Appeal 3312046
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the erection of a gate and associated fencing alongside the boundary of a residential property.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
The postcode of the appeal site differs on the planning application to that on the decision notice, appeal application and the appellant’s statement of case. Within the header I have used the postcode shown on the latter documents.
The proposed development is retrospective and from my observations on site, the plans represent that which has been built.
Since the appeal was submitted the Council adopted the Guildford Borough Local Plan: Development Management Policies (LPDMP) on the 22 March 2023, which forms part of the development plan. The Council have confirmed which policies are now in place and the appellant has had opportunity to comment on this. I will therefore reference the revised policies in my decision.
Section 04
[name]
The main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • the effect it has upon the openness of the Green Belt; • the effect of the proposal on character and appearance of the area; and • if the development is inappropriate whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstance necessary to justify the development.
Section 05
Reasons
The appeal site is a large, detached property within a row of similar sized houses on [address]. [address] is an access road for these properties and runs parallel to [address] but is separated from it by a relatively mature planting strip. These properties have a variety of hedged and fenced boundaries along the lane, with many driveways either left open or with low level, often non-solid gates. These treatments provide a level of intervisibility between each property and the lane, often with clear glimpses along the driveways which emphasises their setback nature. This is characteristic of the pockets of housing scattered along the various lanes which weave through the fields and woodlands surrounding Pirbright village.
Section 06
Whether the proposal would be inappropriate development in the Green Belt
Paragraph 149 of the Framework states that the construction of a new building is inappropriate in the Green Belt subject to 7 exceptions. In this context the term ‘building’ is commonly taken to refer to any structure or erection and so would include a gate and fence. However, there is no provision for a building of the form proposed within paragraph 149, and there is nothing before me stating the gate and fence have replaced, extended, or altered an existing building. Therefore, the proposal, as a new building, would constitute inappropriate development in the Green Belt when paragraph 149 is applied.
Nevertheless, it is acknowledged that the appellant does not consider the gate and fence a building, as the Framework does not provide a specific definition within its glossary. Nevertheless, Paragraph 150 of the Framework provides for other forms of development which are also not inappropriate in the Green Belt.
However, the proposal does not constitute mineral extraction, engineering operations, local transport infrastructure, the re-use of an existing building, a material change in the use of the land, nor is it development brought forward under a [name] to Build Order or a Neighbourhood Development Order. Consequently, Paragraph 150 of the Framework does not apply.
Therefore, when judged against the wording of the national policy the proposal is inappropriate development in the Green Belt, and contrary to Policy P2 of the Guildford Borough Local Plan: Strategy and Sites (LPSS), which refers directly to the tests in the Framework.
Due to the scale of the proposal, it is unlikely to prejudice any of the purposes of including land in Green Belts. Nevertheless, as set out above the proposal is inappropriate development and paragraph 147 of the Framework states that by definition inappropriate development is harmful and should not be approved except in very special circumstances.
Section 07
Openness
The gate and fence are solid, fabricated structures located where such structures did not previously exist. It is appreciated the new planting means the fence is less visible than the gate, and the planting strip along [address] provides some additional screening. However, the openness of the Green Belt has a spatial aspect as well as a visual aspect. The proposal encroaches into an area previously open and beyond the other built structures within the appeal site. Therefore, it physically reduces the openness of the appeal site and the Green Belt it is part of.
Therefore, the proposal affects the openness of the Green Belt, but only to a limited degree, due to the scale of the proposed development.
Section 08
Character and appearance
The solid form, size and colour of the gate is suburban in design, and not characteristic of [address] or the driveway accesses to other properties in the immediate area. They are of a style and form at odds to the wider wooded and pastural setting of both [address] and [address], and more generally the rural setting of Pirbright village.
However, the screening of the fence by the yew hedge ensures the visual impact of the fence is minimalised. The hedge along with the bank forms a type of boundary treatment which is in keeping with other properties in the surrounding area, and the continued retention of the hedge could be conditioned to ensure the fence is visually acceptable when viewed from the lane.
The lack of objection from nearby residents is noted, as are the examples submitted by the appellant. However, there is nothing before me stating the examples are lawful, and the existence of similar development does not mitigate the harm I have identified.
In conclusions, although I do not find the fence harmful, the gate does cause modest harm to the character and appearance of the area. The gate would therefore fail to comply with LPSS Policy D1, and LPDMP Policy D4 insofar as they seek high quality design which reflects the distinct local character of an area.
Section 09
Other circumstances
The appellant considers the proposal necessary to control access into and out of the site, namely keeping dogs and children in, and trespassers and deer out; and that it reduces the impact of increased traffic along [address]. However other steps could be taken to control access to the property, and it has not been shown that the fence and gates have been constructed with specific qualities to reduce air and noise pollution from the road. Therefore, these factors are of limited weight.
A lack of harm in relation to highway safety and the living conditions of neighbours, are neutral factors so cannot, by definition, weigh for or against the proposal. This would also be the case for the lack of harm identified in relation to the fence’s impact on character and appearance. The appellant’s connection with the area is also noted but this does not justify why the fence and gate are required.
Section 10
Planning Balance and Conclusion
Paragraph 148 of the Framework requires substantial weight to be attached to any harm to the Green Belt. The proposal as a whole is inappropriate development in the Green Belt and the gates cause harm to the character and appearance of the area. The other considerations do not clearly outweigh the totality of this harm, therefore, the very special circumstances necessary to justify the development do not exist.
For the reasons given above the appeal scheme would conflict with the development plan when read as a whole and there are no sufficiently weighted material considerations, including the Framework, which would indicate a decision otherwise. The appeal is, therefore, dismissed
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2199No official casework-database value to compare
- Extracted decision date · page 1
- 12 June 2023Matches the official casework database
- Extracted site visit dates
- 18 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3312046
- Application reference
- 21/P/01820
- Lead case reference
- Not recorded
- Planning authority
- Guildford Borough Council
- Planning authority code
- E07000209
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 28 November 2022
- Valid date
- 28 November 2022
- Start date
- 16 February 2023
- Planning authority decision date
- 14 September 2022
- Appeal decision date
- 12 June 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 33864
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21