Appeal 3303948
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension, 6m in length and 3m in height.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue in this case is whether the proposal constitutes development permitted under Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development)(England) Order 2015 (the GPDO).
Section 04
Reasons
The above class in the GPDO permits the enlargement, improvement or other alteration of a dwellinghouse without the need to seek specific planning permission from the Local Planning Authority beforehand. However, it lays down various conditions that apply, one of which states that, for an extension of the type before me, the development must not begin before the receipt of a written notice either giving prior approval or saying such approval is not required.
[name] visited, a rear extension had been built. [name] did not measure it, it appeared similar in size and siting to the scheme subject of this appeal. If this was in fact the appeal scheme, then the works had been undertaken before the receipt of a notice saying prior approval is either not required or is given. Therefore, they cannot now be given [name].
However, if what is before me to consider under this appeal is not what has been built, Schedule 2, Part 1, Class A of the GPDO gives a number of criteria where the enlargement, improvement or other alteration of a dwellinghouse would not be permitted under that class. Of these, the only one of contention in this case is criterion (j), which states the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse, and would— (iii) have a width greater than half the width of the original dwellinghouse.
No [address] of semi-detached dwellings that I understand were all built to the same design. This took the form of each house having a broadly rectangular footprint, with, on the rear, a bay window and a small projecting element (the projecting element). This arrangement is apparent at the other houses in the row that have not been subsequently altered. At the appeal property the bay window had at some point in the past been removed and the rear elevation it occupied had been extended out the same distance as the projecting element. The scheme before me is to demolish both the projecting element and the bay window extension, and extend out by 6m from the principal rear wall.
Guidance on criterion (j) in the Government’s advice in Permitted development rights for householders Technical Guidance (the Technical Guidance) says ‘A wall forming a side elevation of a house will be any wall that cannot be identified as being a front wall or a rear wall...Where an extension is beyond any side wall, the restrictions in (j) will apply’. This is accompanied by an illustration showing a house with rear elements of 2 different lengths, each of which is said to have walls forming a side elevation.
Having regard to this Technical Guidance, the elevation of the projecting element that faces towards the adjoining neighbour cannot be identified as either a front wall or a rear one. Therefore, although of limited length, it is nonetheless sufficient to constitute a ‘side elevation’ for the purposes of criterion (j). As such, given the extension would extend beyond this side elevation towards the adjoining property and would have a width greater than half the width of the original dwellinghouse, the development is not permitted under Schedule 2, Part 1, Class A of the GPDO.
The appellant considered the works were sustainable and would improve the quality of accommodation at the property. However, the planning merits of the scheme do not form part of assessing if it falls under Schedule 2, Part 1, Class A of the GPDO. Rather, this proposal has been considered against the very specific criteria that inform whether it is in fact development that is within the precise confines of what is permitted by the GPDO. If it falls outside of those criteria and so cannot be given prior approval, it does not automatically mean that any subsequent application for planning permission for the works would not be granted. Rather, if and when such an application was submitted, it would be for the Local Planning Authority to assess whether or not to grant it planning permission, having regard to the development plan, the planning merits, and all other material considerations relevant to the case.
He also referred to other extensions nearby that he considered to be similar, but, while I have noted the decisions submitted relating to some of them, my knowledge of the circumstances of those cases is limited. They might have been built without planning permission, could have been at properties with different original arrangements or could have been constructed after the grant of a specific application for planning permission. In any event their presence does not offer a justification for me to interpret the precise criteria of the GPDO in a different way.
Section 05
Conclusion
Whether the appeal scheme has in fact already been built or whether what is before me is different to what is now on site, I conclude the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 193No official casework-database value to compare
- Extracted decision date · page 1
- 30 March 2023Matches the official casework database
- Extracted site visit dates
- 10 March 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3303948
- Application reference
- 221867PALHE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Ealing
- Planning authority code
- E09000009
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 22 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 27 July 2022
- Valid date
- 27 July 2022
- Start date
- 7 December 2022
- Planning authority decision date
- 13 June 2022
- Appeal decision date
- 30 March 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 30554
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21