Skip to main content
Official casework recordDismissedCurrent release

Appeal 3302060

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as “Construction of a single storey basement below house and part of rear garden; formation of rear lightwell with walk on rooflight and associated alterations”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    I am aware that since their decision, the Councils New Local Plan Review (NLPR) has progressed to Regulation 18 as of March 2022. I have little information to suggest when the plan is likely to be adopted, if any policies have been modified, or if there are any unresolved objections. Accordingly, I attribute limited weight to the NLPR.

  3. Section 04

    [name]

    The main issues are the effect of the construction works on structural integrity and highway safety.

  4. Section 05

    Reasons

    The appeal site is located in [address], a small residential cul-de-sac accessed via the eastern side of [address], which has been designated as a red route. The property is a three-storey terrace located in a mixed-use area, with commercial premises fronting [address] and predominantly residential properties occupying the side streets. The proposal consists of the construction of a single storey basement with a lightwell in the garden to the rear of the property.

  5. Section 06

    Structural integrity

    The Planning Practice Guidance (PPG) states that the planning system has an important role in considering land stability by minimising the risk and effects of land stability on property, infrastructure and the public and helping ensure that development does not occur in unstable locations or without appropriate precautions1.

    Policy CL7 of the Royal Borough of Kensington and Chelsea Local Plan (KCLP), adopted September 2019, amongst other things, requires basement development to be designed to safeguard the structural stability of the existing building and nearby buildings. The Royal Borough of Kensington and Chelsea: Basements Supplementary Planning Document (SPD) adopted April 2016, amongst other things, seeks further assurance in respect to structural stability through the provision of a construction method statement (CMS) to ensure the construction of basements can be undertaken safely.

    The appellants have submitted a CMS2 detailing the methods and strategy to be employed in the construction of the appeal proposal, although as the Council highlighted this is currently unsigned. The appellant contests that whether the report is signed by a named engineer or not does not dilute the strategy within the CMS. However, the SPD is specific in its requirement that a CMS must be signed by a [name] (MICE) or [name] ([name]. E.), as the Council relies on the professional integrity of the person signing the CMS to be assured that the conclusion, that the construction of the basement can be undertaken safely and will safeguard the structural stability of the existing building and other nearby buildings, is soundly based.

    The SPD also highlights that an assessment of predicted ground movements and the damage category for surrounding buildings should be undertaken. The Council contend there is limited information regarding the impact on adjoining properties. The CMS refers to construction methods reducing the amount of ground movement to minimise the effect on adjacent structures, and whilst confirming that regular reviews will be undertaken by an experienced contractor, there is no explicit conclusion or assurance that there would be no movement outside the “green” 0mm – 5mm levels. As such, I have adopted a precautionary approach. Given that the CMS remains unsigned, the evidence supplied to me does not provide adequate assurance that the construction of the basement can be undertaken safely, and I am not satisfied that it will safeguard the structural stability of the existing building and other nearby buildings in accordance with the adopted SPD.

    The appellant further considers that a condition could be applied to any permission requiring either compliance with the submitted CMS or the submission of an alternative CMS prior to work commencing. The appellant also draws my attention to a previous Inspectors decision at the site3, who was satisfied that a comprehensive CMS and the professional supervision at the site could be secured by condition. [name] appreciate that an engineering solution may be possible, in the absence of a signed CMS by a qualified engineer, and the lack of any further independent investigation, I am not satisfied that the structural stability has been safeguarded. The lack of certainty in this context leads me to conclude that it would be inappropriate for this issue to be dealt with by condition. 1 [name] - Paragraph: 001 [name]: 45-001-20190722 2 Knapp, Hicks and Partners Ltd Constructing Structural, Civil & [name] dated May 2019 (Ref: 34706/X/002/SH/LW) 3

    As such, I conclude that the development would not accord with KCLP Policy CL7(m) and the aims and objectives of the SPD, which amongst other things, seeks to ensure that development would result in the structural integrity of the host building, nearby buildings and infrastructure being maintained. The appeal proposal would also fail to comply with Paragraph 183 of the National Planning Policy Framework 2021 (the Framework) which requires adequate site investigation to inform decision making.

  6. Section 07

    [name]

    KCLP Policy CL7(k) states basement development must ensure that traffic and construction activity do not cause unacceptable harm to pedestrians, cycle vehicular and road safety, or adversely affect bus or other transport operations. It should also not place unreasonable inconvenience on those living, working or visiting the area.

    The appellants have submitted a Construction Transport Management Plan (CTMP) indicating that no construction vehicles would enter [address], and would instead utilise an existing loading bay nearby on [address]. This arrangement would be similar to a previous construction scheme4 that has taken place successfully at the appeal site, although it is acknowledged that these works did not incorporate the volumes of spoil material associated with subterranean developments.

    The CTMP highlights that all the transport arrangements for the construction of the appeal scheme, including spoil removal and material deliveries could be undertaken without the need to suspend the loading bays, nor breach the 20- minute loading restriction applied to the existing service and delivery bays on [address]. This would ensure minimal disruption and inconvenience to those living, working and visiting nearby.

    From the evidence before me, it is likely that a condition could be applied, had the scheme otherwise been found acceptable, that would meet the tests set out at paragraph 56 of the Framework, to ensure that the construction of the appeal scheme could be undertaken without harmful disruption to the users of the highway and footpaths, including residents and nearby businesses on [address]. Furthermore, any violations to the 20-minute loading restrictions in the existing parking bays, would be controlled through parking enforcement.

    Therefore, I conclude the construction activity associated with the appeal scheme would not cause unacceptable harm to pedestrian, cycle, vehicular and road safety nor place unreasonable inconvenience on those living, working and visiting nearby. In these regards, it would comply with KCLP Policy CL7(k). I do not find conflict with KCLP Policy CL1 which focuses principally upon context and character ensuring the delivery of design quality. The content of this policy is largely irrelevant to the issues of highway safety associated with the construction works at the appeal site I have identified.

  7. Section 08

    Other Matters

    I have had regard to the previous appeal decision5 at the appeal site. Whilst the main issue is similar, nevertheless I have determined this appeal on its own merits and based on all the evidence before me. 4 Kensington & Chelsea Planning Ref: PP/17/07019 5

  8. Section 09

    Conclusion

    For the above reasons, having taken account of the development plan as a whole along with all other relevant material considerations, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2962No official casework-database value to compare
    Extracted decision date · page 1
    7 November 2022Matches the official casework database
    Extracted site visit dates
    4 October 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3302060
Application reference
PP/21/06913
Lead case reference
Not recorded
Planning authority
Royal Borough of Kensington and Chelsea
Planning authority code
E09000020

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
46 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
29 June 2022
Valid date
29 June 2022
Start date
5 August 2022
Planning authority decision date
7 April 2022
Appeal decision date
7 November 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
23159
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21