Appeal 3310320
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described on the appeal form and decision notice as “Loft conversion to living space, 1 new front and 2 new rear dormer windows and 1 front and 2 side skylights.”
Section 02
Decision
The appeal is allowed and planning permission is granted for a loft conversion to living space, 1 new front and 2 new rear dormer windows and 1 front and 2 side skylights at Longmead, [address], [site address] , Hawridge, Chesham, Buckinghamshire, [postcode] in accordance with the terms of the application, [name]/22/2010/FA, dated 6 June 2022, subject to the conditions set out in the attached schedule.
Section 03
Procedural matter
The revised National Planning Policy Framework (‘the Framework’) was published on 5 September 2023. Having reviewed this document, I am satisfied that the policy applicable to the scheme before me remains unchanged from the previous Framework1. As a consequence, I did not consider there to be a need to reconsult the parties and have determined the appeal in light of the new Framework document, which is a material consideration that should be taken into account.
Section 04
Background information
The Council has confirmed that Class A permitted development rights2 (the enlargement, improvement or other alteration of a dwellinghouse) were removed from the bungalow when planning permission was granted and that Class B permitted development rights do not apply as the dwellinghouse is sited on Article 2(3) land (in this case, an AONB). It has also clarified that the skylights would be permitted development under Class C. I see no reason to dispute these findings, the consequence of which means that the existing loft could be converted to habitable living accommodation with skylights (but not 1 National Planning Policy Framework, Ministry of Housing, Communities and Local Government, 20 July 2021. 2 The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). dormer windows) without the need for planning permission from the local planning authority.
Section 05
Main issues
The main issue is the effect of the proposed development on biodiversity and protected species, with particular regard to Bats and [name].
Section 06
Appeal site context
The appeal site contains a modern detached bungalow set on a spacious plot enclosed by timber fencing, mature trees and hedging. It falls within the Green Belt, Cholesbury & Hawridge Conservation Area and Chilterns Area of Outstanding Natural Beauty (AONB).
The southern side of [address] is characterised by dwellings of varying architectural styles, maturity, scale and height (single, 1.5 and 2-storey), set back from the road on spacious plots. [site address] lies on the northern side of the road and is characterised by informal open grassland areas with natural pathways set amongst mature woodland areas and hedgerows. Overall, I found the area to have a verdant, loose-knit and attractive countryside character. The effect of the proposed development on biodiversity and protected species, with particular regard to Bats and [name]
The Habitats Directive3 requires member states to establish a system of strict protection for [name] (of which Bats and [name] are categorised). The Conservation of Habitats and Species Regulations4 require at Regulation 9(3) that a competent authority must have regard to the requirements of the [name] in exercising their functions. Further protection is given to a range of animals under Schedule 5 of the Wildlife and Countryside Act 1981, which include Bats and [name].
Section 40 of the Natural Environment and Rural Communities Act 2006 states that any public authority, in exercising its functions, must have regard to the purpose of conserving biodiversity. Circular 06/20055 also states that the presence or otherwise of protected species, and the extent that they may be affected by a proposed development, must be established before planning permission is granted, otherwise all relevant material considerations may not have been addressed in making the decision.
The Council’s Newt Officer states that the appeal site falls within a green impact risk zone for [name], which indicates a moderate habitat and low likelihood of [name] presence. In particular, there are 2 ponds within 500m of the site and records of [name] within 300m of the site, with connectivity between these locations and the appeal site. As a consequence, a preliminary ecological appraisal was requested to establish the ecological value of the site and its potential to support protected or priority 3 Council Directive 92/43/EEC dated 21 May 1992 on the conservation of natural habitats and of wild fauna and flora, The Council of [name]. 4 The Conservation of Habitats and Species Regulations 2017. 5 Government Circular: Biodiversity and Geological Conservation – statutory obligations and their impact within the planning system, [name] 06/2005, 16 August 2005. species. The same request was made by the Council’s Ecology Officer who specified that this should also include a bat roost assessment of the building.
Set against the above context, the appellant states that the existing bungalow was designed to prevent Gliss Gliss6 invasion which meant that it was constructed in such a way to ensure no gaps, voids or apertures were present in the completed building, with the floor structure also sealed to prevent ingress. In addition, the loft floor and ceiling were completely boarded and the rafter spaces tightly packed to full thickness using insulation boards. As a consequence, the appellant states that the building became inaccessible to all bird, bat, insect and ground dwelling species.
There is no evidence from the Council explaining why these construction measures would not prevent the creation of habitats for protected species within the roof space. Neither is there any explanation from the Council as to how the very limited works to the building’s roof fabric could potentially impact on the wider ecological value of the site and surrounding area beyond that already incurred by the existing bungalow. Set against this context, I recognise that a preliminary ecological appraisal is necessary when there is a degree of uncertainty with regard to impact upon protected species & their habitats or where it has been established that there is the potential for harm, but where such professional judgements are made, they need to be clearly justified.
There is no evidence of gaps or crevices between the bungalow’s modern roof slates and I have noted that the eaves of the building was enclosed by soffits. It also does not possess an exposed open loft with clear gaps and entry points for ingress by protected species such as Bats. As a consequence I have given significant weight in my consideration to the bungalow’s construction specifications and the fact that its existing loft floor and ceiling have already been completely boarded (and could be converted to living accommodation with skylights without planning permission).
I have also given significant weight in my assessment to the absence of any evidence from the Council that explains; (1) which features on the building, despite its construction specifications and the boarded nature of its loft, are suitable for bats or other protected species and their habitats; (2) why it considers the construction of 3 modest dormer windows would have the potential to harm biodiversity and protected species & their habitats or commuting and foraging habits; and (3) how the use of the building and site would become even more intensive with 3 modest dormer windows (given the ability to use the already boarded up loft space for living accommodation with skylights without planning permission).
Based on the above evidence, I conclude that there is no reasonable likelihood of protected species & their habitats or commuting and foraging habits being affected by the development or that there would be any adverse effect on biodiversity. The proposal would therefore accord with Policy CS24 of the Core Strategy7, which seeks, amongst other things, to ensure that protected species & habitats, biodiversity and ecological interests are protected and conserved from development proposals. 6 European edible dormouse. 7 [name] for Chiltern District, adopted November 2011, Chiltern District Council.
I also find that the scheme does not conflict with the Conservation of Habitats and Species Regulations and Circular 06/2005, or Paragraph 180 of the Framework which states, amongst other things, that when determining planning applications local planning authorities should refuse planning permission if significant harm to biodiversity from a development cannot be avoided, adequately mitigated or as a last resort, compensated for.
Section 07
Conditions
A condition has been imposed to ensure the scheme is carried out in accordance with the approved plans. I have also attached a condition regarding the materials to ensure that the appearance of the development is satisfactory.
Section 08
Conclusion
In view of the above, having had regard to all other matters raised, I conclude that the appeal should be allowed.
Section 09
Schedule of conditions
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved details:- Drawing nos. 201707/Local Plan/02 (Location Plan); 201707/PL/502 (Block Plan Proposed); and 201707/PL/501A ([name]).
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building. End of Schedule
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 19654No official casework-database value to compare
- Extracted decision date · page 1
- 27 September 2023Matches the official casework database
- Extracted site visit dates
- 1 September 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3310320
- Application reference
- PL/22/2010/FA
- Lead case reference
- Not recorded
- Planning authority
- Buckinghamshire Council - Chiltern Area *
- Planning authority code
- E07000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 94 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 3 November 2022
- Valid date
- 3 November 2022
- Start date
- 9 March 2023
- Planning authority decision date
- 13 September 2022
- Appeal decision date
- 27 September 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 39342
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21