Skip to main content
Official casework recordAllowedCurrent release

Appeal 3308873

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

[name] with [name] and Bi-folding doors, Velux windows to [name].

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for [name] with [name] and Bi-folding doors, Velux windows to [name] at [site address] , [site address] , LEEDS, [postcode] in accordance with the terms of the application, Ref 22/00937/FU, dated 7 February 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: location plan L1; block plan 01; existing ground floor and first floor plans 02 Rev 01; existing elevations 03; proposed ground floor plan 04; proposed first floor plan 05 and proposed elevations 06.

    The materials to be used in the construction of the external surfaces of the walls of the development hereby permitted shall match those used in the existing building.

    No works shall commence (including any demolition, site clearance, groundworks or drainage etc.) until all existing trees, hedges and vegetation shown to be retained on the approved plans are fully safeguarded by protective fencing and ground protection in accordance with approved plans and specifications and the provisions of [name] 5837 (2012) ‘Trees in relation to design, demolition and construction’. No equipment, machinery or materials shall be used, stored or burnt within any protected area. Ground levels within these areas shall not be altered, nor any excavations undertaken including the provision of any underground services/drainage. No works or development shall commence until a written ‘final issue’ [name] (AMS), as indicated in sections 5 to 10 of the appellant’s ‘Tree Survey and Arboricultural Impact Assessment’ (Rovar Group 22_5837_06_31), and in accordance with BS5837 for a tree care plan has been submitted to and approved in writing by the local planning authority. Works shall then be carried out in accordance with the approved method statement. The AMS shall include a Site Supervision Schedule i.e. a list of site visits and the operational specifics related to trees for the full construction duration. The AMS shall include for reporting back to the LPA immediately after each site supervision intervention (written & photographic). Evidence shall be submitted, such as a written appointment (including site specifics), that confirms that a qualified Arboriculturist / competent person has been appointed to carry out this Arboricultural monitoring/supervision. Seven days written notice shall be given to the Local Planning Authority that the protection measures are in place prior to demolition / approved works commencing, to allow inspection and approval of the protection measures as implemented on site.

  2. Section 03

    [name]

    It is clear from the Council’s reasons for refusal and officer report that the Council do not consider the proposed single storey rear extension and other alterations to be unacceptable in principle, or in terms of their detailed design and appearance, or to the living conditions of occupiers of neighbouring properties. Rather, it is the proposed extension’s location relative to the tree identified by the appellant’s tree survey1 (hereafter, the tree survey) as tree T1 and the effect upon that tree, and in turn the character and appearance of the Abeford Conservation Area, which informs the Councils decision to refuse planning permission.

    Thus, the main issues are whether or not the proposed development would: • Preserve or enhance the character or appearance of the Aberford Conservation Area, with particular regard to the effect of the proposed development upon tree T1; and • Achieve bio-diversity net gain.

  3. Section 04

    Character and appearance

    The appeal site lies within the Aberford Conservation Area. Whilst the appearance of the CA2 is noted as being reliant on a few ‘very significant characteristics such as its linear form along the [address], and its mix of high status of development arising from periods of prosperity and its relationship with nearby large country estates and farm and estate workers’ cottages, the village’s green spaces and mature trees contribute to the village’s special architectural and historic interest and its character and appearance.

    The tree closest to the proposed single storey rear extension is identified3 as tree T1, a mature tree of good physical condition with a retention category A. Although located to the rear of [site address] , T1 is of substantial height, the canopy of which is visible above the roofline of the appeal property and neighbouring houses. In this respect, tree T1 contributes positively to the character and appearance of the CA. 1 Tree Survey and Arboricultural Impact Assessment’ ([name]: 22_5837_06_31) 22/06/22 Roavr Group 2 Aberford Conservation Area Appraisal and Management Plan (May 2011) 3 ‘Tree Survey and Arboricultural Impact Assessment’ ([name]: 22_5837_06_31) 22/06/22 Roavr Group

    The area where it is proposed to construct the rear extension is partially laid to a brick patio, raised slightly above the adjoining hardstand and lawn. Tree T1 lies within the area lawn, encircled by a small border, but close to the raised patio. The tree survey identifies T1’s radial root protection area (RPA) as including the existing raised patio and the entire area within which it is proposed to construct the single storey rear extension.

