Skip to main content
Official casework recordAllowedCurrent release

Appeal 3307914

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

an extension to provide utility area and link to garage

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for an extension to provide utility area and link to garage at [site address] in accordance with the terms of the application, Ref 22/10809, dated 8 July 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 0310-02 Survey as Existing; 0310-02 Scheme as Proposed - Plan; and Tree Protection Plan (06.07.2022).

    The existing shed shown on the approved plans shall be removed prior to commencement of works on the utility area and link hereby permitted.

    The trees on the site which are shown to be retained on the approved plans shall be protected during all site clearance, demolition and building works in accordance with the measures set out in the submitted [name] and Tree Protection Plan dated 06/07/2022: [site address] Hampshire [postcode] .

    Notwithstanding the above [name] no development shall commence until details of the design of the foundation works for the utility area and link have been submitted to and approved in writing by the local planning authority and the works shall be implemented as approved.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposal the nearby Oak Tree.

  3. Section 04

    Reasons

    The appeal site includes a large detached dwelling on a sizeable plot within the defined built-up area of Lymington. It is located off a private driveway abutting [site address] , a short cul-de-sac with a small number of detached dwellings sited in large gardens. The proposal is described above, it is for a single storey building.

  4. Section 05

    Effect on oak tree

    The scheme would lie in close proximity to a mature Oak Tree in good structural and physiological health which is the subject of a Tree Preservation Order (TPO). The Council fears that encroachment into the root area would run contrary to the continued good health of this tree. For my part, in this instance, I would deem the encroachment to be relatively modest; I note the existing compaction and hard surfacing of most of the applicable area in contrast to other surrounds of the tree; I can see that practicable tree protection measures during construction could readily be put in place; and there are two other factors (shed removal and agreement on foundation type) which via planning condition would add to mitigation. I would conclude that in this situation the encroachment into the root protection area would be acceptable.

    I note that the Council’s Tree Officer’s stated ‘main concern’ is that there will be potential pressure from the Appellants for tree removal or excessive pruning due to proximity, fears of failure, encroachment or shading. However, consent for removal has previously been refused and the Council’s stance is quite clear to the Appellants who would be implementing the project with their eyes fully open. Furthermore, this would not be a fully habitable room, it would not be under the main canopy, the tree is to the north side so shading of sunlight would not be an issue, a roof lantern is planned as the main source of natural light, the sink window does not face the tree, and of course with the TPO in place applications would be necessary for felling or pruning to be determined on their merits. As an aside, I note that the Council Officer’s Report ‘description of development’ does appear to use incorrect orientation references. Given all the circumstances I therefore do not share this main concern relating to ‘future pressure’.

    Policies ENV3 and ENV4 of the Local Plan 2016-2036 [name]: Planning Strategy for the New Forest District outside of the National Park are relevant. Taken together, and amongst other matters, these policies seek to achieve good design which protects the quality of places and their landscape and ensures suitable integration between built and natural environments. I conclude that the proposal would not conflict with these development plan policies.

  5. Section 06

    Conditions

    The Council reasonably suggests the standard commencement condition along with a condition that works are to be carried out in accordance with listed, approved, plans as this provides certainty. A condition requiring the use of matching materials is also appropriate in the interests of visual amenity. Adherence to the submitted [name] is reasonably called for and I agree with the condition to this effect in the interests of visual amenity. A point latterly raised by the Appellants, which in my opinion rightly goes a little 2 further than the [name] and would partly address Council concerns, is a positive suggestion in the interests of amenity – that is to agree, as stage one, the precise nature of the foundations relating to this scheme. I note the stated intention on the plans to remove the nearby shed and I see this as a beneficial act in terms of the oak tree’s potential health, and thus visual amenity, and shall therefore include a planning condition on this matter,

  6. Section 07

    Overall conclusion

    For the reasons given above I conclude that the appeal proposal would not have unacceptable adverse effects on the nearby Oak Tree. Accordingly, the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 352No official casework-database value to compare
    Extracted decision date · page 1
    17 July 2023Matches the official casework database
    Extracted site visit dates
    28 June 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3307914
Application reference
22/10809
Lead case reference
Not recorded
Planning authority
New Forest District Council
Planning authority code
E07000091

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
17 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 September 2022
Valid date
29 September 2022
Start date
30 January 2023
Planning authority decision date
9 September 2022
Appeal decision date
17 July 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
35669
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21