Appeal 3309431
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a dropped kerb for vehicular access.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matter
The description of development in the banner heading above is taken from the Council’s decision notice as it better describes the proposed development.
Section 04
Main Issue
The main issue is the effect of the proposed development on the safety of highway users in [address].
Section 05
Reasons
The appeal site is a semi-detached residential property fronting [address] (classified as the A110) and situated within a predominantly residential area that is located between Enfield Town Centre to the west and the junction with the A10 to the east.
[address] in the locality of the appeal site is relatively wide and straight in its alignment, with a 30 mph speed limit. Rows of residential buildings front the road, many of which have off-street parking on their frontages and dropped kerb crossovers.
At the time of my visit during a weekday afternoon, the road was generally busy and there were frequent bus movements. I observed only the occasional short gap in traffic flow. [name] acknowledge that my visit was a snapshot in time, I have no substantive evidence to show that traffic conditions were abnormal.
The appeal proposal is to construct a dropped kerb crossover in the highway to allow vehicle parking on the hard standing forecourt at the front of the appeal property. The forecourt area is relatively generous in comparison to other residential properties in the locality.
The number of vehicles using the proposed dropped kerb crossover would be relatively small. However, the tall masonry piers to the front boundaries of both flanking properties, along with vehicles parked on the highway close to the proposed access, would noticeably restrict the visibility of drivers of vehicles exiting the site and of approaching road users within the highway to see each other. I saw on my visit that parking on the highway along this part of the road was unrestricted and at the time of my visit a large van and a number of cars were parked on the road close to the appeal property.
Drivers exiting the appeal site and emerging into the flow of traffic through the narrow gap between parked vehicles, would be obscured from view of road users in the carriageway by these parked vehicles, which may lead to oncoming road users in the carriageway braking suddenly. Vehicles turning into the site from the carriageway would need to slow down to turn into the site through the same narrow gap between parked vehicles, which may lead to road users in the carriageway braking suddenly. This would increase the risk of collisions and present a safety hazard for road users along this busy road.
Consequently, the relatively poor standard of visibility afforded to drivers exiting the site of other road users in the highway, and to approaching road users in the carriageway of vehicles exiting the appeal site, would present an unacceptable safety hazard for road users, which would disrupt the free flow of traffic.
This level of hazard to road users would be increased when buses are parked in the bus stop opposite the appeal site, narrowing the width of the carriageway for passing traffic. Although the width of the road allows for two way passing traffic between parked buses and vehicles, in this scenario drivers approaching the appeal site would likely be concentrating on maintaining space between oncoming passing traffic and parked vehicles, rather than anticipating vehicles emerging from the appeal site and through the relatively narrow gap between parked vehicles to join the carriageway.
There is an uncontrolled pedestrian crossing with a central refuge to the west of the appeal site and close to the junction with [address]. Therefore, I find it unlikely that bus passengers would choose to cross the busy [address] at a point directly into the path of vehicles entering or exiting the appeal property. As such, the evidence provided by the Council, including reference to the Enfield Council Revised Technical Standards for [name] (2013), does not persuade me that vehicles using the proposed access would conflict with bus passengers either waiting at the bus stop, or boarding or alighting from a bus.
The appellant has brought to my attention that a number of properties in the locality have off-street parking on their frontages and dropped kerb crossovers. [name] saw several of these on my visit, I have not been provided with any details of the circumstances relating to them, such as any planning permissions.
Furthermore, unlike the conditions at the appeal site, I saw that on-street parking in the areas located broadly around Nos 69 to 103, and Nos 127 to [address], was generally restricted by either double yellow lines close to junctions, a near continuous row of dropped kerb crossovers, or a bus stop. On-street parking close to the school is restricted by zig-zag markings painted on the carriageway close to the pedestrian crossing. Therefore, use of the examples brought to my attention are less likely to disrupt traffic flow and so are not comparable to the conditions at the appeal site, and they have little relevance to my considerations.
I appreciate that nearby roads experience high levels of on-street parking and the appellant’s household often rely on nearby streets for vehicle parking, causing inconvenience. I also note the appellant’s reference to future changes to parking and access restrictions in the locality. However, I have no details of the nature of those future changes, nor do I consider that displacing the appellant’s parked vehicles from the road to the property’s frontage would offset the appeal proposal’s harmful effect on highway safety.
I acknowledge the appellant’s contention that vehicles have, historically, been parked on the frontage of the appeal site and my attention is drawn to a photograph showing a vehicle parked on the site frontage. However, it is not for me, in dealing with this appeal, to determine whether the appellant has a lawful right to use the gated entrance for vehicle access to [address].
Taking these reasons together, I conclude that the proposed dropped kerb for vehicular access to the appeal property would harm unacceptably the safety of highway users in [address].
The proposal would therefore be contrary to Policy T4 of The London Plan (2021) and Policy DMD46 of the Enfield Development Management Document (2014), which set out that development proposals should not increase road danger, and that vehicle crossovers and dropped kerbs will only be permitted where there is no adverse impact on road safety.
Furthermore, the proposal would be contrary to paragraph 111 of the National Planning Policy Framework (2021), which states that development should only be prevented or refused if there would be an unacceptable impact on highway safety, or the residual cumulative impacts on the road network would be severe.
Although the Council quotes Core Policy 30 of The Enfield Core Strategy (2010) (CS), in its reason for refusal, this policy relates to the character and appearance of the built environment and the Council do not suggest there would be any harm in this regard. Similarly Core Policy CP24 of the CS refers to the wider road network and so is not directly relevant.
Section 06
Conclusion
For the reasons given above, and having regard to the development plan as a whole, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3654No official casework-database value to compare
- Extracted decision date · page 1
- 22 March 2023Matches the official casework database
- Extracted site visit dates
- 30 January 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3309431
- Application reference
- 22/02006/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 8 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 October 2022
- Valid date
- 20 October 2022
- Start date
- 20 December 2022
- Planning authority decision date
- 3 August 2022
- Appeal decision date
- 22 March 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 30050
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21