Appeal 3307437
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a first floor extension to side to create bedroom and ensuite.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and relevant development plan policies, including its effect on openness; • the effect of the proposal on the character and appearance of the building and surrounding area; and • if the proposal is inappropriate development, whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify the development.
Section 04
Whether inappropriate development in the Green Belt
The Framework establishes that the construction of new buildings in the Green Belt should be regarded as inappropriate, subject to a number of exceptions as set out in Paragraph 149. [name] 149 c), the extension or alteration of a building is allowed provided that it does not result in disproportionate additions over and above the size of the original building. Policy BDP4 of the Bromsgrove District Plan 2017 (BDP) reflects the Framework in this regard.
Whilst the Framework does not provide a definition of ‘disproportionate additions’, BDP Policy BDP4 interprets this as increasing the size of the original dwelling beyond 40% or exceeding a maximum total floor space of 140m2; the scale of development must also have no adverse impact on the openness of the Green Belt. Any extensions above this threshold would be viewed as inappropriate development and would only be permitted where very special circumstances exist.
Both parties are largely in agreement that the original dwelling floor space is in the region of 50m2 and post-1948 extensions amount to approximately 75m2. The proposed extension would add just over 30m2 of floorspace. Considering the existing extensions and the appeal proposal, the Council calculate an overall rise of 211% over and above the original dwelling. A figure not disputed by the appellant. Whilst it is acknowledged that the appellant has substantially reduced the size of the proposal, the totality of the extensions vastly exceeds the 40% threshold, as well as exceeding the maximum total floor space.
The Framework advises that openness is an essential characteristic of Green Belt policy and has a spatial as well as a visual dimension. The appeal property is clearly visible from the adjacent highway and the openness of the Green Belt is evident around the property and the wider area.
The extension would add an additional storey to the rear projection, with an increased prominence contrasting with the existing extensions. The visual impact would be heightened by the ridge height above that of the building to which it joins, and it would be clearly visible from the road. It would also spatially increase the form and massing of the existing building and in doing so would result in a harmful loss of openness. Consequently, the scale of the proposed extension would have a significant impact on the openness of the Green Belt.
The appeal proposal would be a disproportionate addition and therefore inappropriate development in the Green Belt; it would also harm the openness of the Green Belt. It would conflict with BDP Policy BDP4 and the Framework. Inappropriate development is, by definition, harmful to the Green Belt and the Framework directs that substantial weight should be given to this harm.
Section 05
Character and appearance
The appeal property is a modestly sized, two storey dwelling of traditional form and character facing the roadside with a long, linear, L-shaped, single storey extension to its southern gable. It is part of a lose cluster of dwellings along the roadside which are of mixed character set in an area of open countryside outside of any defined settlement boundaries and with a strong rural feel.
Despite the significant footprint of the extensions relative to the original dwelling, their modest form, height and detailing have ensured that they are complimentary, subordinate additions, retaining its traditional character. The building also contributes positively to the character of the surrounding area owing to its position on the roadside and its open, rural context.
Although the ridge height of the proposed extension would be marginally below the original dwelling, the first floor extension at the far end of the single storey additions would disrupt the scale, form and subordinate nature of the additions. It would represent a dominant and bulky form, visually competing with the original dwelling. Furthermore, the elevated ridge height, uncharacteristic, hipped roof and dormer window, together with an unbalanced arrangement of the fenestration to the south elevation would exacerbate the visual harm to the original dwelling. This overly-dominant proposal would be clearly visible from the roadside and represent an incongruous addition and I have not been directed to any similar extensions in the area.
The appeal proposal would have a harmful effect on the character and appearance of the building and surrounding area and would conflict with BPD Policy BDP19 and the Council’s High Quality Design SPD. These seek to ensure that development achieves a high standard of design and is an appropriate form and scale to compliment the building and surrounding area. It would also not meet the high-quality design expectations of Section 12 of the Framework.
Section 06
Other considerations and very special circumstances
Very special circumstances would need to exist to justify granting permission for the development because it would constitute inappropriate development in the Green Belt and harm the openness. Paragraph 148 of the Framework advises that substantial weight should be given to any harm to the Green Belt and very special circumstances will not exist unless that harm, and any other harm, is clearly outweighed by other considerations.
The appellant suggests that the existing dwelling is small by modern standards and the room depth is constrained by the property boundary. This has resulted in an elongated footprint with an awkward layout of rooms. The proposal would provide a first floor bedroom and ensuite to bring the property up to a reasonable standard, with a more efficient layout and represent a lifetime home. However, whilst these factors are advocated as very special circumstances and I recognise that the proposal would enhance the living conditions of the occupants, these are private benefits and attract little weight.
The proposal would not detrimentally impact on the living conditions of neighbouring occupants and there are no objections from neighbours or the Parish Council. However, these are neutral matters neither weighing in favour or against the proposal.
Taken as a whole, I find that the other considerations in this case do not clearly outweigh the significant harm that I have identified. In concluding, therefore, the harm by reason of inappropriateness, and any other harm, would not be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal. As such the proposal would be in conflict with BDP Policy BDP4 and the Framework.
Section 07
Conclusion
For the reasons set out above, having regard to the development plan as a whole and all other material considerations, including the Framework, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2083No official casework-database value to compare
- Extracted decision date · page 1
- 20 April 2023Matches the official casework database
- Extracted site visit dates
- 18 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3307437
- Application reference
- 22/00438/FUL
- Lead case reference
- Not recorded
- Planning authority
- Bromsgrove District Council
- Planning authority code
- E07000234
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 37 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 22 September 2022
- Valid date
- 3 October 2022
- Start date
- 6 March 2023
- Planning authority decision date
- 29 July 2022
- Appeal decision date
- 20 April 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 31514
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21