Appeal 3306194
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a boundary fence.
Section 02
Decision
The appeal is allowed and planning permission is granted for the erection of a boundary fence at [site address] in accordance with the terms of the application Ref 22/P/00708, dated 29 March 2022, subject to the conditions set out in the attached Schedule to this decision.
Section 03
Procedural matter
The fence subject of the appeal has already been erected and the appellant, in effect, wishes to retain it. I shall proceed on this basis.
Section 04
Main issue
The main issue is the effect of the development on the character and appearance of its surroundings.
Section 05
Reasons
The appeal property is a semi-detached dwelling set within a large residential estate. The pair is sited at the base of a triangle formed by the two branches of the highway that runs alongside them on either side. The timber fence is supported by concrete post and has been erected mainly along the flank highway frontage of the appeal property, but also along short stretches around the corners of the plot. A pedestrian access door has been inserted in the fence, coinciding with the main door of the house which is sited in the side elevation.
I fully understand the need for a form of enclosure since otherwise, given the shape of the plot and its orientation, the dwelling and its garden would enjoy little or no privacy or security. I understand that the boundary was hedged in the past.
The Council is concerned that the length of fence erected in what it considers to be a prominent position is such as to render it unduly dominant and incongruous, failing to respect the character of the surrounding area. The Council acknowledges that some timber fencing exists ‘in sight of the appeal property’, albeit none is as sizeable as that subject of appeal.
I explored more of the surrounding area and found a wide variety of means of enclosure throughout the estate, including significant stretches of timber fencing of different types. I could not therefore reasonably conclude that the fence erected was uncharacteristic of the area.
I noted too that the fence was comprised of good quality materials, and that trees have been newly planted within the garden border inside the fence at the western end. Foliage can already be seen above the hedge and in time, as they grow, the trees will assist in softening the impact caused by the newness of the fence. I consider that a similar level of tree planting within the garden of an appropriate species would assist in a like manner towards the eastern part of the site. This mitigation could be achieved by condition.
On balance I conclude that, with appropriate mitigation, the retention of the fence would not harm the local street scene to the extent that permission should be withheld. Accordingly, no conflict arises with those provisions of policy D1 of the Guildford Borough Local Plan 2015 - 2034 saved policy G5 of the Guildford Borough Local Plan 2003 directed to ensuring that development reflects and reinforces the identity and character of an area.
Section 06
Conditions
Since the development has taken place, the Council does not consider that any conditions are necessary, should permission be granted. However, for the reasons set out above, and in the interests of visual amenity, I shall impose conditions directed to the provision of additional planting designed to assist in acceptably mitigating the effects of the fence.
Section 07
Other matters
All other matters referred to in the representations have been taken into consideration, including the references to the National Planning Policy Framework, but no other matter raised is of such strength or significance as to outweigh the considerations that led me to my conclusions.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2949No official casework-database value to compare
- Extracted decision date · page 1
- 13 December 2022Matches the official casework database
- Extracted site visit dates
- 24 November 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3306194
- Application reference
- 22/P/00708
- Lead case reference
- Not recorded
- Planning authority
- Guildford Borough Council
- Planning authority code
- E07000209
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 1 September 2022
- Valid date
- 1 September 2022
- Start date
- 8 November 2022
- Planning authority decision date
- 20 July 2022
- Appeal decision date
- 13 December 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 25116
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21