Appeal 3310908
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
‘Ground and first floor rear extension, first floor side extension and conversion of attic including 4 no. front/rear dormer windows’.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The description of development on the application form was amended following submission of the application. I have referred to the amended description for the purposes of this appeal.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the area.
Section 05
Reasons
The appeal site is a two-storey detached dwelling at the western end of The Spinney, a suburban residential street. The appeal scheme would raise the roof height and introduce single and two-storey side extensions.
The overall form of the two-storey side and single storey rear extensions are simple and functional. They would respect the form, proportions and design of the host dwelling. Moreover, the first-floor extension would be set down from the main ridgeline and set back from the plane of the front elevation, resulting in a subordinate and proportionate addition.
The plot coverage, design and extent of extension would not appear incongruous with the sprawling and extended dwellings which form the built context of The Spinney. The first-floor extension element would not adversely affect the sense of openness within the street as the flank of the site bounds the rear garden of the neighbouring property, which fronts [address]; creating an unusually large gap. In any case, the sense of openness within The Spinney also arises from the set-back of dwellings and the width of grass verges on either side of the road, which would not be affected by the proposal.
There are several successful examples of raised roofs in the vicinity. These do not appear uncharacteristically massive in the context due to the gradually changing topography, gaps between dwellings and somewhat inconsistent building line. The appeal scheme would thus integrate well within the street scene and would not appear unduly high, massive or out of scale in this respect. The whole roof would be raised and therefore the pitch of the roof would not appear out of keeping with the shallow roof pitches which are typical of The Spinney.
However, whilst there is variation in the design and overall height of the dwellings and their extensions in The Spinney, a sense of place and consistency arises from the contemporaneous nature of most of the dwellings, as well as use of common architectural features such as a large two storey front gable, gabled porch, large windows, and a long ridgeline with a relatively shallow roof pitch. The appeal site is not easily viewed within the wider street scene due to a curve in the road, however, its layout and the appearance are typical of the street and it contributes to this sense of place. The proposed two small gabled dormers to the front elevation would interrupt the simple roof form and would also appear out of scale with the large gabled elements and the overall simple, large fenestration details of the host dwelling and street. Although there are some front dormers in surrounding streets, they are not a feature of The Spinney.
Moreover, the addition of front dormers would appear incongruous with the strong predominance of two-storey dwellings in The Spinney. The dormers would create a vertical emphasis which would be out of character with the low profile, sprawling dwellings of The Spinney. It is possible to glimpse rear box dormers at several properties, however, these do not interfere with the common design of simple, undisturbed front roof slopes and do not draw intrusive attention to the second storey. Similarly, the front rooflights on a few dwellings do not interrupt the simple low profile of roofs. It must be acknowledged that one dwelling visible within the street scene has a half-pitched roof, with a roof slope to the front elevation and a full second storey to the rear, however, this does not integrate well with the prevailing character of the area.
For these reasons, the appeal scheme would conflict with saved policies EP3 and H11 of the South Bucks District Local Plan, adopted 1999, CP8 of the [name], adopted 2011, and the National Planning Policy Framework. These policies seek, amongst other things, high standards of design which make a positive contribution to the character of the surrounding area.
Section 06
[name]
The appeal site benefits from an extant planning permission for a similar form of roof, side, and rear extension, less the dormer windows and with a raised chimney to extend beyond the ridge of the extended roof (Council ref. PL/22/4042/FA). Given that the permission is extant and there is no reason to believe that the permitted scheme would not be implemented, I consider it constitutes a realistic ‘fallback’. However, given that the permitted scheme does not feature the elements of the appeal scheme which make it unacceptable, the ‘fallback’ scheme would not justify allowing this appeal.
The Appellant has indicated that they would accept a permission for the extensions less the dormer windows and has amended plans at Appendix 5 of their Grounds of Appeal. Unfortunately, I am not satisfied that the amended scheme has met the relevant requirements for amendments at appeal1. In any case, the extant permission provides for a similar scheme less the dormer windows.
Section 07
Conclusion
For the reasons given above, the appeal scheme would conflict with the relevant policies of the development plan and no material considerations indicate that the appeal should be determined other than in accordance with the development plan. The appeal is accordingly dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 254No official casework-database value to compare
- Extracted decision date · page 1
- 23 March 2023Matches the official casework database
- Extracted site visit dates
- 24 February 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3310908
- Application reference
- PL/22/2078/FA
- Lead case reference
- Not recorded
- Planning authority
- Buckinghamshire Council - South Bucks Area *
- Planning authority code
- E07000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 November 2022
- Valid date
- 11 November 2022
- Start date
- 26 January 2023
- Planning authority decision date
- 26 October 2022
- Appeal decision date
- 23 March 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 30119
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21