Skip to main content
Official casework recordAllowedCurrent release

Appeal 3305997

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a Type 3 roof extension.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for erection of a Type 3 roof extension at [site address] , Tottenham, London [postcode] in accordance with the terms of the application [name]/2022/1865 dated 30 June 2022 subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan Drawing No. WA.109-111.LP dated 18 June 2021; [name]. WA.109.EX.101 dated 29 June 2022; [name]. WA.109.EX.102 dated 29 June 2022; [name]. WA.109.PR.101 dated 29 June 2022; [name]. WA.109.PR.102 dated 29 June 2022; Existing & Proposed Section Drawing No. WA.109.EX&PR.103 dated 29 June 2022; and [name].

    The solar photovoltaic system shall be installed in accordance with the approved plans and thereafter shall be operated, maintained and retained as installed.

  2. Section 03

    [name]

    The main issue is the effect of the proposed development on the operation of the solar arrays on the neighbouring property at No [address] as a result of overshadowing and a detrimental effect on climate change.

  3. Section 04

    Reasons

    The site is a two storey terraced dwelling on the residential street of [address]. It has a front and rear dormer, which the proposal seeks to replace with a Type 3 roof extension. No. 107, the neighbouring property to the west, is a two storey dwelling with a photovoltaic solar array on its front roof slope for electricity generation and a solar thermal array to the rear for hot water.

    The main issue relates to the effect of the proposal on the neighbouring renewable energy installation due to overshadowing. This topic has previously been addressed by the courts1. It was held that the fact a neighbour may have to pay increased energy costs due to producing less electricity from their solar panels may not be a material consideration. However, it was established that overshadowing of solar panels is a material planning consideration with regard to the part they play in addressing climate change, and that even individual microgeneration schemes are in the public interest.

    A similar scheme at the site to that proposed was the subject of a previous appeal decision2, a copy of which has been provided. This was identical to the current proposal but for the fact that it did not include a photovoltaic solar array, which it is now proposed to be installed at the site. The Inspector found the assessment of overshadowing and energy generation had been undertaken in accordance with outdated guidance such that the loss of generating capacity in the equipment at No. 107 was unclear. In addition, it was held that there was a failure to provide mitigation for any such loss in generating capacity that may arise. The Inspector concluded that “it remains open to the appellant to adapt the roof extension and resubmit the proposal with a fully detailed renewable generation scheme that mitigates the impacts”.

    [name]. 107 is to the west of the site, the main issue relates to the extent to which there would be a reduction in sunlight to the equipment in the morning, with it being otherwise in shade for much of the day. The appellant has submitted an updated assessment of potential shading with this appeal. It is based on updated guidance that has not been queried by the Council or interested parties, and assesses the situation during morning hours at various times of the year, based on the four equinox dates. Illustrations for shading are also provided in the report.

    With regard to the rear solar thermal array, the assessment finds that overshadowing as a result of the proposal occurs during the mornings of the winter and spring periods, at times the collector would not be generating hot water due to air temperature. It further concludes that the proposal would not overshadow the array in summer after 08:00. Overall it therefore finds that the proposal would have no impact on the generation of hot water at No. 107.

    With regard to the front solar array, the assessment finds limited overshadowing as a result of the proposal during winter months. More notable impacts arise during these periods: 08:30 April/ August; 07:30, 08:30, 09:30 March/ September; and 07:30, 08:30 May/ July, at which times the additional percentage of the array that would be in shade ranges from 23-75%. The assessment calculates this to be an average daily loss of 1.67% of the energy generating capacity of the panels, which it states equates to 300kwh per year.

    Based on my observations, and in the absence of technical or substantive evidence to the contrary, I have no reason to doubt the findings of the assessment provided by the appellant. As such, the proposal would result in a loss of the generation of 300kwh per year of renewable energy at No. 107. While this represents a modest amount of the overall energy generating capacity of the panels, it would nevertheless have a detrimental effect on climate change in negatively impacting the generation of renewable energy. 1 McLennan, R v Medway Council & Anor [2019] EWHC 1738 (Admin) 2 APP/Y5420/D/22/3291608 10.To address this, a photovoltaic solar array would be installed at the appeal property. Submitted information estimates the annual generating capacity of these panels to be over 2000kwh. This would generate a level of renewable energy that would be well in excess of that lost at No. 107 due to overshadowing. It would therefore result in a net increase of renewable energy generation, which in serving to address climate change, would be in the public interest. 11.The appeal has also been accompanied by an [name], outlining how the proposal would follow the principles of the energy hierarchy through energy efficient design and measures to reduce the risk of potential overheating. It reviews various energy efficient systems and low or zero carbon energy sources, highlighting which would not be viable at the appeal site, and that photovoltaic panels offer high carbon saving. The statement concludes that the proposal will achieve the required level of carbon reduction through an enhanced fabric and energy efficient systems alone, in addition to generating energy by the proposed solar panels. 12.For the reasons given I find the proposal would have a detrimental effect on the operation of the solar arrays on the neighbouring property at No [address] as a result of overshadowing. However, this is harm is outweighed by the proposed installation of solar panels at the appeal property which would ensure that overall it would have a positive effect on climate change. It would not conflict with Policies D6 and SI2 of the London Plan 2021, Policies SP4 and SP11 of the Haringey Local Plan Strategic Policies 2013 - 2026 or Policies DM11 and DM21 of the Haringey Development Management DPD 2017 insofar as they seek to ensure quality and sustainable development that applies the energy hierarchy, reduces carbon and greenhouse gas emissions, and ensures that climate change impacts are minimised.

  4. Section 05

    Other Matters

    Interested parties have raised concerns that the proposal would also result in overshadowing of habitable rooms and gardens of neighbouring properties in addition to causing harm to the character of the area. I note that these did not form part of the reasons for refusal in this case and that the Council has not raised such concerns. On my observations and the submitted information I have no reason to disagree with the Council on these matters.

    I acknowledge that the proposal has not adapted the roof extension from the previous scheme beyond the installation of the solar panels. Nevertheless, I find that the proposal before me would overcome the concerns of the previous Inspector with regard to impacts on climate change.

    The potential for the proposal to establish a precedent has been raised However, it has been assessed based on the specific circumstances of the site and the evidence before me. Little weight can be given to precedent in decision making as each case is considered on its own merits. Concerns regarding a party wall agreement are a civil matter and are therefore beyond the scope of this appeal.

  5. Section 06

    Conditions

    The standard time limit condition as well as a condition that the development is carried out in accordance with the approved plans are necessary in the interests of certainty and proper planning. The approved plans condition includes reference to the [name]. A condition relating to the materials is not necessary as it is noted on the plans that these will match the existing building. I have also attached a condition that the solar panels shall be operated, maintained and retained at the site in the interests of climate change.

  6. Section 07

    Conclusion

    For the reasons given, the proposal would accord with the development plan when taken as a whole. There are no material considerations worthy of sufficient weight that indicate the appeal should be determined other than in accordance with the development plan. The appeal should therefore be allowed subject to the conditions in paragraph 1 of this decision.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 816No official casework-database value to compare
    Extracted decision date · page 1
    23 March 2023Matches the official casework database
    Extracted site visit dates
    6 December 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3305997
Application reference
HGY/2022/1865
Lead case reference
Not recorded
Planning authority
London Borough of Haringey
Planning authority code
E09000014

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
22 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 August 2022
Valid date
29 August 2022
Start date
4 October 2022
Planning authority decision date
25 August 2022
Appeal decision date
23 March 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
30107
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21