Skip to main content
Official casework recordAllowedCurrent release

Appeal 3310822

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for the widening of existing driveway access.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the widening of existing driveway access at [site address] , [name], Bath [postcode] , in accordance with the terms of the application Ref 22/02008/FUL, dated 13 May 2022 subject to the conditions set out below:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in complete accordance with the approved plans: D490-000 and D490-303.

  2. Section 03

    Main Issue

    The main issue is whether the proposed development would preserve or enhance the character or appearance of the Bath Conservation Area and World Heritage Site.

  3. Section 04

    Reasons

    The appeal site is located within the Bath Conservation Area and World Heritage Site, specifically where high stone boundary walls are a common feature along the roadside. The walls are of an historic form of construction and, whilst not listed in their own right, I consider can be deemed to be non-designated heritage assets. These walls include vehicular gateways of varying widths which serve their respective properties and in many cases are wider than that proposed, which is a material consideration in determining this appeal.

    I understand that the proposal to widen the access was originally part of an earlier planning application which was approved for the erection of a garage, pool house and pool, but being a bone of contention that element was withdrawn to enable planning permission to be given.

    The Council highlight that their maximum width of a parking bay is 2.7m and therefore deem that the proposal is unnecessary, however the local Highway Authority state that the greater access width has the potential to increase the level of visibility on accessing and egressing the property which is of public benefit.

    Clearly the proposal would give rise to a small loss of historic rubble-stone fabric; and there would be a loss of the stepped design on the eastern side of the access, nonetheless the original decorative wall ends would be reinstated. Therefore, I consider that the harm that would ensue to the non-designated heritage asset would be slight and would only have a minor effect upon its significance. Bearing in mind the improvements to highway visibility and resultant safety I consider that they outweigh the harm.

    Overall, I consider that the proposal would preserve the character and appearance of the Conservation Area and World Heritage Site as a whole, with no harm caused to the designated heritage asset. I therefore find that the proposal complies with Policies D2, D5 and HE1 of the Placemaking Plan for Bath and [name] (2017) and Policies B4 and CP6 of the [name] (2014), which together require development proposals not to harm local character and distinctiveness where they positively respond to site context, whilst an appropriate boundary treatment be maintained, including the need to safeguard heritage assets and the sensitive management of the historic environment in general.

  4. Section 05

    Conclusion and Conditions

    For the reasons set out above and having regard to all other matters raised, I conclude that the appeal should succeed.

    The Council has not recommended that any conditions be imposed within its appeal questionnaire, however at the very least I consider it appropriate to impose the statutory standard time limit condition and one requiring that the development be carried out in accordance with the approved plans, for the avoidance of doubt as to the scope of the planning permission.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 297No official casework-database value to compare
    Extracted decision date · page 1
    10 February 2023Matches the official casework database
    Extracted site visit dates
    16 January 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3310822
Application reference
22/02008/FUL
Lead case reference
Not recorded
Planning authority
Bath and North East Somerset Council
Planning authority code
E06000022

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
10 November 2022
Valid date
10 November 2022
Start date
15 December 2022
Planning authority decision date
16 September 2022
Appeal decision date
10 February 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
27982
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21