Skip to main content
Official casework recordDismissedCurrent release

Appeal 3305907

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a loft conversion including a dormer window at third floor/roof level to the rear/south elevation.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue of the appeal is the effect of the proposed dormer extension on the character and appearance of the [address] Conservation Area.

  3. Section 04

    Reasons

    The appeal site is located on [address], within the [address] Conservation Area. The Conservation Area Study1 suggests the significance of the [address] Conservation Area is linked to the historical crossing of the Thames in Kew, firstly by foot, followed by the opening of the bridge in 1759, which combined with the creation of [address]. The Study acknowledges [address] has always been an historic link between Richmond and Kew. Reference to [address] is made within the Study where it explains there are four streets, between [address] and [address], of Victorian houses notable for their variety of size and style, all linked by a high quality of townscape.

    Whilst there is a variance in the design and style of properties along [address], the retained historic appearance of most of the properties is representative of the time in which they were built and contributes to the high quality of townscape and therefore the significance of the Conservation Area. The appeal property is also designated as a Building of [name] (BTM).

    Although there are a variety of roof projections in the area, the appeal property forms part of a terrace block with a largely uniform roofscape. The roofscape to the rear of the terrace properties is defined by two chimney stacks, as well as two single dormer extensions on the roof of [address] (No. 6). Some 1 Conservation Area Study Kew Foot Road no.36 & [address] no. 50, London Borough of [name] neighbouring properties have roof lights, but they are set within the profile of the roof.

    The two single dormer extensions to No. 6 are materially different to the appeal scheme as they are not joined by a central recess. The principle of rear dormer extensions and the precedent set by other dormer extension is not disputed. However, the inclusion of the recess between both dormer windows would add to the massing of the proposed extension. Whilst the proposed dormer extension does not increase the ridge height of the property and there is a modest amount of space below and to both sides of the proposed dormer extension, due to the inclusion of a central recess it would still cover a large expanse of the roof.

    Due to its massing, the proposed extension would appear as the most visually dominant feature on the roof, and as such it would significantly alter the appearance of the roofscape. The proposed development would therefore have a harmful effect on a BTM as it would appear as an incongruous feature within the roofscape and would appear unsympathetic to the historic setting of the appeal property, when view from neighbouring gardens and [address].

    The proposed development is therefore contrary to the [name] which indicates the sympathetic adaptation of the buildings can preserve and increase the attractiveness of an area. The proposed development is also contrary to guidance within the [name] SPD2, which states roof extensions should not dominate the original roof.

    Imposing a condition which relates to the proposed materials would somewhat reduce the impact of the proposed extension as it would help blend the central recess into the roofscape. However, the proposed extension would still appear as an alien feature due to its massing.

    Given the modest scale of the proposed development I conclude that less than substantial harm would be caused to the significance of the Conservation Area. There is little to no public benefit derived from the proposal, the public benefits would therefore not outweigh the harm. On this basis, it would not accord with the guidance within the National Planning Policy Framework which seeks to conserve and enhance the historic environment.

    I conclude that the proposal would have a harmful effect on the BTM and by extension, the character and appearance, and significance of the Conservation Area. Public benefits have not been demonstrated that would outweigh the harm. Therefore, the proposal would conflict with Policies LP1, LP3, and LP4 of the London Borough of Richmond Upon Thames Local Plan, adopted July 2018, that seek to ensure that development proposals relate to their context and preserve and enhance conservation areas and BTMs.

  4. Section 05

    Other Matters

    Even if the proposed development complies with Policy LP8 of the Local Plan, insofar that it did not harm the living conditions of future occupiers or neighbouring residents, and the proposal allows for a sufficient amount of internal space these would be neutral factors. 2 [address] Extensions and [name], May 2015, London Borough of [name]

  5. Section 06

    Conclusion

    The proposed development conflicts with the development plan when considered as a whole and there are no material considerations, either individually or in combination, that outweighs the identified harm and associated development plan conflict.

    Therefore, for the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5389No official casework-database value to compare
    Extracted decision date · page 1
    1 February 2023Matches the official casework database
    Extracted site visit dates
    13 December 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3305907
Application reference
22/1515/HOT
Lead case reference
Not recorded
Planning authority
Richmond Upon Thames London Borough Council
Planning authority code
E09000027

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
26 August 2022
Valid date
26 August 2022
Start date
13 October 2022
Planning authority decision date
4 July 2022
Appeal decision date
1 February 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
27426
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21