Appeal 3309659
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
loft conversion.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The description of development in my heading above is taken from the planning application form. In section E of the appeal form, it is stated that the description of development has not changed. However, a different wording has been entered. Neither of the main parties has provided confirmation that a revised description of development has been agreed. Accordingly, I have used the one given on the planning application form.
Section 04
Main Issue
The main issue is the effect of the proposal upon the character and appearance of the surrounding area.
Section 05
Reasons
The host property is a two-storey detached house in a residential area. It is an ‘L’ shaped dwelling with the side elevation situated at a lower height and set back from the principal elevation of the main part of the property. Due to the local topography of the area, the host property occupies an elevated position. While the wider residential area comprises a mix of property forms, with varying finishes to elevations, the immediate area is characterised by single storey bungalows. These factors combine to result in the host property appearing as a prominent property within its immediate context.
The proposed ridge height would be almost level with the main roof, falling well short of the Council’s minimum set-back requirement of 0.5m as set out in the Barnsley [address] Extensions and [name] 2019 (SPD). Therefore, the proposed development would not appear subordinate to the main house.
The proposal would result in an increased height to the side elevation and an altered roof profile. This would create further bulk and massing to the side elevation, which would further accentuate the prominent and dominant position of the host property within the street scene and in relation to the prevailing property form of bungalows.
The proposed rear flat roofed dormer would be of a horizontal emphasis, and it would project from the roofscape to a significant depth and height to a point where its outer face would align with that of the rear elevation. It would occupy almost the full width of the rear of the side elevation and give the appearance of a three-storey property.
The rear elevation of the host property faces a field, and as such the proposal would not be directly within public view. However, it would be within public view from along [address]. At my visit, I saw a substantial gap in the built frontage between the two-storey property at No.[address] and the single storey bungalow at No.51, which occupies the corner plot to [address]. While a hedge fronts this gap to the road, the gap at the middle to upper level is open. The proposed rear dormer’s scale, together with the increased bulk and mass of the side elevation would be clearly seen at this point, along with the altered roof pitch to the side elevation. The proposed roofscape would appear as overly dominant in relation to the prevailing lower roofscape along and at the corner of [address]. It would appear discordant in the context of the prevailing character of single storey dwellings.
The appellant drew my attention to photographs of two-storey detached properties within the wider area, without reference to any address or further details to enable me to compare them with the proposal before me. However, these appeared to demonstrate different contexts to that before me in terms of the development pattern, and more subordinate extensions or more modest rear dormers.
I therefore conclude that the proposal would harm the character and appearance of the surrounding area. It would conflict with Policy D1 of the Barnsley Local Plan 2019 which seeks to ensure, among other things, that development is of a high quality and respects local character and distinctiveness. It also conflicts with the SPD, which sets out design principles to maintain the character of an area and the street scene. The proposal would also conflict with paragraph 130 of the National Planning Policy Framework which seeks to ensure high quality development that is sympathetic to local character. Furthermore, paragraph 134 requires that development that is not well designed should be refused, especially where it fails to reflect local design policies and government guidance on design, taking into account any local design guidance and supplementary planning documents such as design guides and codes.
Section 06
Other Matters
The appellant refers to a previous scheme dismissed at appeal1. I accept that the proposal before me has been modified in response to the dismissal. I am further directed to a supporting comment from a neighbour and the absence of any objections. These matters do not form a reason to allow an unacceptable proposal. 1 Appeal Ref: APP/R4408/D/22/3292715
The appellant draws my attention to the direction of national planning policy in supporting the extension and alteration of existing dwellings to meet homeowner’s requirements. While changes to the scope of permitted development rights may support this claim, such rights are not unfettered, and the proposal before me is not advanced in such terms.
Section 07
Conclusion
For the reasons given, I conclude that the development conflicts with the development plan, read as a whole. No material considerations have been shown to carry sufficient weight to warrant a decision otherwise than in accordance with it. Therefore, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5599No official casework-database value to compare
- Extracted decision date · page 1
- 20 February 2023Matches the official casework database
- Extracted site visit dates
- 31 January 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3309659
- Application reference
- 2022/0782
- Lead case reference
- Not recorded
- Planning authority
- Barnsley Metropolitan Borough Council
- Planning authority code
- E08000016
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 25 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 25 October 2022
- Valid date
- 25 October 2022
- Start date
- 21 December 2022
- Planning authority decision date
- 6 October 2022
- Appeal decision date
- 20 February 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 28517
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21