Skip to main content
Official casework recordAllowedCurrent release

Appeal 3304939

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

an extension to side and rear over three storeys.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the re-modelling of the dwelling to provide extension to the side and rear at [site address] in accordance with the terms of the application, Ref 2022/0242/FUL, dated 3 March 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Overall Site Plan APPEAL DG-02A, Proposed Ground Floor Plan APPEAL DG-11B, Proposed First Floor Plan APPEAL DG-12B and Proposed Elevations APPEAL DG-14A APP.

  2. Section 03

    [name]

    The description of development in the banner heading above is taken from the planning application form and is also reflected in the Council’s decision notice. However, the proposal, as shown on the submitted plans and reflected in the appeal form, is for a two storey side and rear extension. I have determined this appeal accordingly and adopted the more accurate description from the appeal form in the formal decision above, albeit with superfluous detail omitted.

  3. Section 04

    [name]

    The main issues in this case are a) whether the proposal would be inappropriate development in the Green Belt, and b) the effect of the proposal on the character and appearance of the area.

  4. Section 05

    Whether inappropriate development

    The appeal building is a two storey semi-detached dwelling occupying a raised position above the highway. It has an existing single storey element to the rear and a side bay window projection. The evidence suggests that both are considered part of the original dwellinghouse.

    Policy GN1 of the West Lancashire Local Plan 2012-2027 (October 2013) (the LP) states that development proposals within the Green Belt will be assessed against national policy and any relevant Local Plan policies.

    Paragraph 147 of the National Planning Policy Framework (the Framework) states that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances.

    The Framework states that new buildings should be regarded as inappropriate development in the Green Belt, subject to a number of exceptions. The extension or alteration of a building, provided that it does not result in disproportionate additions over and above the size of the original building, is one of these exceptions at paragraph 149 c).

    Neither Policy GN1 of the LP nor the Framework define what is meant by a disproportionate addition, however the Council’s Supplementary Planning Document, Development in the Green Belt (March 2015) (the SPD) provides guidance. Both main parties agree that the total volume of the proposed development would not result in an increase of more than 40% above the volume of the original building and I have no reason to disagree.

    I note that the figure of 40% is a guide only and that other factors may be taken into consideration. The proposal would have a limited projection to the side and rear and its overall height would be considerably less than that of the host dwelling.

    Therefore, taking account of its footprint, scale and bulk, the proposal would not be a disproportionate addition to the original dwelling. It would not therefore be inappropriate development within the Green Belt and thus would comply with Policy GN1 of the LP, along with the guidance in the Framework and the SPD.

    Given that the development does not amount to inappropriate development in the Green Belt, there is no need for me to go on to consider its effect on the openness of the Green Belt or assess other considerations and whether very special circumstances exist in order to justify the development.

  5. Section 06

    Character and appearance

    As noted, the proposed extension would have a limited side and rear projection. It would also be set well back from the front elevation of the dwelling. The roof form would be hipped, however the front plane would follow that of the host dwelling and, given the set back positioning of the extension and considerably reduced ridge height, this design would not appear visually awkward, even if readily apparent in the street scene due to the dwelling’s raised position and the scale of the adjacent bungalow.

    Accordingly, the proposal would not be an incongruous addition and thus would not result in harm to the character and appearance of the area. It would therefore comply with Policy GN3 of the LP which aims for extensions which relate to the existing building in terms of design and materials. It would also accord with Policy DP5 of the Supplementary Planning Document, [name] (January 2008) which seeks to ensure that developments respond to the characteristics of the site and do not disrupt the visual amenities of the streetscene.

  6. Section 07

    Conditions

    The Council has not provided a list of suggested conditions in the event that the appeal were to be allowed. In the interests of certainty, conditions specifying the time limit and the approved plans are necessary. A condition requiring the proposal to be finished in specific materials is not necessary as they are specified on the approved plans.

  7. Section 08

    Conclusion

    The proposal accords with the development plan as a whole, thus the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1499No official casework-database value to compare
    Extracted decision date · page 1
    13 February 2023Matches the official casework database
    Extracted site visit dates
    25 January 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3304939
Application reference
2022/0242/FUL
Lead case reference
Not recorded
Planning authority
West Lancashire District Council
Planning authority code
E07000127

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
35 m²
Number of residences
1
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
10 August 2022
Valid date
10 August 2022
Start date
28 October 2022
Planning authority decision date
19 May 2022
Appeal decision date
13 February 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
28039
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21