Appeal 3303909
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a 2-storey extension to the rear.
Section 02
Preliminary Matters
The application form describes the extension to No. [site address] (Appeal A) as a 2-storey rear extension. However, the submitted plan shows a part single-storey, part 2-storey rear extension and referred to as such in the decision notice. As a more accurate description of the proposal, Appeal A is determined based on a part single-storey, part 2-storey rear extension.
The Grounds of Appeal for No.52 (Appeal A) refer to the submission of a revised plan reconfiguring the proposed bedrooms. However, no plan has been provided and this appeal has been determined based on the plans submitted with the application.
The Grounds of Appeal for No. [address] (Appeal B) refer to the appellant’s willingness to accept a condition limiting the projection of the extension to 4m. No plan has been submitted to show the implications of the proposed change on either the extension at No. 52 or No. 48. Appeal B has been determined based on the submitted plan.
Separate planning applications for Nos. 50 and 52 were submitted, the Council decided each application separately and separate appeals were submitted. Despite the separate applications and appeals, the grounds of appeal indicate that, the extensions would be implemented as a joint project. Moreover, the plans show that the rear extensions would share a party wall Appeal Decisions APP/A0665/D/22/3303909 & APP/A0665/D/22/3303910 and the rear roof planes of both extensions would extend over the common boundary. Thus, it appears that neither extension could be built without the other. I have considered the appeals on this basis.
Section 03
Appeal A
The appeal is dismissed.
Section 04
Appeal B
The appeal is dismissed.
Section 05
Appeal A
These are, (a) the implications for neighbour’s living conditions with reference to outlook, privacy and light and (b) the occupiers’ living conditions with reference to bedroom size.
Section 06
Appeal B
These are, (a) the implications for neighbour’s living conditions with reference to outlook, privacy, and light and (b) the effect on the character and appearance of the host property and the area.
Section 07
Reasons
The development plan includes The Cheshire West and Chester Council Local Plan Parts 1 and 2 (LP). Providing generic guidance, [address] Extensions and Domestic Outbuildings Supplementary Planning Document (SPD) is read alongside LP policies and is a material consideration.
[name] 1, Policy ENV 6 and [name] 2, Policies DM2 and DM 3 seek high quality design, in particular extensions that respect the scale, character and appearance of existing buildings and are subordinate to the original dwelling and surrounding properties. [name] 1, Policy SOC 5 and [name] 2, [name] 2 and DM 21 seek to ensure that domestic extensions do not have a significant adverse effect on the amenities of neighbours with reference to outlook, privacy and on the amenity of future occupiers of the dwelling. Appeal A
Section 08
Neighbours’ Living Conditions
The SPD says that single-storey rear extensions projecting up to 4m from the original rear wall will usually be supported. Here, the submitted plan shows the depth of the extension matching that proposed for No 50 at some 5m. The ground floor extension would conflict with the SPD guidance.
Two-storey rear extensions projecting up to 4m from the original rear wall of a house will usually be supported, if the extension would not cross a 45- degree line taken from the closest part of any rear wall of a neighbouring house containing a habitable room window. The first-floor extension would project some 3.6m from the original rear wall. Whilst the appellant asserts that the 45 guidance would not breached, the approach used is inconsistent Appeal Decisions APP/A0665/D/22/3303909 & APP/A0665/D/22/3303910 with the SPD. Given there is no plan showing this exercise, it cannot be said with any certainty that the SPD guidance has been breached.
The proposal has been assessed on a worst case scenario that the extension would breach the 45 guidance. Given the conclusion that neither of the extensions could be implemented without each other, in respect of the impact on No. 50, there would be no change in terms of light, privacy, and outlook.
SPD guidance is generic and recognises that each proposal must be assessed on its own merits and circumstances. Here, No. 54 is located to the west and as such there would be no material impact on daylight or sunlight to the rear. Given the topography and the depth of gardens on this side of [address], and houses to the rear on [address], these houses enjoy a substantial open aspect to the rear. Whilst the ground-floor extension would be closer to the common boundary, the first-floor extension would be set back. Given, the open aspect, the extension would have no material impact on the outlook of No. 54. Other than bringing the furthest first-floor bedroom window from No. 54 forward by some 3.6m, there would be no material change to the degree of overlooking of the rear garden/amenity area of No. 54.
