Appeal 3307506
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of a new double garage with studio on the first floor.
Section 02
Decision
The appeal is allowed and planning permission is granted for the erection of a new double garage with studio on the first floor at Danesbury, [address], Aspenden, Buntingford, [postcode] in accordance with the terms of the application, Ref 3/22/1108/HH, dated 25 May 2022, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: NH/973/01, NH/973/02, NH/973/03, NH/973/04, NH/973/05 and NH/973/06.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing outbuilding.
Section 04
Main Issue
There is one main issue which is the effect of the proposed building on the character and appearance of the host dwelling, the appeal site and the surrounding area, including the Aspenden Conservation Area.
Section 05
Reasons
The appeal site lies in the rural village of Aspenden and within the Aspenden Conservation Area (CA), a designated heritage asset. Great weight attaches to the conservation of designated heritage assets. Paragraph 200 of the National Planning Policy Framework (NPPF), 2021, requires clear and convincing justification for any harm to, or loss of, the significance of a designated heritage asset including from development within its setting.
[address] is a narrow lane, characterised by trees and shrubs. These occur both within and between plots and adjacent to the highway and a stream which, in the vicinity of the appeal site, runs between the highway and dwellings on the south side of the road, including the appeal dwelling. The pattern of development on the southern side at this point is of large dwellings set in substantial plots with no regular building line. On the northern side of the road there are smaller dwellings, generally sited closer together in groups and set back from the highway. These are interspersed by larger detached dwellings on large plots. Dwellings vary considerably in age and design with the character of [address] derived mostly from the rural character and spacious, wooded setting. Dwellings, especially on the southern side, are well screened by trees and shrubs and by their set back from the lane.
Danesbury is accessed via a private drive and bridge over the stream. It is visible most clearly through the gap in the trees at the point of access. From here the large, modern, dwelling is clearly seen but set back from the frontage. Also visible to the side and set behind the building line of the dwelling is a small, detached outbuilding, clad in dark weatherboarding. This is understood to be used as a gym and store.
The proposed building would abut this outbuilding, extending some 6.3m in front of it and having a width of some 6.5m which would bring it closer to the host dwelling although a noticeable gap would remain. It would also extend about 1.2m in front of the projecting front gable elevation of the dwelling. It would have a simple pitched roof sloping to low eaves on the front elevation and a ridge height some 2.5m lower than the ridge of the dwelling and slightly above eaves height. It would be clad in weatherboarding to match the existing.
Although considerably larger than the existing outbuilding the scale of the proposed garage building would be subservient to the large dwelling and although projecting in front of it would not dominate or detract from its importance as the host building. The simple, plain pitched roof, low eaves and dark weatherboarding would contribute to its subservient and ancillary appearance. Although clearly visible through the site access, sufficient distance and screening would separate the garage from the site frontage and the lane, such that it would have a limited effect on the street scene which would ensure the rural, wooded character was preserved.
To the rear, the garage would have a small dormer and rooflight at first floor to provide illumination to the first floor studio. These would be acceptable given the similar dormers on the rear elevation of the host dwelling. The Council notes that the proposed garage/studio would be joined to the existing outbuilding resulting in a structure some 12.5m deep. However, whilst this would, in total, be deeper than the dwelling, the small scale of the existing outbuilding, which would be entirely hidden behind the new garage, and its separation from the host dwelling would ensure it remained subservient.
The Council also notes that there are other outbuildings in the vicinity but that they are not of a comparable scale or siting to the proposed building. In general I agree. However, the appellant refers to a large three bay outbuilding with 2 accommodation at first floor, similar to the appeal building, that was permitted recently at the adjacent property, Gorhamsbury under ref. 3/21/1659/HH. Although this building is well separated from the host dwelling it is sited in front and to the side of it, close to the front boundary. At the time of my site visit this building was nearing completion and was clearly visible from [address] through the boundary vegetation. In my view it is comparable with the appeal building and demonstrates, that where carefully sited and designed, larger outbuildings can assimilate successfully into the area. 10.Overall, I find that the proposed outbuilding, whilst large, would be in keeping with and subservient to the substantial host dwelling and, although visible from [address], its setback, design, scale and materials would ensure it was not unduly prominent and did not harm the essential character of the street scene or the surrounding area and preserved the character and appearance of the [name]. 11.It is concluded on the main issue that the proposed building would have no materially detrimental effect on the character or appearance of the host dwelling, the appeal site or the surrounding area and the character and appearance of the [name] would be preserved. In consequence, it would comply with Policies GBR2, HOU11, DES4, HA1 and HA4 of the East Herts District Plan, 2018, the Buntingford Community Area Neighbourhood Plan 2014- 2031 and the NPPF. Taken together and amongst other things these expect outbuildings within a residential curtilage to make the best use of available land and be of a size, scale, form, siting, design and materials appropriate to the character, appearance and setting of the dwelling and area such that they preserve or enhance the special interest, character and appearance of conservation areas. 12.The Council also refers to Policy HOU13. However, this relates specifically to annexes to be used as self-contained accommodation. The size and limited facilities in the proposed studio and the evidence that it is to be used as a dance studio satisfies me that this policy is not relevant in this case. 13.Turning to conditions, I agree with the Council that in addition to the statutory commencement condition, conditions requiring the development to be carried out in accordance with the approved plans and in matching materials are necessary to provide certainty and to protect the character and appearance of the host dwelling and the surrounding area, including the CA. 14.For the reasons set out above and having regard to all other matters raised, it is concluded that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2972No official casework-database value to compare
- Extracted decision date · page 1
- 15 December 2022Matches the official casework database
- Extracted site visit dates
- 29 November 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3307506
- Application reference
- 3/22/1108/HH
- Lead case reference
- Not recorded
- Planning authority
- East Hertfordshire District Council
- Planning authority code
- E07000242
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 63 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Yes
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 22 September 2022
- Valid date
- 22 September 2022
- Start date
- 7 October 2022
- Planning authority decision date
- 22 August 2022
- Appeal decision date
- 15 December 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 25295
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21