Appeal 3305206
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the construction of a single storey ground floor rear extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for the construction of a single storey ground floor rear extension in accordance with the terms of the application, Ref 22/501594/FULL, dated 25 March 2022 , subject to the following conditions:
The development hereby permitted shall be carried out in accordance with the following approved plans: 778/1A and 003 Rev 4.
Within 2 months of the date of this decision, details of the colour and finish to the adjoining wall of the extension with No [address] shall be submitted to and approved in writing by the local planning authority. The agreed details shall be fully implemented within 4 months of them being approved.
Section 03
[name]
The main issues are: whether the development preserves or enhances the character or appearance of this part of the Faversham Conservation Area; and the effect of the development on the living conditions of the occupiers of the adjoining residential property at No [address].
Section 04
Conservation Area
The appeal property comprises a two storey terraced house located on the western side of Park Road and close to its junction with [address]. At the rear there is a two storey extension adjoining the common boundary with No [address], and beyond that a single storey extension with a mono pitched roof. Between the two storey extension and the rear common boundary with No [address], a single storey extension has been constructed with a mono pitched roof facing No 9 and which has a rendered finish apart from the side of the common wall facing No 9 which is untreated blockwork. The Council advises that the extension is 2.2m wide x 3.05m deep x a maximum 2.8m high. It is this extension which is the subject of this appeal and which permission is sought to retain. This is not to be confused with an earlier application which was refused planning permission by the Council and which the agent advises was for a longer depth of 3.94m1.
Beyond the extension, a covered but open structure has also been constructed, extending to the end of the single storey extension. However, this is not shown on the submitted plans and therefore does not form part of my consideration of this appeal.
Because of its location within the Conservation Area, there is a statutory duty for special attention to be given to the desirability of preserving or enhancing the character or appearance of that area. In that respect, the Council is concerned that the rendered finish in particular is inappropriate and detracts from the appearance of the Conservation Area. Although the appellant suggests that did not appear to be a specific concern from the transcript of the Committee Minutes of the meeting on 21 July 2022, I note that the formal minutes included references to concern about design generally including materials.
The size of the extension, and particularly its depth, largely complies with the Council’s Supplementary Planning Guidance on extensions which refer to extensions being a maximum of 3m in depth. As the officer report notes, such infill extensions are fairly typical on a property of this sort and indeed I noticed other similar extensions nearby. Although there is a glimpsed view of the extension from [address] it is primarily the roof structure only and it is by no means prominent in the street scene.
Turning to materials, the roof tiles match those of the main roof. Although the walls have been finished in render rather than matching brickwork to the main house, there is considerable evidence of rendered finishes elsewhere. This includes the adjoining property at No 9, where the whole of the ground floor and side boundary wall are rendered, the front elevations of several properties along Park Road, and the rear elevations of properties in [address], including rear extensions. I therefore do not consider that the argument that a rendered finish is inappropriate to the area can be reasonably sustained.
Part of the Council’s concern appears to relate to the unfinished treatment of the boundary wall of the extension facing No 9. That is understandable and I agree it currently looks unsightly. However, a condition can be imposed to require details of an acceptable finish to be applied and I note that the appellant is agreeable to such a condition.
For the reasons set out I find that, subject to an appropriate condition, both the character and appearance of the Conservation Area would be preserved. The development therefore complies with policies CP4, DM14, DM16 and DM33 of the Council’s Local Plan Bearing Fruits 2031 (LP) in that amongst other criteria set out in those policies, it is appropriate to its location and surroundings, is an appropriate design and quality, and would preserve the features that contribute to the special character of the Conservation Area. 1 Application reference 18/505539/FUL
Section 05
Living conditions
At my site visit I was able to inspect the relationship of the extension with No 9 from within the latter’s rear garden as there is a right of access to the appeal property at the rear. I noted No 9 has a rear facing window to a living room which also appears to have been increased in size from the original at some point in the past. There is also a large window and door facing the extension wall which serve a kitchen. As with any extension on the common boundary between properties, there is bound to be some impact arising. That is the case here, and indeed I note from a photograph in the grounds of appeal that the previous common boundary treatment between the two properties consisted of a high boundary wall with a trellis fencing on top. That would also have had some impact upon light entering the rear facing window of No 9 and also outlook from the room it serves. Although the boundary wall of the extension apparently projects slightly over the rear common boundary, given the limited depth and height of the extension, I do not consider that any impact in respect of loss of light or outlook is of such an extent that permission should be refused for that reason alone.
I therefore find that the impact upon the living conditions of the occupiers of No 9 is acceptable. Accordingly, the development complies with policies CP4, DM14 and DM16 of the LP in that amongst other criteria set out in those policies, there is no significant harm to amenity.
Part of the concern from the adjoining occupier at No 9 appears to relate to the apparent encroachment of the rear common boundary by the flank wall of the extension. However, I note that from a planning point of view the requisite ownership certificate has been served and that the issue is primarily a civil one, as officers advised in their report to the Planning Committee, which would need to be resolved between the parties as a separate matter to the planning process.
Section 06
Conclusion
For the reasons set out above, the character and appearance of the Conservation Area would be preserved, and there would be no significant harm to the living conditions of the occupiers of No [address].
A condition for the development to be built in accordance with the approved plans is necessary in the interests of certainty. A condition requiring details of the finish of the flank wall of the extension facing No 9 and for that finish to be completed within a reasonable timetable, is also necessary in the interests of visual amenity.
Accordingly, the appeal is allowed and planning permission granted.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1737No official casework-database value to compare
- Extracted decision date · page 1
- 2 March 2023Matches the official casework database
- Extracted site visit dates
- 31 January 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3305206
- Application reference
- 22/501594/FULL
- Lead case reference
- Not recorded
- Planning authority
- Swale Borough Council
- Planning authority code
- E07000113
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 15 August 2022
- Valid date
- 30 August 2022
- Start date
- 28 November 2022
- Planning authority decision date
- 27 July 2022
- Appeal decision date
- 2 March 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 29127
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21