Appeal 3310336
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
boundary fence and integrated bin store with green roof.
Section 02
Decision
The appeal is allowed and planning permission is granted for boundary fence and integrated bin store with green roof at [site address] , [site address] , Hertfordshire [postcode] in accordance with the terms of the application, Ref 22/1297/HSE, dated 24 July 2022, and the plans submitted with it.
Section 03
Preliminary Matters
The application form describes the development as retrospective and refers to the retention of it. However, as these do not describe acts of development, I have removed them from the description set out above. I was able to view the completed development when I visited and have taken this into account in coming to my decision.
Section 04
Main Issue
The main issue is the effect of the development on the character and appearance of the surrounding area.
Section 05
Reasons
[site address] is a two-storey semi-detached dwelling within a residential area with hardstanding to the front for vehicular parking. [address] is a wide road with a grass verge and pavement. The road is subject to on-street parking which is a dominant feature of the streetscene. The property does not have a side access, so bin storage must be at the front of the property.
Dwellings in the locality are generally set back from the highway and include a variety of boundary treatments including low fences, walls and landscaping. At my visit I observed multiple refuse bins positioned to the front of dwellings in the locality, resulting in visual clutter. I also noted a bin store to the frontage of a dwelling nearby. My attention has been drawn to a number of properties in the locality with medium-high level frontage walls and hedges in excess of 1m in height, which I noted on my visit. As there is a variety of boundary treatments in the locality, I do not find the streetscene as open and verdant as the Council claims.
The proposed bin store and fence are positioned at the back edge of the pavement and are constructed of horizontal wood with gaps between the runs. The bin store is a wooden structure enclosed on 3 sides with a green, mono-pitched roof. The boundary fence is lower in height than the bin store. The design and the materials break up the visual impact of the store and fence and sufficiently relates to other timber boundary treatments in the locality. The fence height is not dissimilar to other boundary treatments in the locality and is of an appropriate design and height.
The bin store does not extend the full width of the dwelling’s front boundary and does not dominate the site frontage. When viewed from the pavement on [address], in either the northerly or southerly direction, the bin store blends in with the brick pillars of frontage walls and other boundary treatments along the road and does not appear as an incongruous, prominent feature in the streetscene.
When viewed from the pavement at the front of the property the bin store is visible. However, it is set behind a grass verge and the presence of on-street parking on the road obscures views of the bin store from wider publicly available views in the streetscene.
I conclude that the bin store and fence are not out of character with the streetscene and do not harm the appearance of the surrounding area. Accordingly, I find no conflict with the National Planning Policy Framework (the Framework) or Policy CS22 of the Hertsmere Local Plan Development Plan Document: [name] (adopted 2013). Neither is there conflict with the Hertsmere Local Development Framework Supplementary Planning Document – Planning and [name]: Guidelines for [name] and Alterations (adopted 2006) or the Hertsmere Local Development Framework Supplementary Planning Document – Planning and [name]: Guidelines for High Quality Sustainable Development (draft 2016). These policies and documents include guidance for the design and location of waste storage and seek good design sympathetic to the local area.
Section 06
Other Matters
There is sufficient intervening space between the bin store and the windows to the front elevation of the neighbouring property at [address] to avoid any significant harm through loss of outlook.
The roof of the bin store includes gravel and succulent planting, which the appellant states contributes positively to biodiversity. Given the scale of the development I give the ecological benefit limited weight in the determination of the appeal.
The road is straight with good visibility. Given the limited width of the bin store and its degree of separation from the access at no. 110 means that the bin store does not have a significant effect on the visibility of the driveway of this property. It is noted that the local planning authority has not included this as a reason for refusal and there is no objection from the Highway Authority. Accordingly, I am satisfied that neither the fence nor bin store has a harmful effect on visibility in terms of use of existing accesses.
Section 07
Conditions
As the development has been completed, it is not necessary to impose the standard time limit for commencement, neither is it necessary to require that it be carried out in accordance with any plans.
Section 08
Conclusion
For the reasons given above, having had regard to the development plan and Framework as a whole, and taking account of all other matters, the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4617No official casework-database value to compare
- Extracted decision date · page 1
- 11 May 2023Matches the official casework database
- Extracted site visit dates
- 4 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3310336
- Application reference
- 22/1297/HSE
- Lead case reference
- Not recorded
- Planning authority
- Hertsmere Borough Council
- Planning authority code
- E07000098
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 2 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 3 November 2022
- Valid date
- 3 November 2022
- Start date
- 19 January 2023
- Planning authority decision date
- 7 October 2022
- Appeal decision date
- 11 May 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 32441
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21