature two storey bay window to rear with the ground floor bay containing a number of windows and a glazed access door. The substantial amount of glazing to this bay window will provide the occupants with a pleasant outlook of the long rear garden and significant daylight and sunlight.
The extension would run along the common boundary with No 98 and thereby immediately adjacent to the rear garden of that property. The ground floor bay window serving No 98 is inset only slightly from the common boundary and therefore the proposed extension would run closely alongside and past this window.
At 6m, the projection of the extension from the back of the original house would be significant and considerably greater than the existing single storey extension. The extension would incorporate a shallow pitched roof. Therefore, whilst the eaves level may be below 3m in height, for the majority of its length it would be higher than 3m, substantially higher than the existing fence and, for the most part, higher than the existing extension it would replace.
The Residential Extensions and Alterations Supplementary Planning Document 2, 2018 (SPD) provides quite prescriptive guidance in relation to single storey rear extensions. The SPD advises that a single storey rear extension of up to 6m in depth may be acceptable providing that for every additional metre beyond 3m in depth, the extension is set in from the boundary by an additional metre. As the proposed extension would replace an existing extension and project by 6m without any boundary inset, the proposal would not comply with the advice contained within the SPD. There is no clear reason why the SPD guidance would not be appropriate to ensure the maintenance of appropriate living conditions in this case.
Although the existing garage would be demolished, this is located a considerable distance from the common boundary with No 98. Due to this distance, the effects that the existing garage will be having upon the outlook from the house and enjoyment of the garden at No 98 are far less significant than what would occur with the proposed extension.
For the above reasons, the proposed extension would create a harmful dominating effect upon the garden of No 98 and would unacceptably reduce the levels of outlook presently available from within the ground floor bay window.
I accept that the presence of the existing detached garage, rear extension and fence will collectively cause some reduction in light to the garden and bay at No
In the afternoon the garden and bay will benefit more from direct sunlight and the proposal would not affect this. Nevertheless, due to its length, height and proximity the proposed extension would be likely to reduce levels of daylight from the present situation and I have no substantive evidence before me that the development would not cause a significant amount of additional shading.
Consequently, I find that the proposed development would cause unacceptably harmful effects upon the living conditions of the occupiers of No 98.
Section 06
Other Matters
Even though the development may adhere to the dimensional requirements of Schedule 2, Part 1, Class A.1.(g) of the GPDO, this case is nevertheless subject to the prior approval procedure. This procedure is embedded in the permitted development right and the approval is an essential component of the consent granted. The permitted development right applicable to this extension is contingent upon the grant of prior approval and does not exist without it.
The objection received in respect to the development was not submitted by the occupiers of No 98 but by the neighbouring occupiers within No 102. However, the need for prior approval is triggered by the receipt of an objection from any adjoining premises and the assessment in relation to living conditions to be undertaken relates to any adjoining premises including those where the occupiers did not make representations. The absence of objection from the occupiers of No 98 does not in itself render the scheme appropriate nor overcome my concerns in the main issue.
The Council have raised no objections to the development on the basis of the effects of the development upon the occupiers of No 102 or properties on The Fairway and I have no reason to disagree with this conclusion.
I accept that the extension would provide additional living space for the needs of the occupiers, but I have limited detail on precisely what these needs or requirements may be. In these circumstances these requirements are insufficient to outweigh the harm I have identified in the main issue.
The design and appearance of the extension may be acceptable, however, in this prior approval appeal the matters for consideration are confined to the impact of the development upon the living conditions of any adjoining premises. I cannot therefore attribute this matter weight in my Decision.
Finally, the appellant has drawn to my attention a number of other cases. Only limited detail in relation to each has been submitted. Notwithstanding this, I do note that in the case at [address] the proposed extension would appear set in from one adjoining boundary whilst the neighbouring property to the other side appears to have a significant rearward extension. If this is correct those circumstances differ from this case. From the description of the development in the [address] case, that extension was lower than would be the case here. In the [address] case only a location plan is supplied, and it is unclear whether this depicts the layout of the extension or not. For these reasons I cannot attribute any meaningful weight to the cases presented.
Section 07
Conclusion
For the reasons given above, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3673No official casework-database value to compare
- Extracted decision date · page 1
- 13 December 2022Matches the official casework database
- Extracted site visit dates
- 8 November 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3301626
- Application reference
- 22/0609
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Brent
- Planning authority code
- E09000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 22 June 2022
- Valid date
- 22 June 2022
- Start date
- 15 September 2022
- Planning authority decision date
- 1 April 2022
- Appeal decision date
- 13 December 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 25096
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21