Appeal 3303318
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a hip to gable and rear dormer roof extension with installation of 2no rooflights and solar panels to front roof slope to facilitate loft conversion.
Section 02
Decision
The appeal is allowed and planning permission is granted for the erection of a hip to gable and rear dormer roof extension with installation of 2no rooflights and solar panels to front roof slope to facilitate loft conversion at [site address] , [name] [postcode] in accordance with the terms of the application Ref 22/00992/HOU, dated 23 March 2022, subject to the following conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the approved plans: 21.54AR.PL02, 21.54AR.PL.05 and 21.54AR.PL.06.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
No development shall take place until a [name] has been submitted to and approved in writing by the local planning authority. The Fire Safety Strategy shall demonstrate how the development will achieve the highest standards of fire safety. The development shall be carried out in accordance with the approved Strategy and thereafter maintained.
Details for the provision of at least three swift bricks or boxes shall be submitted to and approved in writing by the local planning authority. The approved scheme shall be carried out in accordance with the approved details prior to the functional occupation of the development (the accommodation at roof level) hereby permitted and thereafter retained.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Procedural Matters
I have included the description of development used within the decision notice because it more accurately describes the proposed development.
Section 05
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the area.
Section 06
Reasons for the Recommendation
The appeal site is a two-storey, end-of-terrace dwelling that forms part of a terrace of four properties on the northern side of [address]. The dwelling has a complex roof shape formed by a front hipped element that continues the ridge line of the wider terrace and a lower hipped roof which is set back to the side and rear. No 48, at the other end of the terrace, has an existing hip to gable roof extension to the front and a large rear dormer to its side and rear. The surrounding area is characterised by a variety of housing types, including a number of short terraces. The majority of front roof slopes in this locality remain in their original form. However, No 62, an end-of-terrace property which lies a short distance to the west of the site, has a large flat-roofed roof extension that is visible from the streetscene. There are a number of dormer extensions that are visible from the rear of the appeal property.
The proposed development includes the erection of a hip to gable roof extension to the front element of the roof form, which would incorporate front-facing rooflights and solar panels. The proposal also includes the construction of a large, flat-roofed dormer to the side and rear hipped roof element. This dormer would be partly visible from the streetscene, it would not be set down from the ridgeline nor in from the sides or eaves.
The proposed development would be visible from the [address] streetscene, where it would be seen in the wider context of the existing roof extension at No 48. The works to the roof at No 48 are recent additions that were approved in 20191. The nearby extension at No 62 also establishes large roof extensions as a small part of the character of this immediate area. While the proposal would add considerable bulk at roof level, in this specific instance, it would have a rebalancing effect on the terrace and would not appear as an incongruous addition in the wider streetscene. There would not be an unacceptable effect on the character and appearance of the area, which there otherwise may have been on an unaltered terrace.
The rear dormer would have a large size and would not be set down from the ridge line nor in from the eaves or sides, as advised by the Residential Design Supplementary Planning Document 2013 (SPD). Nevertheless, the SPD does not state this must be applied to all dormer window designs and the extension at No 48 has a similarly large size. Moreover, there are numerous other large dormer extensions visible from the rear of the terrace, including at No 50 and 1 [name]: 19/01595/HOU on the adjacent terraces. In this specific context, the effect on the character and appearance of the dwelling would be acceptable. There would not be conflict with the general design principles for extensions outlined in the SPD, specifically that any extension should respect the character and appearance of the original building, group of buildings or the streetscene.
Overall, the proposed scheme would not unacceptably harm the character and appearance of the dwelling or the surrounding area. It would therefore accord with the [name], adopted April 2012, specifically Policy DM10 which seeks to ensure that development proposals respect the scale and roof forms that contribute to the character and local distinctiveness of an area. It would also accord with Policy CS8, which seeks to ensure that new development relates well and connects to its surroundings. The proposal would also accord with Policy D3 of The London Plan, adopted March 2021, which seeks to ensure development proposals respond to the existing character of a place.
Section 07
Conditions
In addition to the standard time period for commencement and requiring that development be carried out in accordance with the approved plans, which is necessary for certainty, I recommend that matching external materials are used to preserve the character and appearance of the dwelling.
I recommend an amended version of the Council’s fire safety condition which was submitted at the appeal stage. This is necessary to ensure compliance with Policy D12 of The London Plan which requires all development proposals to achieve the highest standards of fire safety. Such safety measures would need to be integrated into the building project and be considered in the internal building detailing. Given the nature of the proposed scheme, with no below ground works, a pre-commencement condition would be necessary.
A consultation response has raised matters regarding the local swift population. The main parties were asked to comment on this matter and the Council provided a condition concerning the use of three swift bricks or boxes that it considers would adequately deal with the issue. I consider this condition necessary to protect and promote biodiversity and to aim to secure net biodiversity gain.
Section 08
Conclusion and Recommendation
The proposed development would accord with the development plan, when considered as a whole. Based on the above, and having regard to all matters raised, I recommend that the appeal should be allowed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 859No official casework-database value to compare
- Extracted decision date · page 1
- 29 November 2022Matches the official casework database
- Extracted site visit dates
- 2 November 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3303318
- Application reference
- 22/00992/HOU
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Kingston Upon Thames
- Planning authority code
- E09000021
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 18 July 2022
- Valid date
- 18 July 2022
- Start date
- 30 August 2022
- Planning authority decision date
- 13 May 2022
- Appeal decision date
- 29 November 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 24291
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21