Appeal 3309984
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a loft conversion with rear dormer.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I saw on my site visit that works were complete on the construction of a loft conversion with a rear dormer and the space was furnished as a bedroom with en-suite. The works seemed largely as shown on the application plans and completion is consistent with the information given in the planning application form. I have determined the appeal on its planning merits based on what I considered from my site visit to be a completed development. I have therefore referred to the proposal as ‘the development’, including in the banner heading above.
I have deleted the words ‘retrospective application’ from the description since this is not a form of development.
Section 04
Main Issue
The main issue is the effect of the development on the character and appearance of the area.
Section 05
Reasons
The appeal dwelling is a mid-terraced house in a cul-de-sac which forms part of a quiet, relatively modern housing estate served by a sinuous estate road, [address], in a suburban location on the edge of Enfield town. The area close to the appeal property comprises a pleasant mix of two-storey semi-detached and terraced houses, the terraces being formed as short blocks of three or four dwellings. Several three storey blocks of flats served by the estate road are also located close to the appeal site. Facing materials are generally consistent in the vicinity with the dominant design features comprising pitched roofs and gable walls to the dwellings.
Due to the winding nature of [address] the properties in the estate are often located at various angles to each other and there is no regular street pattern. This creates an arrangement of buildings and spaces leading to many rear elevations of the houses being readily visible from the highway. This is the case with the appeal property which is in clear view from the space between 126 and [address], and from the garage parking court adjacent to the appeal site. The development appears as a large, wide, visually dominant and incongruous feature which breaks the predominant and generally regular pitched-roof pattern of the estate.
The development does not reflect the roofscapes and general characteristics prevalent in the design of dwellings in the vicinity of the appeal site. The dormer is inset a short distance from the eaves and edges of the roof. However, it is not set down from the roof ridge and the short insets do not mitigate the effect of the scale, mass and overall bulk of the development on the character and appearance of the host property or the surrounding area. I therefore find that it is not a well-designed or sympathetic addition to the appeal property and fails to have regard to its context and surroundings.
The development is harmful to the character and appearance of the area. Accordingly, it conflicts with Policy D3 of The London Plan (March 2021), Core Policy 30 of the Enfield Plan Core Strategy 2010 – 2025 (November 2010), and Policies DMD13 and DMD37 of the Improving Enfield Development Management Document (November 2014) (the DMD) which, in summary, collectively require high quality design and seek to ensure development respects local character and has appropriate regard to its context and surroundings. The proposal would also fail to accord with the National Planning Policy Framework (the Framework) which requires the same outcomes.
Section 06
Other Matters
My attention has been drawn to the personal circumstances of the appellant’s family, particularly the need to create a sensory room for one of their children, a matter supported in evidence from an [name]. The development allows other space in the house to be used as a sensory room. In considering this appeal I have had due regard to the public sector equality duty (PSED) set out under s149 of the Equality Act 2010 which identifies relevant protected characteristics, including age and disability.
However, the protection of public interests through the implementation of planning policy is in accordance with the law and necessary in a democratic society. In this case, it has not been shown that the development would be the only option to achieve the appellant’s aims in respect of creating a sensory room. I have nothing before me to show or explain whether consideration has been given to other options to provide a sensory room without causing the harm I have identified to the character and appearance of the host building and area. Accordingly, I attach limited weight to this matter.
The PSED considerations do not outweigh the significant harm caused by the appeal scheme, and this would be permanent. After careful consideration of these particular matters, I am satisfied that the impact of dismissing this appeal is proportionate and justified.
Policy DMD8 of the DMD relates only to new residential development and is not a relevant development plan policy in the determination of this appeal.
Section 07
Conclusion
For the reasons given above, the proposal would conflict with the development plan, when read as a whole. I have had regard to the matters raised by the appeal, in particular the personal circumstances of the appellant’s family. However, material considerations, including the Framework do not indicate that a decision should be made other than in accordance with the development plan. Having considered all other matters raised, I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3172No official casework-database value to compare
- Extracted decision date · page 1
- 17 April 2023Matches the official casework database
- Extracted site visit dates
- 27 February 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3309984
- Application reference
- 22/02193/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 29 October 2022
- Valid date
- 29 October 2022
- Start date
- 20 December 2022
- Planning authority decision date
- 16 August 2022
- Appeal decision date
- 17 April 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 31195
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21