Appeal 3311581
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of an outbuilding to provide parking, storage and home office.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
Since the appeal was submitted the Council has adopted the Waverley Borough Local Plan Part 2: Site Allocations and Development Management Policies (LPP2) on 21 March 2023, which forms part of the development plan. The Council have confirmed which policies are now in place and the appellant has had opportunity to comment on them. I will therefore reference the revised policies in my decision.
Section 04
[name]
The main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • the effect it has upon the openness of the Green Belt; and • if the development is inappropriate whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify the development.
Section 05
Whether the proposal would be inappropriate development in the Green Belt
Paragraph 149 of the Framework states that the construction of a new building is inappropriate in the Green Belt, but sets out 7 exceptions to this. Policy RE2 of the Waverley Local Plan (Part 1) 2018 (LPP1) refers directly to the Framework, whilst LPP2 Policy DM14 sets out specific criteria relating to 3 of the 7 Paragraph 149 exceptions, along with factors to take into account when considering the openness of the Green Belt.
The proposed use of the new building would be in relation to the existing residential use of the appeal site. The proposal would not extend, alter, or replace an existing building nor is the appeal site within a village, a position agreed by the main parties. Therefore, the proposal does not fall into any of the exceptions set out within Paragraph 149.
Accordingly, the proposal would constitute inappropriate development, as described in the Framework. As set out in Paragraph 147 of the Framework inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances.
Section 06
Openness
The location of the proposed development would be forward of the other buildings within the appeal site. It would be of reasonably large proportions, permanent in its construction, and solid in mass. It is appreciated views of this location would be limited to partial views through the boundary hedging from the access track which runs up the side of the appeal site.
However, the bulk and mass of that proposed would mean that these current views across the frontage would be curtailed, and the visual openness of this part of the site reduced. Furthermore, as openness also has a spatial aspect, the forward location of the proposal within the appeal site would physically encroach into an otherwise open area between the existing property and the road, where no current buildings or structures exist.
The appellant states that the proposal would consolidate built form on the appeal site within a compact footprint. However, in the context of openness, the proposal would increase the number of buildings on the site which would cover a larger area, and therefore cumulatively increase the built form footprint.
Consequently, the proposal would have a harmful effect both visually and spatially on the openness of the appeal site, and therefore the Green Belt it forms part of.
Section 07
Other considerations
The lack of existing secure, covered parking within the site is noted as is the appellant’s desire for a home office separate to the main dwelling. Nevertheless, due to the personal nature of these uses, I only attribute limited weight when considering them against the wider harm identified above.
I note the appellant’s position in relation to it being not unusual that a property in such a rural area would have covered parking. However, there is nothing before me to show that a lack of covered parking would prevent or reduce the appeal site’s capability to function as a residential dwelling. Therefore, I give this argument limited weight also.
I have considered the planning permissions at Chedworth (reference WA/2020/0274) and Calluna (WA/2015/1313) where in both cases a lack of secured garaging contributed to the very special circumstances. Both permissions were for single storey garage buildings that provided 1 or more enclosed bays for secure parking. As the proposal is a large 2 storey building and provides open parking bays only, I am satisfied the schemes are sufficiently different so as not to be directly comparable.
The appeal site is in the Surrey Hills Area of Outstanding Natural Beauty (AONB). AONBs are designated for the purposes of conserving and enhancing natural beauty and Section 85(1) of the Countryside and Rights of Way Act 2000 places a duty upon me to have regard to these purposes in this decision. The Council did not object to the appeal scheme in this regard and I agree that due to the design, the special qualities of the AONB would not be harmed.
The Council has also identified a lack of harm in respect of several other issues, including impact on the character and appearance of the area, an area of great landscape value, living conditions of future and neighbouring occupants, trees, and biodiversity. Nonetheless, an absence of harm is a neutral factor which can neither weigh for or against the proposal.
The appeal site is within the buffer zones of 2 Special Protection Areas (SPAs), [name] 1 and [name] 2 SPA. However, as I am dismissing this appeal for other reasons, I have not pursued this matter further. Nevertheless, should it have been found that no harm would arise in relation to the SPAs this to would be a neutral factor.
The Council’s position that such uses could be accommodated elsewhere on site is noted. Nevertheless, I am bound to assess the proposal as it stands before me.
Section 08
Conclusion
The proposal is inappropriate development in the Green Belt and would harm openness contrary to LPP1 Policy RE2, LPP2 Policy DM14 and the Framework. Paragraph 148 of the Framework states that substantial weight should be given to any harm to the Green Belt. The other considerations discussed above do not clearly outweigh this harm, so do not constitute the very special circumstances necessary to justify the development. Consequently, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2199No official casework-database value to compare
- Extracted decision date · page 1
- 3 August 2023Matches the official casework database
- Extracted site visit dates
- 25 July 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3311581
- Application reference
- WA/2022/01759
- Lead case reference
- Not recorded
- Planning authority
- Waverley Borough Council
- Planning authority code
- E07000216
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 95 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 21 November 2022
- Valid date
- 9 December 2022
- Start date
- 6 April 2023
- Planning authority decision date
- 13 October 2022
- Appeal decision date
- 3 August 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 36589
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21