Skip to main content
Official casework recordDismissedCurrent release

Appeal 3308027

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as a proposed new access and the erection of 4 stone piers and 2 timber gates.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The effect of the proposed development on the character and appearance of the host property and the streetscene.

  3. Section 04

    Reasons

    [address] is a long road with a varied character. The area around the appeal site is characterised to the west by a small number of properties taking access direct from the road. The boundaries of these properties lie directly adjacent to the road and include low walls, fences and gates. In contrast, to the eastern side of the road, a long stretch of mature unbroken hedgerow gives this part of [address] an undeveloped, verdant and rural character. Detached dwellings, including the appeal site, are set well back from the main road behind this hedgerow and are accessed by a single point to the north.

    The proposed width of the double gates, stone walls and four stone piers and the additional required visibility splay would result in the creation of a significant break in the established hedge line. Whilst the appeal proposal would reflect the style of the host property, the creation of a prominent frontage directly onto the road would draw the eye and would be at odds with the verdant rural character of this side of the road. Whilst a new replacement hedge would be provided behind the visibility splay, this would take time to establish itself and would contrast with the mature hedgerow. Furthermore, the solid high gates, walls and piers, even when set back from the road, would stand out as incongruous and visually prominent within the street scene.

    The resulting adverse effect would be readily visible in public views along [site address] and as a result the appeal proposal would unacceptably harm the character and appearance of the host property and the streetscene. As such, it would conflict with Policies HP3 and NE4 of the Harrogate District Local Plan (2020), which require new development to respect the character and appearance of the locality.

    The proposal would also be contrary to the National Planning Policy Framework (the Framework), which states in paragraph 130 that planning decisions should ensure that developments will add to the overall quality of the area and are sympathetic to local character.

    A comparable access serving The Grange to the south has been brought to my attention. This established access lies beyond the long uninterrupted stretch of hedgerow and the presence of this access does not lead me to consider the appeal proposal to be acceptable. I have considered the appeal scheme on its own merits and concluded that it would cause harm for the reasons set out above.

  4. Section 05

    Other Matters

    The appellant has highlighted that there is no public footway along the road and that the appeal proposal would offer a refuge off the highway for pedestrians to avoid oncoming traffic. Whilst this would be a benefit, it would not outweigh the harm I have identified.

  5. Section 06

    Conclusion

    Drawing everything together, the proposal would conflict with the development plan, when read as a whole. Material considerations, including the Framework do not indicate that a decision should be made other than in accordance with

  6. Section 07

    the development plan.

    Having considered all other matters raised, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2397No official casework-database value to compare
    Extracted decision date · page 1
    22 December 2022Matches the official casework database
    Extracted site visit dates
    9 December 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3308027
Application reference
22/01344/FUL
Lead case reference
Not recorded
Planning authority
Harrogate Borough Council *
Planning authority code
E07000165

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
6 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
30 September 2022
Valid date
3 October 2022
Start date
6 October 2022
Planning authority decision date
18 July 2022
Appeal decision date
22 December 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
25712
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21