Appeal 3302503
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of a garden room in a far corner of the plot as shown on plans.
Section 02
Decision
The appeal is allowed and planning permission is granted for the erection of a garden room in a far corner of the plot as shown on plans at [site address] , in accordance with the terms of the application, Ref 21/03720/FUL, dated 11 December 2021 and the plans submitted with it, subject to the attached schedule of conditions.
Section 03
Preliminary Matters
The planning application form did not contain the appellant’s name. I have therefore taken the appellant’s name from the planning appeal form.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the area.
Section 05
Reasons
[address] is residential in character and defined by properties set back a uniform distance from the highway. The plots are linear with car parking to the front and gardens to the rear. The appeal property is a large two storey detached house. The site is anomalous to the prevailing pattern of development, being a triangular plot with a generous area of garden beyond the house’s side elevation.
Due to its smaller footprint and single storey, flat roof design the outbuilding would be subordinate to the large, two storey host dwelling. The height of the outbuilding would be similar to the height of the eaves of the property’s ground floor projections. However, it would clearly remain subordinate to the dwelling’s principal eaves height at first floor level.
The flat roof design would minimise the overall height of the outbuilding. It would be located close to, but set back from, the timber boarded fence on the site’s front boundary. Whilst the top half of the outbuilding would be visible above the boundary fence, it would provide an effective visual screen of the outbuilding. This would successfully reduce the outbuilding’s visual prominence, ensuring that it would not have an overbearing presence when viewed from [address].
The outbuilding would be sited forward of the dwelling’s front elevation and the prevailing building line on this side of [address]. The proposed location within the corner of the site would ensure that a generous separation distance to the host dwelling would be maintained. The subordinate design of the outbuilding means that it would be read quite separately in the street scene to the two storey houses on this side of the road. The separation distance between the outbuilding and host dwelling combined with its low height and boundary fence screening ensures that the outbuilding would not have the effect of intruding into an otherwise open street scene. I therefore find that its positioning beyond the building line would not be harmful to the character and appearance of the area.
For the reasons outlined above, I conclude that the proposed outbuilding would not cause harm to the character of the area. Accordingly, I find no conflict with the [name] (2012) Policy CS01 and Unitary Development Plan (2004) Policies H9 and ENV39 which, amongst other aims, seek to ensure high quality design which is sympathetic to the local area. Although the Council also alleges a conflict with the UDP Design Guidance, my attention has not been drawn to how the appeal proposal would be contrary to it. It has therefore not been determinative in my decision.
Section 06
Other Matters
Concerns have been raised about the potential for the outbuilding to have an enclosing effect whilst reducing the natural light to the garden of [address]. However, given the scale of the outbuilding, its flat roof design and its location to the rear of No. 50’s garden, I do not find that it would harm the living conditions of neighbouring occupiers. Although concerns have also been raised about the potential to cause excessive water runoff to the neighbouring property, I have not been presented with compelling evidence to demonstrate that the appeal proposal would result in unacceptable effects in relation to runoff and drainage issues. Consequently, these matters do not lead me to a different overall conclusion that the appeal should be allowed.
Section 07
Conditions
The Council has provided a list of conditions, which I have assessed in regard to the advice provided in the National Planning Policy Framework (2021) and Planning Policy Guidance. In addition to the standard time limit, I have imposed an approved plans condition in the interests of certainty. I have also included the Council’s suggested condition requiring that the outbuilding is used solely for purposes incidental to the host property, to prevent an over intensive use of the site.
The application form states that the proposed materials would be predominantly larch timber, which would not match with the existing property. Consequently, I have declined to impose the suggested condition which would require the outbuilding materials to match the existing property.
Section 08
Conclusion
For the above reasons, and having had regard to all other matters raised, I conclude that the proposed development would accord with the development plan. The appeal is therefore allowed.
Section 09
SCHEDULE OF CONDITIONS
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: BGR002/C ([name] – [name]); BGR002/C ([name] – [name]); BGR003/B (Proposed Block Plan); 001/C (Floor Plan); BGR002/C ([name] – Front (West) & Rear (East); BGR003/B (Existing Site Plan).
The outbuilding hereby approved shall be used solely for purposes incidental to the enjoyment of the private dwelling house at [site address] , and shall not be used as a separate unit of accommodation, or for any business, trade or profession. The outbuilding shall not contain sleeping accommodation at any time. END OF SCHEDULE
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3395No official casework-database value to compare
- Extracted decision date · page 1
- 2 February 2023Matches the official casework database
- Extracted site visit dates
- 15 December 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3302503
- Application reference
- 21/03720/FUL
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bexley
- Planning authority code
- E09000004
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 5 July 2022
- Valid date
- 7 July 2022
- Start date
- 13 October 2022
- Planning authority decision date
- 14 June 2022
- Appeal decision date
- 2 February 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 27495
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21