Appeal 3306120
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
two storey and single storey side extension with pitched roofs.
Section 02
Decision
The appeal is dismissed.
Section 03
Background and Main Issue
The application for the proposed development follows a similar development approved by the Council (ref: 2021/2421). The principal difference is that the development before me proposes a two-storey element across the full width of the extension, rather than set in from the side.
The main issue is the effect of the development on the character and appearance of the area, with particular regard to the proximity of the first-floor element to the neighbouring dwelling.
Section 04
Reasons
The western side of [address] is characterised by detached houses in spacious grounds. Most retain an element of space between neighbouring buildings at first floor level, and some are set back behind trees.
The appeal building is a two-storey dwelling of traditional design, with a hipped roof and front and rear gables. Coniferous hedgerows above brick and stone walls along the street frontage of the appeal building and [address] (No 22) reduce the visibility of ground floor elements. At the same time they frame, and increase the prominence of, the upper parts of the dwellings in the street scene.
The existing gap between the properties at first floor level provides space which respects the distinctly different designs of the appeal dwelling and No 22, which stands on the boundary between the properties.
The proposed and approved schemes are similar in many respects, but the proposed additional width at first floor level would result in a very close association between the appeal building and No 22. I note that the two-storey element of the proposal would be set back, but would nevertheless be a visible feature from the street. Given the prominence of the upper floors in the street scene, and the distinctly different designs and materials, the proposed development would unduly reduce the space between the dwellings, and would harm the character and appearance of the area.
In conclusion, the proposed development would harm the character and appearance of the area, with particular regard to the proximity of the first-floor element to the neighbouring dwelling. Consequently, it would conflict with Policies DM3.4 and DM3.8 of the South Norfolk Local Plan Development [name] (2015) and Policy 2 of the [name] for Broadland, Norwich and [name] (2014). Together these policies require high quality design which maintains or enhances the character and appearance of the building, street scene and surroundings. It would also conflict with Chapter 12 of the National Planning Policy Framework, which seeks to achieve well-designed places.
Section 05
Other Matters
No 22 is built along the boundary between the properties, but I must consider the development in relation to existing development. Although the appellant advises that the occupants of No 22 are known to the Council’s planning officer, I have made my decision as an independent party. The absence of harm in relation to other aspects of the design is a neutral
Section 06
Conclusion
I therefore conclude the development would conflict with the development plan as a whole and the approach in the Framework. There are no other material considerations that require a decision to be made other than in accordance with the development plan, and the appeal should therefore be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2135No official casework-database value to compare
- Extracted decision date · page 1
- 4 May 2023Matches the official casework database
- Extracted site visit dates
- 4 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3306120
- Application reference
- 2022/0460
- Lead case reference
- Not recorded
- Planning authority
- South Norfolk District Council
- Planning authority code
- E07000149
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 48 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 31 August 2022
- Valid date
- 31 August 2022
- Start date
- 19 January 2023
- Planning authority decision date
- 9 June 2022
- Appeal decision date
- 4 May 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 32109
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21