Skip to main content
Official casework recordDismissedCurrent release

Appeal 3309333

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the enlargement of existing basement and creation of lightwell to front garden – reduction in size of lightwell from previous application ref 2022/0333.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the enlargement of existing basement and creation of lightwell to front garden at [site address] , Hackney, London [postcode] in accordance with the terms of the application Ref 2022/1309, dated 26 May 2022, subject to the conditions set out in the schedule to this decision.

  2. Section 03

    Procedural matter

    While the appellant has described the proposal as in the above heading, the Council has referred to it as the enlargement of the existing basement and creation of a lightwell to the front garden. As the Council’s description more succinctly reflects the development sought, I have proceeded on that basis.

  3. Section 04

    Main issue

    The main issue is the effect of the proposed development on the character and appearance of the host property and the local area.

  4. Section 05

    Reasons

    The appeal property is a mid-terrace dwelling of traditional style that stands behind a short front garden within a predominantly residential area, wherein buildings vary in type, design, and age. The proposal is to excavate under the main house to enlarge the basement of No 18. A front bay window would be introduced below street level that would face onto a new lightwell.

    The new lightwell would be modest in size and set back from the perimeter of the front garden and the adjacent footway. Given that the front garden has a hard surface and only part of it would be affected by the new lightwell, the appeal scheme would not result in the loss of a verdant front garden. To the contrary, soft landscaping would be introduced through planting in two new boxes placed alongside the existing boundary walls. As the new lightwell would be level with the ground surface and covered by a safety grill, it would not be a prominent feature in the street scene. That the new lightwell would also be partially screened by vegetation growing in the new planter boxes would further limit its visual impact in the local streetscape.

    The proposal would differentiate No 18 from other dwellings in the same terrace and properties elsewhere along [address] that from what I saw do not appear to have a front lightwell. It would also depart from the established pattern of existing development in the local area in which lightwells are typically a feature of Victorian houses with a raised ground floor above a habitable sub-basement with windows facing an open area often enclosed by railings at street level. The Council’s Supplementary Planning Document, [name] and Alterations, (SPD) notes that excavations to create front lightwells in connection with new basements, where lightwells are not an established characteristic of the streetscape, will not normally be approved. To my mind, the inclusion of the word ‘normally’ within this guidance implies that exceptions may be permissible depending on local circumstances.

    Nevertheless, the new lightwell would be largely screened from public view with very little, if any, of the enlarged front elevation readily evident from the road. Consequently, the new basement accommodation would be largely hidden from public view. As the proposal would be sympathetic in design and modest in scale, it would not draw the eye as a discordant feature nor affect how the scale of the host dwelling is perceived in the street nor upset the rhythm and unity of the wider terrace. From what I observed, other properties in the local area that have a front entrance and rooms at ground level, like No 18, include front lightwells that are visible from the road that do not detract from the character and qualities of the host building or the streetscape. Thus, I am not persuaded that the appeal scheme would be harmful to the character and appearance of the street scene or the local area if it were to proceed.

    On the main issue, I therefore conclude that the proposed development would not materially harm the character and appearance of the host building or the local area. As such, it does not conflict with Policies D3 or D4 of The London Plan, Policy LP1 of the Hackney Local Plan 2033 or the Council’s SPD. These policies and guidance broadly aim to ensure that all new development achieves high quality design; responds to local character and distinctiveness; is compatible with the existing townscape; and optimises the capacity of sites.

    The appellant is critical of the Council’s assessment of the proposal and places some reliance on various examples of properties with front lightwells in the local area. [name] have considered the information provided in relation to each of the cases cited by the appellant, I have assessed the proposal on its own planning merits and find it to be acceptable for the reasons given.

  5. Section 06

    Conditions

    In addition to the standard time limit condition, it is necessary to impose a condition that requires the development to be carried out in accordance with the approved plans for certainty. To ensure the satisfactory appearance of the development, a condition is imposed to require that the external materials match those of the existing building.

    A condition is also imposed to require an appropriate flood risk assessment to ensure that the completed development is properly drained. This requirement reflects the consultation response from the Council’s Drainage Engineer, which is referred to in the Officer’s report. This consultation reply appears to consider the flood risk resilience measures and waterproofing put forward in Section 5 of the appellant’s Flood Risk Assessment, dated May 2022. The suggested condition has been slightly reworded for clarity and precision.

  6. Section 07

    Conclusion

    For the reasons set out above, I conclude that the appeal should be allowed.

  7. Section 08

    Schedule of conditions

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Refs (P)1001, (P)0101 [name], (P)0102 [name], (P)0201 [name], (P)0202 [name], (P)0203 [name] and (P)0204.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    No development below ground level shall commence until a report (including intrusive investigation/trial pit and monitoring where necessary) demonstrating that the basement hereby permitted will not increase the potential for groundwater flooding to itself or the surrounding area has been submitted to, and approved in writing by, the Local Planning Authority. The report shall include details of appropriate controls including flood resilience and/or resistance measures against surface water (overland flow) and groundwater (if identified). The approved measures shall be incorporated and completed before the basement is first occupied. The basement shall be constructed and completed in accordance with the approved plans in line with BS 8102:2009 code of practice for “protection of below ground structures against water from the ground" and current best practice.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    9 March 2023Matches the official casework database
    Extracted site visit dates
    28 February 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3309333
Application reference
2022/1309
Lead case reference
Not recorded
Planning authority
London Borough of Hackney
Planning authority code
E09000012

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
21 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
19 October 2022
Valid date
3 November 2022
Start date
12 January 2023
Planning authority decision date
12 August 2022
Appeal decision date
9 March 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
29549
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21