Appeal 3309113
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
No verified development description has been extracted from an official decision PDF yet.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matters
Arrangements had been made for an Access Required Site Visit, but no-one was present at the site when I arrived at the pre-arranged time. Building works were in progress at the property, but the house was boarded up and a temporary security fence had been erected across the site’s frontage. I could not therefore enter the site to view the office from the appeal property’s rear garden. However, I was able to view the development from [address], a neighbouring property, to which I was allowed access.
Judging from what I could see, and the representations and photographs provided, the shell and roof of the garden office have been erected. The appellant wishes to retain that built and complete the building in accordance with the deposited plans. I shall proceed on this basis.
Section 04
Main issue
The main issue is the effect of the proposed development on the living conditions of the residents of [address] (No 4) with specific reference to outlook, visual impact and overshadowing.
Section 05
Reasons
The appeal property is a detached dwelling with a lengthy garden. As the appellant says, the proposal complies with development plan policies in some respects, and the Council acknowledges this.
The appellant claims that, other than for its height, the office would comprise permitted development. Because of my inability to access the site, I could not verify the precise dimensions of the building, but there is no dispute that the ‘as-built’ structure requires planning permission.
[name] 4’s rear amenity area the building’s roof could be seen clearly protruding above the boundary fence separating the two properties. To my mind, given the limited depth of No 4’s useable amenity area, the roof, being at such close quarters to No 4’s boundary, appeared dominating and intrusive, and harmfully affected outlook to the southern sky. From within No 4’s newly built rear extension, the office’s roof could be clearly seen in oblique views from the sliding glazed doors serving a habitable room. Taken in combination, the office, as erected, has made No [address] to live both within and outside the property, and harmed the living conditions of its residents by reason of its visually intrusive nature.
In view of its position to the south of No 4’s amenity area, the building would cast a limited shadow on the neighbouring property at certain times of the day. However, for most of the day during the summer when it is most likely to be used, No 4’s rear amenity area would remain largely unaffected by overshadowing from the structure. I do not therefore share the Council’s concern in this respect.
I therefore conclude that the garden office, if retained and completed, would comprise an un-neighbourly form of development harming the living conditions currently enjoyed by No 4’s residents by reason of its visually intrusive nature and its effect on outlook, in particular from No 4’s rear amenity area. Accordingly, a clear conflict arises with those provisions of policy L1 of the Dudley Borough Development Strategy directed to protecting the amenities of the occupiers of neighbouring dwellings.
Section 06
Other matters
I note the references to other development plan policies, but that to which I have referred is considered the most relevant in this case. I have also noted and taken into account the references to the National Planning Policy Framework and local design guidance.
I note that No 4’s residents did not register formal objections to the proposal when consulted. However, this is not decisive in my considerations. Having seen the development at first hand from both within and outside No 4, I consider the development to be objectionable for the reasons set out above.
No other matter raised is of such strength or significance as to outweigh those considerations that led me to my conclusions.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2949No official casework-database value to compare
- Extracted decision date · page 1
- 30 March 2023Matches the official casework database
- Extracted site visit dates
- 9 March 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3309113
- Application reference
- P22/1101
- Lead case reference
- Not recorded
- Planning authority
- Dudley Metropolitan Borough Council
- Planning authority code
- E08000027
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 24 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 16 October 2022
- Valid date
- 16 October 2022
- Start date
- 19 January 2023
- Planning authority decision date
- 16 September 2022
- Appeal decision date
- 30 March 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 30568
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21