Appeal 3312294
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a new roof to existing bungalow without complying with a condition attached to planning permission [name]/680/00, dated 30 August 2000.
Section 02
Decision
The appeal is allowed and the planning permission [name]/680/00 for a new roof to existing bungalow at [site address] granted on 30 August 2000 by Basildon Borough Council, is varied by deleting condition 3.
Section 03
[name]
The property at the time of the original application was described as [name] and has also been known as Ken-Cot. For the purposes of this appeal, I have used its current name Reflections.
Section 04
Main Issue
The appellant considers that there are no justifiable reasons why the Council have imposed a condition, which in effect restrict permitted development rights for the property. It is their view that the disputed condition does not satisfy the ‘necessary’ and ‘reasonable in all other aspects’ tests set out in paragraph 55 of the National Planning Policy Framework (the Framework).
The Council in their delegated report acknowledge that any development permitted by Class B of Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (the GPDO) is subject to the condition that any windows inserted on a wall or roof slope forming a side elevation of the dwellinghouse must be obscure-glazed and non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which it is installed. Consequently, in the event that I was to allow the appeal I am satisfied that the privacy of neighbouring occupiers would be safeguarded.
Therefore, the main issue is whether the condition is reasonable or necessary to prevent harm being caused to the openness of the Green Belt (GB).
Section 05
Reasons
Paragraph 56 of the Framework advises that planning conditions should be kept to a minimum, and only imposed where they are necessary, relevant to planning and to the development to be permitted, enforceable, precise and reasonable in all other respects. The Planning Practice Guidance (PPG) says that conditions restricting the future use of permitted development rights or changes of use will rarely pass the test of necessity and should only be used in exceptional circumstances.
Permitted development rights to extend dwellings and construct domestic outbuildings under the GPDO apply in the GB. Had the Government wanted to withdraw or restrict permitted development rights for householder developments in the GB it could have done so, as it has done with other locations such as Conservation Areas and National Parks. The fact that it has not is evidence that it considers the implementation of permitted development rights to be acceptable in a GB location.
The appeal dwelling could have been extended, or outbuildings constructed, in accordance with the conditions and limitations set by the GPDO prior to the grant of the planning permission in question. These rights could still be exercised if the planning permission had not been implemented. There is no advice in the Framework or the PPG to suggest that the grant of planning permission for the provision of a new roof on the host dwelling in the GB amounts to the exceptional circumstances necessary to impose a condition which has the effect of limiting permitted development rights.
The Council imposed the disputed condition, in part, due to concerns about potential harm to the openness of the GB and refused permission to remove it on the basis that a roof alteration could hypothetically be carried out using permitted development rights. However, no reasoned explanation of the particular circumstances have been provided to indicate how this case would differ from proposals for householder extensions and alterations elsewhere in the GB.
Furthermore, in granting planning permission, the Council accepted that the provision of a new roof would not, in itself, cause unacceptable harm to the openness of the GB. That said, I saw on my site visit that an extension was under construction to the rear of the host property and a number of outbuildings were located within the rear garden. However, I have no substantive evidence before me to suggest that an addition or alteration to the roof, when combined with these structures, would represent disproportionate additions to the original dwelling, or would affect openness .
As the likelihood of future harm to the openness of the GB is not significantly increased as a result of the new roof, with or without additions or alterations to the roof, the disputed condition is not reasonable or necessary. I therefore conclude that, without the disputed condition, the development would accord with paragraph 149 (c) which seeks to protect the GB from inappropriate development and maintain its openness.
Section 06
Other Matters
The Council has suggested the addition of a condition requiring that ‘ Any windows in roofspace to side elevations shall be obscurely glazed and non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which they are installed. These qualities should thereafter be permanently maintained.’ This is a precondition of any roof alterations carried out under Class B of Part 1 of Schedule 2 of the GPDO and therefore I am not required to respecify it in my decision.
The Council has indicated in their delegated report that an application for an addition or alteration to the roof of the host property roof under Class B of Part 1 of Schedule 2 of the GPDO may fail as the current roof could no longer be considered to qualify as the ‘original roof’. Whilst noting this point it is not a matter before me to consider in the determination of this appeal.
Section 07
Conclusion
For the reasons given above, I conclude that the appeal should be allowed. I will vary the planning permission by deleting the disputed condition.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 32127No official casework-database value to compare
- Extracted decision date · page 1
- 29 September 2023Matches the official casework database
- Extracted site visit dates
- 19 September 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3312294
- Application reference
- 22/01175/VAR
- Lead case reference
- Not recorded
- Planning authority
- Basildon District Council
- Planning authority code
- E07000066
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 2. Refused permission to vary or remove a condition(s)
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Other
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 1 December 2022
- Valid date
- 1 December 2022
- Start date
- 23 March 2023
- Planning authority decision date
- 17 October 2022
- Appeal decision date
- 29 September 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 39488
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21