Appeal 3302149

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a single storey side/rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues in this case are: • whether the proposed development would be inappropriate in the Green Belt; • the effect of the proposed development on the openness of the Green Belt; and • if the proposed development is inappropriate, whether the harm to the Green Belt by way of inappropriateness and any other harm, is clearly outweighed by other considerations so as to amount to very special circumstances to justify it.

  3. Section 04

    Whether Inappropriate Development

    The National Planning Policy Framework (the Framework) makes clear at paragraph 149 that the construction of new buildings in the Green Belt should be regarded as inappropriate, with a small number of exceptions. One of these is the extension or alteration of a building that does not result in disproportionate additions over and above the size of the original building.

    The Framework defines ‘original building’ as meaning the building as it existed on 1 July 1948 or, if constructed after that date, as it was built originally. In this regard the provisions of the Framework extend to all ‘buildings’ not just dwellings.

    Policy 17 of the Solihull Local Plan (December 2013) (LP) deals with Countryside and Green Belt. Whilst the development plan was adopted some time ago, its aims are nevertheless broadly consistent with the approach in the Framework, insofar as this appeal is concerned.

    The appellant asserts that the existing habitable floor space amounts to 123 sqm with a proposed extension of [address] metres, which equates to an increase of 39.84%. That said, I have no evidence before me to show how those figures have been arrived at. The Council disagree with these figures, indicating that the original building had a floor area of approximately 71 sqm, and has since been extended by a further 21 sqm1. These figures are not disputed by the appellant. Consequently, if the floor area of the building was to be extended by a further 51 sqm, as proposed, the resultant building would have a floor area twice that of the original building.

    No quantitative guidance is provided in national policy regarding what might be considered disproportionate. That said, the Council indicate that an increase of up to 40% in the floor area would not be considered to be disproportionate. The appellant disagrees with this view and asserts that any increase would have to exceed 100% in order to be considered disproportionate. However, assessing proportionality is primarily an objective test based on size, and floor area should not be the sole basis for considering whether such a change is disproportionate. As such, it is important to consider this issue in terms of the scale, bulk massing and built form that would result from the changes sought.

    Given the length and depth of the proposed development, and the limited size of the host building, I find that the extension would significantly add to the host property’s scale, bulk and mass. This would be in addition to the extension already carried out at the property. Consequently, the resultant development would constitute a disproportionate addition over and above the size of the original building.

    For this reason, the proposed development represents inappropriate development in the Green Belt for the purposes of the Framework and LP Policy

    Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in ‘very special circumstances’.

  4. Section 05

    Openness

    Openness is an essential characteristic of the Green Belt. The Courts have confirmed that openness of the Green Belt has a spatial as well as a visual aspect

    The proposed development would result in the addition of a substantial new extension. The additional floor area, combined with the increase in the mass and bulk of the host property, would affect openness in that it would be reduced. Whilst accepting that the appeal site is well screened from neighbouring areas, and in isolation the reduction in openness would be limited and localised, harm to the Green Belt would result.

  5. Section 06

    [name]

    The Framework makes it clear at paragraph 144, that substantial weight is given to any harm to the Green Belt. It establishes that ‘very special circumstances’ will not exist unless the potential harm to the Green Belt by 1 PL/2014/00885/CU and PL2015/50953/VAR reason of inappropriateness, and any other harm is clearly outweighed by other considerations.

    The appellant has drawn my attention to the grant of planning permission for the erection of 9 two storey affordable dwellings on the adjacent field2. However, I have not been provided with details of the development, or the circumstances under which it was permitted. Accordingly, I can only attach very limited weight to this matter. It would not outweigh the harm to the green belt that I have identified above.

    I accept that the appeal site is located directly adjacent to existing residential areas and has good access to the services and facilities that the village provides. However, this is a neutral matter in my consideration.

    I also note that the property benefits from permitted development rights following their reinstatement as a consequence of a recent planning application3. That said, I have no evidence before me to indicate the extent of development that would be possible under those rights, or whether there is a realistic prospect of such development proceeding in the event that this appeal is dismissed. Consequently, I give this matter limited weight.

    The proposed extension would be located approximately 18 metres outside of the conservation area, and the Council consider it to be an acceptable design. In this regard I do not disagree with their findings. However, this is a neutral matter in my consideration.

    I have taken into account the appellants desire to provide an energy efficient extension to the property. That said, I have no substantive evidence before me to support this aspiration. Consequently, I give this matter only very limited weight.

  6. Section 07

    Conclusion

    The proposed development would represent inappropriate development, which is by definition, harmful to the Green Belt. Additionally, I have found there would be harm to the openness of this part of the Green Belt. Limited weight has been given to the material considerations cited in support of the proposed development, and I conclude that they do not outweigh the harm the proposed development would cause to the Green Belt. Consequently, the very special circumstances to justify the proposal do not exist. The proposal therefore conflicts with Green Belt policy contained within the Framework and Policy 17 of the LP.

    There are no other relevant material considerations that indicate the application should be determined in accordance with the development plan as a whole. For the reasons given above, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 955No official casework-database value to compare
    Extracted decision date · page 1
    20 December 2022Matches the official casework database
    Extracted site visit dates
    6 December 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3302149
Application reference
PL/2022/00291/MINFHO
Lead case reference
Not recorded
Planning authority
Solihull Metropolitan Borough Council
Planning authority code
E08000029

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
49 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
29 June 2022
Valid date
29 June 2022
Start date
26 July 2022
Planning authority decision date
14 April 2022
Appeal decision date
20 December 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
25536
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21