    The appellant’s tree survey thus notes the proximity of tree T1 to the rear of the house and that the proposed extension would be constructed entirely within T1’s RPA. The tree survey identifies a ‘low impact foundation system’ as being a means to minimise excavation within the RPA, advocating a mini pile approach but, at the time at which the tree survey was carried out, no foundation design details had been made available. Whilst it is noted that trial pits, to establish the position of the piles, would be hand dug and that any roots over 25mm diameter would entail the repositioning of the piles, there is little in the way of tailored, site-specific detail regarding the proposed foundations to take specific account of ground conditions revealed by trial pits.

    Both parties refer to the provisions of BS 5837: 2012 ‘Trees in relation to design, demolition and construction – Recommendations’, in which it is stated that the default position for development within proximity of trees is that structures should be located outside any identified RPA, but also that technical solutions may be appropriate where there is clear and convincing justification for development in the proposed location. However, the Council’s case set out in the officer report largely concentrates on whether or not there is a clear and overriding justification for development in the proposed location, rather than whether or not the technical solution proposed by the appellant would be sufficient.

    The appellant’s description of the appeal property’s constraints in terms of potential locations for extensions is evident from visiting the site and viewing the property. In this respect, I agree that the linear form of the property externally and the linear layout of rooms within it, combine in the manner described by the appellant so as to limit the scope for extension. This is particularly so given the identified spread of tree T1’s RPA, together with those of trees T2-T4, which take up a significant proportion of the property’s available rear garden. I am not persuaded therefore that there are suitable alternative locations available to the appellant to extend that appeal property.

    The proposed extension would replace an existing area of hardstand, including a raised patio together with a further area of ground-level hardstand, both of which are also entirely within tree T1’s RPA. The appellant has put forward a technical solution to minimising the effects of the proposal, and its construction, on the health and vigour of the tree and its RPA, together with a clear and convincing justification for construction in the location proposed. Whilst that solution leaves some of the detail of trial pits and pile positions to further investigation, such an approach, secured by suitably worded planning condition, would not in my judgement be unreasonable, and there is little in the way of compelling evidence to lead me to an alternative conclusion.

    For these reasons therefore, I am satisfied that the appellant has adequately demonstrated that the proposed extension could be designed and constructed in such a way as to minimise its effect on the nearby tree T1. Subject to the mitigation measures set out in the appellant’s tree survey, and through suitably worded conditions, the proposal would have a neutral effect on the character and appearance of the CA.

    As such, there would be no conflict with [name] (CS) policies G2, G9, P10 or P12, or with Leeds Unitary Development Plan (Review) 2006 (UDP) policies GP5, LD1 or N19. Taken together, these policies set out the Council’s approach to achieving good design, amongst other things identifying the district’s historic and natural assets, skylines and views, protects and enhances the visual amenity of the area and the protection of existing vegetation. Aberford Neighbourhood Plan (NP) policy BH-1 identifies a range of criteria against which proposals within the CA will be considered, including the retention of mature trees and incorporation, where appropriate, of new tree planting. A neutral effect is to preserve the character or appearance of the CA, to which special attention shall be paid to preserving or enhancing, as per the statutory test established by section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990.

  4. Section 05

    Bio-diversity net gain

    [name] have concluded that the proposal would not result in significant harm to tree T1 and that it would not therefore necessitate its removal, I am satisfied that the proposed extension would not compromise the biodiversity aims and intentions set out within CS policy G9 or saved UDP policy GP5. As such, there would be no conflict with these policies.

  5. Section 06

    Conditions

    I have considered the Council’s suggested conditions against the provisions and guidance set out in the Framework and Planning Practice Guidance. I agree that time limit and plans conditions are reasonable and necessary in order to provide certainty and in the interests of good planning. In addition, I agreed that a materials condition should be applied, in the interests of character and appearance.

    Given the nature of the main issue in this instance, I agree that a condition regarding appropriate tree protection measures is necessary in the interests of character and appearance, and the health, vigour and integrity of the trees in question. With amendment to include specific reference to the appellant’s submissions and slight revision, I have imposed the suggested condition.

  6. Section 07

    Conclusion

    For the reasons set out, and having considered all other material considerations raised, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 310No official casework-database value to compare
    Extracted decision date · page 1
    12 July 2023Matches the official casework database
    Extracted site visit dates
    9 November 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3308873
Application reference
22/00937/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
25 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
12 October 2022
Valid date
12 October 2022
Start date
26 October 2022
Planning authority decision date
10 August 2022
Appeal decision date
12 July 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
35477
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21