Appeal 3306902

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as, ‘Demolish first floor lean-to extension, veranda, porch and chimney stacks. Erect glazed garden room, replacement porch and veranda. Remodel existing dormer roofs and create viewing gallery, increase height of one chimney stack, with associated internal alterations. Install 3no. air source heat pumps on Annexe building’.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted to demolish first floor lean-to extension, veranda, porch and chimney stacks. Erect glazed garden room, replacement porch and veranda. Remodel existing dormer roofs and create viewing gallery, increase height of one chimney stack, with associated internal alterations. Install 3no. air source heat pumps on Annexe building at [site address] , [address], Colehill, Dorset [postcode] in accordance with the terms of the application, [name]/HOU/2022/02486, dated 13 April 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 1:1250 Location Plan; 1:500 Block Plan; Site Plan Drawing No. 1233/13; Ground Floor Plan Drawing No. 1233/06 revision A; First Floor Plan Drawing No. 1233/07 revision A; Second Floor Plan Drawing No. 1233/08 revision A; North and [name]. 1233/10; South and [name]. 1233/09 revision A and Roof Plan Drawing No. 1233/11.

    The Biodiversity Plan dated 23 June 2022 shall be adhered to throughout the construction period of the development and carried out in full prior to the substantial completion, or the first bringing into use of the development hereby approved, whichever is the sooner. The mitigation, compensation and net gain measures shall thereafter be permanently maintained and retained.

  2. Section 03

    Application for costs

    An application for costs was made by [name] against Dorset Council. This application is the subject of a separate Decision.

  3. Section 04

    Preliminary Matters

    The appeal site address given on the application form is ‘Moorings’ but the Council’s Decision Notice and appeal form refer to ‘[address]’. I understand from the Council’s Householder Application Report that the name of the property was changed from Moorings to [address] on 16 February 2022 and therefore I have referred to the current address in the banner heading above.

    The application form indicates that works had not started when the application was made. I saw that building works were taking place at the time of my site visit. My attention has been drawn to a second planning application1 at the appeal site. The appellant has advised that this approved all the work included within the appeal scheme with the exception of the viewing gallery and the plans submitted in support of the appellant’s case would appear to indicate this.

  4. Section 05

    Main Issue

    The main issue in this appeal is whether the appeal proposal would be inappropriate development in the Green Belt, having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies.

  5. Section 06

    Reasons

    In so far as is relevant to this appeal, Saved Policy GB3 of the East Dorset Local Plan adopted 11 January 2002 (LP) permits extensions to dwellings in the Green Belt which would; a) not materially change the impact of the dwelling on the openness of the Green Belt especially through its height or bulk; and b) the size and scale of a proposed extension would not dominate the existing dwelling.

    The appeal proposal includes the provision of a viewing gallery above the existing roof line of the dwelling to create a fourth floor. This would increase the overall height of the dwelling and add to its overall bulk. Whilst it would be largely screened or seen against a backdrop of trees, it would inevitably have an effect on the openness of the Green Belt and in this respect, the proposal would be at odds with criteria a) of Saved Policy GB3 of the LP.

    Turning to criteria b) of Saved Policy GB3 of the LP, there is nothing set out in the planning history or other documents provided to suggest that the appeal dwelling has been previously extended. In the absence of evidence to the contrary, I have followed the Council’s approach and consider that any assessment in terms of the size increase should relate to the building as indicated on the submitted ‘existing’ drawings.

    The Council calculate that the proposed additions would equate to a 3.7% increase in the volume of the existing dwelling. This would be substantially below the general guideline of a 50% or [address] metre increase in gross floorspace which the Council say in the supporting text to Saved Policy GB3 of the LP, will be used to judge whether the proposal is disproportionate. I therefore find that the size and scale of the proposed extensions would not 1 [name]: P/HOU/2022/02467 Demolish first floor lean-to extension, veranda, porch and chimney stacks. Erect glazed garden room, replacement porch and veranda. Remodel existing dormer roofs with associated internal alterations. Install 3 no. air source heat pumps. result in disproportionate additions over and above the size of the original building. In this respect, there would be no conflict with criteria b) of Saved Policy GB3 of the LP.

    I also find that there would be no conflict with the Framework. Paragraph 149c of the Framework sets out that development in the Green Belt is not considered to be inappropriate if the extension or alteration of a building does not result in disproportionate additions over and above the size of the original building and I have concluded that they would not.

    There is no requirement in national policy to undertake a separate assessment on the impact on openness where the proposal meets the requirement of Paragraph 149c of the Framework. In this respect, criteria a) of Saved Policy GB3 of the LP is inconsistent with the Framework and this limits the weight I attach to it. The Framework is an important material consideration that in this instance indicates that the appeal should be determined otherwise that in accordance with the development plan.

  6. Section 07

    Conditions

    I have considered the conditions suggested by the Council and the advice in the Planning Practice Guidance. A standard time limit condition is required as I cannot be satisfied that the works carried out to date constitute a commencement of development. A condition is needed to secure compliance with the submitted plans for the avoidance of doubt and in the interests of proper planning. In the interests of safeguarding biodiversity, it is necessary to attach a condition to ensure compliance with the submitted mitigation, compensation and net gain strategy.

  7. Section 08

    Conclusion

    The proposed development would not adhere to the development plan but material considerations, namely the Framework, indicate that the appeal should be determined otherwise than in accordance with the development plan. Accordingly, the appeal should succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 564No official casework-database value to compare
    Extracted decision date · page 1
    11 August 2023Matches the official casework database
    Extracted site visit dates
    24 July 2023 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 564No official casework-database value to compare
    Extracted decision date · page 1
    11 August 2023Matches the official casework database
    Extracted site visit dates
    24 July 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3306902
Application reference
P/HOU/2022/02486
Lead case reference
Not recorded
Planning authority
Dorset
Planning authority code
E06000059

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 September 2022
Valid date
21 September 2022
Start date
11 May 2023
Planning authority decision date
28 July 2022
Appeal decision date
11 August 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
36992
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21