Appeal 3306009
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of single storey side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the area, specifically relating to a protected tree.
Section 04
Reasons
The appeal property is a 2-storey detached house on a moderate sized plot. The house is positioned in the middle of the plot with garden space on all sides. Not far from the property is a protected oak tree (TPO/06/22), which although is located within a neighbouring property’s rear garden, is positioned close to the boundary fence with the appeal property. Some principal branches of the tree currently overhang the garden space of the appeal property where the proposed extension would be located.
I saw on site that the protected oak tree is a significant feature of [address] that provides an attractive vista from the access drive. It can also be seen from other parts of the wider residential area, including [address] and [address], and is a positive addition to the street-scene in these locations. Overall, it is a good size and makes an important contribution to the verdant character of the area.
The proposal is supported by a Tree Report prepared by SMW (Tree) Consultancy Ltd. It identifies that the foundations of the proposed extension would intrude into the Root Protection Area (RPA) of the protected tree. It calculates the intrusion to be 3.59%. It concludes that, given the tree has no other root growth restriction, this very minor intrusion would not affect the trees current health provided specialist foundations are used.
I understand that [name] on Trees in Relation to Design, Demolition and Construction (BS5837) recommend locating structures outside of the RPA of trees to be retained, and where operations are proposed within the RPA, it should be demonstrated that the tree can remain viable and that the area lost encroachment can be compensated for elsewhere, contiguous with its RPA. The likely tolerance of the tree to root disturbance or damage, based on factors such as species, age, condition and past management should also be considered.
As identified in the comments of the Council’s Arboricultural Officer, there has been previous incursions into the RPA of the protected tree. I saw on my site visit that there is a driveway to the north and shed at the base of the tree that have both been constructed within the RPA. In addition, there was also a pergola type structure within the RPA. It is likely that these incursions would have reduced the RPA of the tree, however it appears that they have not been taken into consideration in the Tree Report. The Tree Report therefore does not adequately assess the impact of the proposal on the tree, and despite the proposed specialist foundations, there is no evidence before me that the tree would remain viable after further incursion into its RPA.
In terms of future pressure to prune or remove the tree, although the amount of canopy which would overhang the proposed extension could be considered small, I saw it would include some principal branches. The branches would be significantly higher than the single storey extension and therefore there would be no risk of direct damage to the extension from contact with these branches moving in the wind. Also, given the relationship between the proposed extension and the tree and the position of the proposed windows, it is unlikely that there would be a significant impact on the light received by or the outlook from the extension. Nonetheless, there would be leaf litter that would likely affect gutters and there would also be the perception that significant damage to the extension would result if the tree was compromised in any way. Given this, despite the tree being protected, there is a tangible risk that the proposal would result in future pressure to extensively prune or remove the tree.
The appellant has provided a map showing the location of oak trees in the surrounding area of [site address] where there has been planning applications approved for development that has resulted in RPA encroachment greater than the 3.6% that would result from the proposal. However, I do not have any details of the approved developments before me, nor any details of the affected trees with regards to their condition or value or whether they are protected. In any event, each application should be judged on its own merits. I have judged the proposal based on the evidence before me and my own observations and cannot rule out harm to the long-term viability of the protected tree.
For the reasons above, it has not been demonstrated that the proposal would not result in harm to the long-term viability of the protected tree. The proposal therefore conflicts with Policy DM9 of the [name] and Development Management Policies (2012), which seeks to ensure that new development protects trees. It would also conflict with the aim of the National Planning Policy Framework to retain existing trees wherever possible.
Section 05
Other Matters
The appellant asserts that there have been procedural failings during the Council’s determination of the application. It has been put to me that the Council failed to discuss the application with the appellant. Also, that the Council did not allow opportunity for the tree report to be updated or for resolutions to be identified to address the concerns raised by the Council’s Arboricultural Officer. Whether or not that was the case, and while I appreciate the appellant is keen to identify an agreeable design solution, I must consider the appeal before me and cannot rule out harm to the long-term viability of the protected tree.
Section 06
Conclusion
With regard to the above, I find the proposal would conflict with the development plan, read as a whole. It has not been demonstrated that there are any material considerations of sufficient weight to indicate that a decision should be taken otherwise in accordance with it. The appeal is therefore dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2938No official casework-database value to compare
- Extracted decision date · page 1
- 22 December 2022Matches the official casework database
- Extracted site visit dates
- 30 November 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3306009
- Application reference
- 22/0435/FFU
- Lead case reference
- Not recorded
- Planning authority
- Surrey Heath Borough Council
- Planning authority code
- E07000214
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 20 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 29 August 2022
- Valid date
- 29 August 2022
- Start date
- 27 October 2022
- Planning authority decision date
- 12 August 2022
- Appeal decision date
- 22 December 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 25703
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21