Skip to main content
Official casework recordAllowedCurrent release

Appeal 3305956

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the construction of a vehicle crossing.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the construction of a vehicle crossing at [site address] , Sutton, [name] [postcode] in accordance with the terms of the application, Ref DM2022/00537, dated 20 March 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Plan of [name] (scale 1:100); Plan of Frontage with [name] (scale 1:100); Plan of Frontage with [name] (scale 1:50); and Location Plan (scale 1:1250) [name] 31 March 2022.

  2. Section 03

    Procedural Matters

    I have removed the address of the appeal property from the description of the development as this is not necessary and this provides a more accurate description of the development.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the safe and efficient operation of the highway network in the vicinity of the appeal site and pedestrian safety.

  4. Section 05

    Reasons

    The appeal property fronts to the public footway and highway to the north-east. Within the front garden area of the appeal site, approximately two-thirds of its north-eastern boundary are open to the footway, which is commensurate in width with a hardstanding area, however there is no dropped kerb to the highway itself. At the time of my visit, a domestic vehicle was parked on the hard surfaced area. The remaining third of the front garden of the appeal site is enclosed to the adjacent footway by a boundary wall with hedging and the space thereafter is laid to an area of lawn.

    The appeal proposal relates to the provision of a dropped kerb to the public highway and a vehicle crossing point over the adjacent footpath to the north-eastern end of the appeal site. The location of such directly adjoins an existing dropped kerb and access serving the neighbouring dwelling no.573.

    The appeal property itself is a two storey dwelling, and is relatively wide in its plot compared to neighbouring properties. At its eastern end the property has a garage doorway with accommodation above. I have been made aware of a planning decision dating from 20011, which indicates the garage as forming part of a wider extension to the property, this decision notice also includes reference to the ‘formation of access onto classified road.’

    On the footway, directly outside of the appeal site there is a bus stop operated by Transport for London (TfL). The bus stop sign and timetable is fixed to a pole positioned adjacent to the section of the appeal site that is enclosed by the boundary wall and hedging. During my visit, I noted that individuals waiting at the bus stop stood aside the boundary wall.

    On the highway itself, double red lines which delineate an area where vehicles are not allowed to stop at any time, run from the road junction to the north-west to a point just beyond the north-eastern corner of the front boundary of the appeal site, thereafter, these lines continue as double yellow. A bus stop area is also delineated on the highway running the entire length of the appeal site.

    I have also been provided with copies of correspondence between the appellant’s late father and the Council dating back to 2000 regarding the potential for the installation of a vehicle crossing to serve the appeal property. Further, the appellant has provided me with a plan2 from the Transport Planning & Works Section of the Council delineating ‘Bus Stop Accessibility Gander Green Lane’ which indicates an area to the front of the appeal site termed ‘cross-over to property unaffected by the proposal.’

    As the property has a garage; non-enclosed hardstanding areas to part of the front section of the appeal site; reference to the formation of an access onto the highway to the north in a decision notice from 2001 which it appears related to the garage extension; photographs of the parking area in use over time; alongside the various other correspondence provided through the submissions; it is evident to me that off-street parking and traffic movements onto the highway are associated with the use of the appeal site already in planning terms.

    I note that TfL and the Council’s highways officer have raised objections to the proposal and explain that they are concerned about a potential conflict with pedestrians waiting at the bus stop; the implications of a dropped kerb with regard to the deployment of disability ramps from a bus; and wider concerns about the limited manoeuvrability on the appeal site, which they consider would be likely to result in vehicles either reversing out onto the highway, or stopping and reversing back into the site from the highway itself. 1 A2001/47032 for the ‘Erection of a two-storey side extension and formation of access onto classified road.’ 2 T7051/PL1&2

    However, I am not convinced that the appeal proposal would lead to any significant conflict with individuals waiting at the bus stop, the stop is not in the same place as the location for the proposed drop kerb, the stop itself being sited approximately 5 metres away to the north, whereby individuals waiting for the bus stop, would in my view instinctively wait against the boundary wall to the eastern boundary of the appeal site, as I experienced during my visit. Due to the separation distances involved, and the available safe pedestrian stopping area against the boundary wall, I thereby consider that it would be highly unlikely that individuals would be positioned on the footpath, awaiting the bus, at the location of the proposed dropped kerb and vehicular crossing.

    Further, I do not see how the proposal would prejudice the deployment of a disability ramp from a bus, the proposal relates to a crossing point and dropped kerb for approximately one quarter of the site frontage, adjacent to an area of existing dropped kerb, the remainder of the highway closest to the bus stop pole itself would remain as is the case at present.

    I acknowledge that manoeuvrability within the site itself, to enable vehicles to enter and leave in a forward direction would involve a number of movements, and this may lead to individuals reversing out or into the appeal site. But this is the case for numerous other properties along the street, including those to either side of the appeal property. Further, as outlined, the appeal site contains a garage with planning permission from 2001, reference to the formation of an access in the same decision notice and an existing hardstanding area. In this context, I do not see how the appeal proposals would result in a significant increase in conflict with users of the footway and highway.

    I find, therefore, that the proposed development would be acceptable, that it would not conflict with Policies 36 and 37 of the Sutton Local Plan 2016-2031, adopted February 2018, or any of the corresponding policies of the National Planning Policy Framework 2021.

  5. Section 06

    Conditions

    The standard time limit is required together with a condition listing the plans in the interests of certainty.

  6. Section 07

    Conclusion

    For the reasons given above, having regard to all matters raised, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4127No official casework-database value to compare
    Extracted decision date · page 1
    15 December 2022Matches the official casework database
    Extracted site visit dates
    29 November 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3305956
Application reference
DM2022/00537
Lead case reference
Not recorded
Planning authority
London Borough of Sutton
Planning authority code
E09000029

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
26 August 2022
Valid date
26 August 2022
Start date
2 November 2022
Planning authority decision date
9 June 2022
Appeal decision date
15 December 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
25289
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21