Drawing the above together, notwithstanding a potential breach of the 45 guidance, the part single-storey, part 2-storey extension would not unacceptably affect the living conditions of the occupiers of Nos. 50 and 54 through loss of outlook, privacy, daylight, and sunlight or conflict with development plan policy. Occupiers’ Living Conditions.
The Council refer to the size of the proposed bedrooms falling below those set out in the [name] – [name], March 2017. However, the introduction to the document sets out unequivocally, that, “The... standard for bedrooms... are relevant only in determining compliance... in new dwellings and have no other statutory meaning or use.” [name] 2 Policy DM 21 refers to the resultant development not having a significantly adverse effect on the amenities of future occupiers, I can find no specific guidelines on room sizes in the LP or SPD. The inclusion of the word “significantly” in the policy indicates a high bar. Here, the resultant rooms sizes are such that what is proposed would not result in a significant adverse effect on the occupiers’ living conditions. Accordingly, there would be no conflict with development plan policy. Appeal B
Section 09
Living Conditions
Here, the ground and first-floor extension would project some 5m from the main rear elevation. In addition, the first-floor extension, supported on brick piers at the front and rear corners, would extend out to the side, almost up to the common boundary with No.48. Given the conclusion that neither of the extensions could be implemented without each other, in respect of the impact on No. 52, the extension would not change the existing situation in terms of light, privacy, and outlook.
The appellant uses an approach to the 45 guideline that is inconsistent with the SPD. However, given the scale of the projection to the rear and side, I Appeal Decisions APP/A0665/D/22/3303909 & APP/A0665/D/22/3303910 am confident that the proposal would breach the guidance in the SPD to a material extent.
SPD guidance is generic and recognises that each proposal must be assessed on its own merits and circumstances. No. 48 sits to the east of No. 50, and notwithstanding the open aspect to the rear, there would be a material and unacceptable reduction in the amount of daylight and sunlight received by patio area and rear habitable rooms of No.48. Moreover, the substantial area of blank gable wall at first-floor level projecting 5m behind the rear elevation would appear dominant and overbearing when viewed from the rear patio and habitable room windows of No.48. The unacceptable loss of light and outlook would make No. [address] to live. As such there would be conflict with the development plan.
Section 10
Character and Appearance
The SPD indicates that side extensions have the potential to unbalance the symmetry of groups of existing buildings. Side extensions of similar height to the existing dwelling are supported where they are subordinate to the main building, set back at least 1m from the main part of the front wall and at least 1m from the side boundary and properly integrated into the main roof of the dwelling. Whilst the side extension would be close to the common boundary, the setback from the front main wall would be substantial. Thus, whilst the proposal would be glimpsed from [address], the substantial setback would ensure that there was no unacceptable impact on the street scene. Whilst the extension to No. 50 would be larger that proposed at No. 52, given the proposed lower ridge line, the use of a hipped gable and the extensive open aspect to the rear would ensure that the extension would appear subordinate not overwhelm the character of these houses. Accordingly, there would be no conflict with the relevant policies of the development plan.
Section 11
Conclusions
Notwithstanding my favourable conclusions in relation to Appeal A and the impact of the side extension to No. 50, given the respective extensions are proposed as a joint project and the conclusion that neither could be constructed in isolation, the unacceptable effect the extension to No. 50 would have on the living conditions of the occupiers of No. 48 means that both appeals must fail. Accordingly, given the conflict with the development plan and having considered all other matters, these appeals are dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1761No official casework-database value to compare
- Extracted decision date · page 1
- 14 February 2023Matches the official casework database
- Extracted site visit dates
- 25 January 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3303909
- Application reference
- 21/04503/FUL
- Lead case reference
- Not recorded
- Planning authority
- Cheshire West and Chester
- Planning authority code
- E06000050
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 19 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 July 2022
- Valid date
- 26 July 2022
- Start date
- 31 August 2022
- Planning authority decision date
- 19 July 2022
- Appeal decision date
- 14 February 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 28156
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21