Appeal 3303732
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
additional storey at first floor level.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Schedule 2, Part 1, Class AA of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (the GPDO), permits, subject to limitations and conditions, development consisting of the enlargement of a dwellinghouse by construction of one additional storey, where the existing dwellinghouse consists of one storey, together with any reasonably necessary engineering operations.
The GPDO sets out in paragraph AA.3(12)(b) that the National Planning Policy Framework (the Framework) must be considered in this type of prior approval case insofar as it is relevant to the subject matter of the prior approval, as if the application were a planning application.
The relevant provisions of the GPDO do not require regard to be had to the development plan. Accordingly, I have only considered the policies and guidance cited in the decision notice insofar as they are a material consideration relevant to matters relating to the main issues. They are not, in themselves, determinative.
Section 04
[name]
The main issues are the effects of the additional storey on the amenity of adjoining premises and the external appearance of the dwellinghouse and character and appearance of the area.
Section 05
Amenity
The appeal site is in a backland location to the rear of numerous properties which front both [address] and [address]. The proposed additional storey would include large windows which would serve bedrooms, with the west elevation facing the rear of No’s 39 and [address] and the east towards No’s 12 and [address].
While there are trees lining the boundary between the appeal site and No’s 39 and 41, I observed on the site visit that their height falls some way below the that of the proposal. As such, despite the pre-existing condition attached to the planning permission for the host dwelling itself, the addition of the large bedroom window at first floor level to this side would introduce significant overlooking of the gardens and rear elevations of No’s 39 and 41. This would detrimentally harm the enjoyment of these spaces for the occupiers, harming the amenity of these adjoining premises in the process.
To the other side, there is a tall, mature line of trees between the appeal site and No’s 12 and 14 which would screen the rear elevations and gardens of those properties. In combination with a slightly higher land level, from my observations there would be no overlooking or loss of privacy experienced by occupiers of No’s 12 and 14 and therefore no harm to the amenity of these properties.
While the structure would be visible from the rear gardens and windows of No’s 39 and 41, these would face the narrow side of the extension and views to other directions would remain open. Notwithstanding my findings with regards to overlooking, the proposal would not be overbearing when viewed from these positions. Given my findings with regards to No’s 12 and 14 and the position of the tall hedge, it follows that the extension would also not appear dominant from these properties either.
The appellant advises many other properties nearby have been extended, which has created opportunities for overlooking. These include No’s 23, 31, 39 and [address], the latter of which I observed on the site visit. However, I have no information on these, such as whether planning permission was granted, or they were undertaken using permitted development rights. In any event, I can only assess the proposal before me on its own merits.
Overall, the increased overlooking and ensuing loss of privacy to No’s 39 and [address] would cause significant adverse effects on the amenity of these adjoining premises. In this regard, the proposal would conflict with the Framework which requires at paragraph 130 a high standard of amenity for existing and future users.
Although not determinative, the proposal would also be contrary to Policies CS5 of the CS1, DM01 of the DMP2 and D3 of the LP3 which seek to ensure development proposals are designed to allow for adequate privacy and outlook for adjoining and potential occupiers and users, among other things. 1 Barnet’s Local Plan ([name]) Development Plan Document (adopted September 2012) 2 Barnet’s Local Plan (Development Management Policies) Development Plan Document (adopted September 2012) 3 The London Plan (adopted March 2021)
Section 06
Character and Appearance
The host property is a single storey detached dwelling with a flat roof located in a ‘backland’ location. It has a somewhat modular design with an asymmetrical form and an existing structure at first floor level in the middle of the roof. The local area is residential in character and is predominantly comprised of traditional brick and render facing detached and semi-detached dwellings which front [address] and [address].
The additional storey would not cover a large section of the roof and given the design of the property, the proposed box form with matching flat roof would be in keeping with the host building. Moreover, the property already differs from others in the area, and is not visible from either of the adjacent street roads due to its low profile. Therefore, the roof extension would not be harmful to the external appearance of the appeal property or the character of the area.
This would accord with paragraph 130 of the Framework, which seeks to ensure development is sympathetic to local character. The proposal would also accord with Policies CS5 of the CS, DM01 of the DMP and D3 of the LP, which seek to ensure all development should represent high quality design.
Section 07
Other Matters
My attention is drawn to two planning applications4 which the appellant argues do not reflect the character of the area but were approved regardless. I have very little information on these before me other than their references and a brief description. However, these appear to be much larger developments than the proposal before me which would have had vastly different considerations when assessed by the Council. They also appear to be full planning applications rather than prior approvals, the latter of which have set limitations and conditions in the GPDO. In any event, I have not found harm with regards to the character of the area.
[name].2(2)(a) is a condition requiring the materials used in any exterior work must be of a similar appearance to those used in the construction of the exterior of the existing dwellinghouse. The Elevations as Proposed plan ([name]. mp.24) confirms that vertical timber cladding would be used on the roof extension set against the predominant brick construction of the host building. [name] am dismissing the appeal on other matters, and the proposal would not be granted permission in this case, it was not necessary to consider these conditions.
Section 08
Conclusion
For the reasons given above, I consider the proposal would have an unacceptable harmful effect on the amenity of adjoining premises with regards to overlooking and a loss of privacy. I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 550No official casework-database value to compare
- Extracted decision date · page 1
- 26 January 2023Matches the official casework database
- Extracted site visit dates
- 10 January 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3303732
- Application reference
- 22/2110/PNU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Barnet
- Planning authority code
- E09000003
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 40 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 23 July 2022
- Valid date
- 23 July 2022
- Start date
- 6 September 2022
- Planning authority decision date
- 15 June 2022
- Appeal decision date
- 26 January 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 27102
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21