Appeal 3306351
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of single storey front and side extensions, front dormer extension, revised fenestration and associated works.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The banner above contains the description of development used in the Council’s decision notice because it is more accurate.
The Council adopted the Brighton & Hove City Plan Part Two (CPP2) on 22 October 2022. It replaced Policy QD14 of the Brighton & Hove Local Plan 2005 listed in the Council’s reason for refusal. The main parties were invited to comment on the relevant CPP2 Policy DM21. No comments were received. I have given full weight to this policy.
Section 04
Main Issue
The effect of the proposed front dormer extension on the character and appearance of No. [site address] and the surrounding area.
Section 05
Reasons
No. [site address] is a modest sized detached bungalow with a simple design including a pitched roof slope facing the road, set behind an open plan front garden. It is similar in these respects to most other bungalows in this road and in the surrounding area and this is locally distinctive.
The front dormer extension (dormer) would stretch across nearly the entire front roof slope, from eaves to just below ridge with a deep flat roof and wide side cheeks. It would obliterate any semblance of the existing roof profile. This substantial increase in built form projecting beyond the roof plane, towards the road, would give the bungalow a disproportionate, top heavy appearance. This fundamental change to the intrinsic form of No.7 would render it manifestly out of keeping with itself and the prevailing appearance of bungalows in this road and in surrounding area.
The dormer would be unduly prominent and conspicuous in public views in both directions in [address] and have an incongruous, jarring presence in this streetscene. This would undermine the otherwise broadly cohesive appearance of bungalows in this road and in the surrounding area.
Some external materials would match the bungalow but this would not overcome the unsympathetic change to its design or the disruption to the continuity and rhythm in the appearance of bungalows in this road. Most dormers of this type and size in [address] and in the surrounding area are in the rear roof slope so do not have the same public visual impact. Front dormers are generally significantly smaller and single storey front extensions are narrow with hipped or gabled roofs so do not overlap so much into the main roof slope or unduly alter overall scale and massing.
While the front dormer at No.[address] is similar to that which is proposed in this case, it is a solitary exception and plainly at odds with the prevailing character of bungalows in this road. The limited number of other such dormers elsewhere in the surrounding area cannot be observed in the context of No.7. None of these set a welcome precedent.
Accordingly, there would be significant harm to the character and appearance of No. [site address] and to the surrounding area. Consequently, the dormer would conflict with Policy CP12 of the Brighton & Hove City Plan Part One and with CPP2 Policy DM21. These policies require extensions and alterations to be well designed and scaled in relation to the property to be extended, adjoining properties and the existing character of the area.
Section 06
Other Matters
Enlargement of the bungalow to provide additional living accommodation would be aligned with objectives of the National Planning Policy Framework to meet housing needs. However, the Framework also refers to well-designed and distinctive places to live as a key objective of sustainable development.
Section 07
Planning Balance and Conclusion
The proposed development would not accord with the development plan. There are no other material considerations, including the provisions of the Framework, which outweigh this finding. Therefore, for the reasons given above the appeal does not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 122No official casework-database value to compare
- Extracted decision date · page 1
- 18 November 2022Matches the official casework database
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3306351
- Application reference
- BH2022/02097
- Lead case reference
- Not recorded
- Planning authority
- Brighton and Hove City Council
- Planning authority code
- E06000043
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 49 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 September 2022
- Valid date
- 5 September 2022
- Start date
- 29 September 2022
- Planning authority decision date
- 23 August 2022
- Appeal decision date
- 18 November 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 23789
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21