Appeal 3308790
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a site entrance gate and a fence panel.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The development has already been carried out as shown on the submitted plans and I have considered the proposal on this basis.
The name of the appellant differs on the application form and the appeal form. I have subsequently received confirmation that the appellant is [appellant], as specified on the application form.
Section 04
Main Issue
The main issue is the effect of the development on highway safety with regard to sight lines and the free flow of traffic.
Section 05
Reasons
The site comprises a pair of modern semi-detached dwellings located on the corner of [address] and the A25 [address], with a vehicular access near the junction. Although only a snapshot in time, at my site visit I observed that [address] is a semi-rural lane and the A25 is a busy classified road. No compelling evidence to the contrary has been provided. There is a mirror to assist drivers with navigation on the opposite side of the road, at the A25/[address] junction.
Vehicular access gates and two fence panels have been installed on the corner of the site close to the A25/[address] junction, joined to a pre-existing boundary fence and brick gate pier. Whilst the appellant states that the gates are kept open during the day and only closed at night and occasionally at weekends to protect materials stored in the garage and children playing, this will not necessarily always be the case and there is no mechanism before me to control their operation. Closed gates and the small clearance between the gates and the edge of the carriageway results in cars accessing the site waiting on the road at [address], creating an obstruction for vehicles accessing this road from the A25 and interfering with visibility for drivers egressing from [address] onto the A25.
The Highways Authority has referred to visibility splays which should be maintained at the road junction, and it appears that the development projects forward of the visibility splays shown in the appellant’s conveyance plan. Where it runs alongside the appeal site, the A25 is an unlit relatively straight road with a 40mph speed limit and at my site visit, which I appreciate is only a snapshot in time, I observed a steady flow of traffic. The position and height of the fence panels obstruct visibility for drivers exiting [address] onto the A25 causing danger to occupiers of those vehicles and to traffic travelling along the A25. Although there is a mirror on the opposite side of the junction which aids visibility to drivers joining the A25 from [address], this does not form part of the appeal site or scheme and therefore is not capable of being controlled in the future.
The appellant refers to similar gates in this location in the past, prior to the construction of the two dwellings. As the nature and extent of the previous use is not clear, it is not possible to make a comparison. Furthermore, I do not have full details of the access arrangements required in association with the residential development of the site.
Overall, I conclude that the development harms road safety and the free flow of traffic. This is contrary to Policy SQ8 of the Council’s MDEDPD 20101 where it requires development proposals to not significantly harm highway safety. It also conflicts with paragraphs 110 and 111 of the National Planning Policy Framework (the Framework) which require developments to provide safe and suitable access to the site and to not have an unacceptable impact on highway safety. The proposal conflicts with the Kent County Council Vehicle Crossing Guidance and Self Assessment 2013 where it requires adequate visibility to be provided and gates to be set back from the edge of the carriageway on busy roads and with the [name] 2000 where it requires clear unobstructed vehicle visibility.
Section 06
Conclusion
For the reasons given above, the proposal would conflict with the development plan as a whole and there are no material considerations, including the Framework, that would outweigh that conflict. Therefore, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4490No official casework-database value to compare
- Extracted decision date · page 1
- 19 May 2023Matches the official casework database
- Extracted site visit dates
- 3 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3308790
- Application reference
- TM/21/01565/FL
- Lead case reference
- Not recorded
- Planning authority
- Tonbridge and Malling Borough Council
- Planning authority code
- E07000115
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 1 hectares
- Floor space
- 1 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 October 2022
- Valid date
- 28 December 2022
- Start date
- 8 February 2023
- Planning authority decision date
- 26 August 2022
- Appeal decision date
- 19 May 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 32908
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21