Appeal 3311397
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a loft conversion and rear side-return ground floor extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for a loft conversion and rear side-return ground floor extension at [site address] , Woolwich, Greenwich [postcode] in accordance with the terms of the application 22/2873/HD, dated 28 August 2022, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The materials to be used in the construction of the development hereby permitted shall match those used in the existing building.
The window to the toilet on the second floor of the development hereby permitted shall at all times be glazed with obscured glass and no part of that window that is less than 1.7 metres above the floor shall be capable of being opened.
Section 03
Application for costs
An application for costs was made by [name] against the Royal Borough of Greenwich Council. This application is the subject of a separate
Section 04
[name]
The main issue is the effect of the proposed development on the character and appearance of the host dwelling and that of the local area, with reference to the proposed rear dormer extension.
Section 05
Reasons
The host dwelling is a two storey palisaded mid terraced house with a two storey bay to the front and a two storey outrigger to the rear. The terrace of which the appeal property forms part is a relatively short run of 8 houses on a no through road that rises up towards its junction with [address]. This slope is reflected in the profile of the terrace, with the houses stepping down in pairs, which results in the terrace having a stepped roof profile.
The proposal is for a loft conversion, which includes a rear dormer extension to replace the whole of the rear main roof slope, a pair of roof lights in the front roof slope, and a rear ground floor flat roofed extension that would infill the passage between the outrigger and the boundary to the neighbouring house at [address] (No.19).
The boundary of the Woolwich Common Conservation Area (the CA) runs down the middle of the street at [address] and also encloses the area of open water at [name]. A large workshop building to the rear of the property and other larger commercial buildings on artillery place do, however, fundamentally screen the appeal property from views from within the CA at this point. The rear position of the proposal would also mean that it would not be significantly visible in views from the public realm towards the CA.
The proposed rear dormer would be accommodated by the continuation of the front roof slope so that it would be the same height as the roof of No.19. The proposed rear dormer would align with the additional height of the proposed roof ridge and would align with the existing rear elevation and the party wall upstands between the roofs of the two neighbouring houses.
The proposal would remove the existing step down in roof profile from No.19 to the host dwelling and would result in a step down between the roof of the host dwelling and that of [address], which currently aligns with that of the host dwelling. This proposed increase in the extent of the front roof slope would also result in the roof of the host dwelling no longer aligning with the ridge line of the terrace. Given the stepped nature of the roof ridge of the terrace and the party wall upstands between roofs, this change would be barely apparent.
The proposal is similar to that previously dismissed on appeal, but the design of the proposal appears to respond to the reasons given for this refusal and no longer includes a dormer roof extension to the rear outrigger. However, the previous proposal did include the same proposed changes to the extent of the front roof slope.
From the Officer report it would appear that the Council have, however, presumed that the Inspector for this earlier appeal and the Council missed that the proposal included a change to the extent of the front roof slope. I find nothing in the material before me to substantiate this. The Officer report also states the proposal would change the angle of the roof slope of the host dwelling. This is not substantiated by the application plans, which clearly show that the front roof slope is extended at the ridge, but with no change in angle. The existing rear roof would be replaced with the proposed dormer.
The Inspector for the earlier appeal did not consider that, in isolation, the proposed main rear roof dormer would be materially more harmful than that built under permitted development rights under the provision of the GPDO1, which presents a reasonable fallback position for the appellant. I see no reason to demur from this conclusion and find that the proposal would not result in any significant harm to the character and appearance of the host dwelling, or that of the local area. Further, with my statutory duty under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990 in mind, I find that the scale, screening, the rear positioning of the proposed dormer extension and distance to the Boundary of the CA would not also result in any harm to the setting of the CA.
Section 06
Conditions
Along with the standard condition relating to the timing of implementation, I have attached conditions to ensure design quality, which along with the required compliance with the approved drawings, further requires that materials used for the proposal match those of the host dwelling. To protect privacy, I have also imposed a condition relating to the glazing to the toilet window in the rear dormer extension.
Section 07
Conclusion
The appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 209No official casework-database value to compare
- Extracted decision date · page 1
- 4 April 2023Matches the official casework database
- Extracted site visit dates
- 14 March 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3311397
- Application reference
- 22/2873/HD
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Greenwich
- Planning authority code
- E09000011
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 28 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 17 November 2022
- Valid date
- 17 November 2022
- Start date
- 8 February 2023
- Planning authority decision date
- 24 October 2022
- Appeal decision date
- 4 April 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 30818
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21