Skip to main content
Official casework recordDismissedCurrent release

Appeal 3301686

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a full width ground floor rear extension and part first floor rear extension with internal alterations.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect on the character and appearance of the area.

  3. Section 04

    Reasons

    The existing dwelling has a large and distinctive corbel feature associated with a gable parapet to the side facing elevation. These corbels are to the front and rear of the property and this design feature is common to both ends of this terrace. It is also present on a number of other terraces along this road. These distinctive gable features are important to the character of these otherwise simply designed houses and add significantly to the wider character and appearance of the area.

    This proposal would result in a part single and part two storey rear extension. The property is situated on a corner plot and its side gable is prominent in views from the road. The two storey addition would extend the side gable wall further to the rear and would include a roof that would hip into the main rear facing roof slope.

    The elevation plans suggest that the distinctive corbel would be retained; and that the eaves of the new rear extension would extend beyond the alignment of the gable and parapet. The roof plan shows the new roof cutting across the parapet and corbel and does not show the roof extending beyond the side gable. The conflict between the plans results in uncertainty as to how the relationship of the existing gable and corbel would work with regard to the new roof structure. However, in other respects, the elevations appear to reflect the www.planningportal.gov.uk/planninginspectorate Appeal Decision: APP/C1950/D/22/3301686 details of the floor plans so I have assumed them to be correct, rather than the roof plan.

    The eaves overhand and the rainwater goods, which are shown beyond the alignment of the side elevation at first floor level, would detract from the distinctive parapet and corbel feature. Although the plans show a line where the gable and the proposed side of the extension wall would begin, this in reality would not exist if built as shown. It would be necessary to step the side of the rear extension back, making it narrower, in order for the eaves of the new roof and its rainwater goods, to be viewed beyond the corbel, in order to make a meaningful distinction and to avoid conflict with this important feature.

    On the basis of the current elevation plans, the proposed side facing eaves, along with the prominence of the rainwater goods, would compete with and detract from the distinctive appearance of the gable parapet and corbel. I agree with the council that this would represent poor design and it would detract from the appearance of these properties and the character of the wider area. It would therefore be contrary to Policy D1 and Policy D2 of the Welwyn Hatfield District Plan 2005 as these seek high quality design; and require respect for the character of the area. As these policies generally accord with the design aspirations of the National Planning Policy Framework, I afford them full weight.

    I have had regard to the examples provided of other properties in the area but have not found them to be directly comparable. Drawings of the same extension with a flat roof and a steeper pitched roof have been provided but as both retain the matching alignment with the gable wall, they result in similar conflict with the corbel. Reference is made to plans that set the north-east wall of the proposed extension back by 20cm to the right. I have not been provided with these plans. In any event, I must consider the proposal before me. I note the previous permissions for side extensions, but these do not suggest that the currently proposed design would be acceptable.

    In conclusion, the plans submitted have discrepancies but based on the elevation plans, the upper section of the first floor extension would conflict with the important detailing of the corbel and would result in a compromised design. [name] have had regard to the family circumstances of the appellant and the benefits this proposal would bring, I am not satisfied that there are any matters that are sufficient to outweigh my concerns. I therefore dismiss the appeal.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 341No official casework-database value to compare
    Extracted site visit dates
    10 October 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3301686
Application reference
6/2022/0893/HOUSE
Lead case reference
Not recorded
Planning authority
Welwyn Hatfield Council
Planning authority code
E07000241

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
29 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
22 June 2022
Valid date
6 July 2022
Start date
22 July 2022
Planning authority decision date
30 May 2022
Appeal decision date
31 October 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
22771
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21