Skip to main content
Official casework recordDismissedCurrent release

Appeal 3307721

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a front porch.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the development on the character and appearance of the host building and street scene.

  3. Section 04

    Reasons

    Hollin Park Crescent is part of a large, planned housing estate characterised by pairs of hipped roof, semi-detached houses and short terraces of a similar age, style, and materials. These are generally set back from the road behind short front gardens with low boundary hedges. The general consistency in appearance and layout gives Hollin Park Crescent and the surrounding streets a strong cohesive character.

    The appeal property is one half of a pair of semi-detached houses and is typical of the prevailing character. Both houses have unaltered frontages and retain their original form and symmetry. A distinctive design feature of this commonly occurring house type are the central full-height bays which are joined at ground floor level by a lean-to roof.

    Policy P10 of the Leeds City Council Core Strategy (amended 2019) (the CS), saved Policies BD6 and GP5 of the Leeds City Council Unitary Development Plan (Review 2006) (the UDP), and the Council’s ‘Householder Design Guide’ Supplementary Planning Document (2012) (the SPD) seek to ensure that development is of good design which, amongst other things, respects the scale, form, proportions, and character of the original building and wider locality. In relation to porches, the SPD advises that these should be small, sympathetically designed, and unobtrusive structures.

    Although the proposed porch would represent a relatively modest addition to the building, it would nonetheless be a highly prominent and disruptive element. Its significant projection and gable-fronted design would diminish the bays as a distinctive feature and upset the overall balance and symmetry of the front elevation, thereby harming the character and appearance of the host building and street scene.

    I have taken account of other existing porches in the area, but they are firmly in the minority and therefore have only a limited influence on the character and appearance of the area surrounding the appeal site. The front extension at [address] is, in my view, a similarly disruptive element on that building, but it is set much further back from the road and therefore has reduced prominence in the street scene. Consequently, I do not regard those existing developments to justify the appeal scheme or to be a reason to allow harmful development.

    I conclude that the proposed development would unacceptably harm the character and appearance of the pair of semi-detached houses and the street scene, and so, conflicts with Policy P10 of the CS; saved Policies BD6 and GP5 of the UDP; and the SPD. It is also contrary to the National Planning Policy Framework (the Framework) with regards to achieving well designed places.

  4. Section 05

    Other Matters

    The appellant indicates that the Council may possibly accept other forms of development that they consider would be less practical or desirable, but my assessment is limited to the scheme that is before me.

  5. Section 06

    Conclusion

    For the reasons given, the development fails to accord with the relevant policies of the development plan and the Framework. Accordingly, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 597No official casework-database value to compare
    Extracted decision date · page 1
    19 December 2022Matches the official casework database
    Extracted site visit dates
    6 December 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3307721
Application reference
22/04338/FUL
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
4 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
26 September 2022
Valid date
26 September 2022
Start date
29 September 2022
Planning authority decision date
10 August 2022
Appeal decision date
19 December 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
25480
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21