Skip to main content
Official casework recordAllowedCurrent release

Appeal 3312521

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the creation of a balcony to the rear of the existing ground floor.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the creation of a balcony to the rear of the existing ground floor at [site address] , Kensington and Chelsea, London [postcode] in accordance with the terms of the application, [name]/22/05829, dated 27 September 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with [name] 01-100, 02-300, 02-301, 03-300 & 04-300.

  2. Section 03

    [name]

    The main issues in this case are a) whether the development would preserve or enhance the character or appearance of the Chelsea Conservation Area, and whether it would harm its significance as a designated heritage asset and b) its effect on living conditions, due to its impact on the outdoor amenity space for those living at [address] and the privacy of neighbouring residents.

  3. Section 04

    Conservation area

    Through its built form and layout, the character and appearance of the conservation area reflect its development in the first half of the 19th Century, and its significance lies, in part, in it still demonstrating this period of growth. The terrace containing No 3 contributes positively to the significance of the conservation area and respects its character and appearance because, among other things, its design and appearance show it dates from when the area was developed. Moreover, its rear elevation, with its closet wings, is again typical of that period and informs an understanding of how the houses in the terrace functioned.

    No 3 has already been altered at the rear, with the area between the closet wing and the side boundary being infilled with an extension. This rises up to near the bottom of the first floor window, and is substantially glazed. However, the transparent nature of this addition means the form of the brick closet wing is still apparent and noticeable. Extensive glazing is also found at basement level, and so it is a common feature at the back of this property.

    The floor of the balcony and the enclosing barrier along its edge would be of glass, and it would run across the entirety of the back of No 3, behind both the closet wing and the modern glazed element. It would therefore project beyond the terrace’s rear elevation. However, as it would be at ground level, it would be a subordinate feature on the building that would not be dominant or prominent, and would not disrupt any rhythm on the row. The extensive glazing already present means this would not be an unacceptable increase in the use of such a material, while it would still allow the role and presence of the closet wing to be perceived and would not undermine any sense of openness that remains at the back of the house. Therefore, it would not adversely affect either No 3 or the conservation area.

    To my mind, the proposal’s nature and scale mean it cannot be treated as an extension for the purposes of Policy CL9 in the Royal Borough of Kensington and Chelsea Local Plan. However, even if I had defined it as such, the impact of the works discussed above would have meant that any conflict with that policy did not offer a basis to resist the scheme.

    Accordingly, I conclude the proposal would not fail to preserve the character or appearance of the Chelsea Conservation Area, and would not cause harm to its significance as a designated heritage asset. Consequently, it would not conflict with the National Planning Policy Framework, or Local Plan Policies CL1, CL2, CL3, CL6 or CL9, which collectively seek high quality development that respects its context and safeguards the historic heritage of the borough.

  4. Section 05

    Living conditions

    The property’s rear patio is a small area at basement level that measures about 3.5m by 5m. It is enclosed on one side by the dwelling, and on the other 3 by not only the walling that extends up to ground level, but also the tall fencing on top of that walling. Therefore, while providing some benefit as an outdoor space for use by the residents, it is not an area with a strong sense of openness, and the amount of direct sunlight it receives is no doubt limited.

    Given these factors, and mindful of the glazed nature of the balcony that would reduce its shadow and its sense of enclosure, I consider what is now proposed would not have a material effect on the contribution of the patio to the residents’ living conditions. Indeed, by providing an outdoor area at ground floor level the scheme would bring some benefit in this regard.

    Furthermore, given the tall fences at ground level, and the level of overlooking that is now possible from the large windows at No 3, the proposal would not result in any unacceptable loss of privacy for neighbouring residents in this tight built-up area.

    Accordingly, I conclude the proposal would not unreasonably harm the living conditions of either residents at No 3 or those living adjacent, and so would not conflict with Local Plan Policy CL5, which concerns the delivery of good living conditions for occupants of existing and neighbouring buildings.

  5. Section 06

    Conditions

    I see no need to impose any conditions beyond the standard commencement condition, and, for the avoidance of doubt, a condition identifying the approved plans.

  6. Section 07

    Conclusion

    I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 193No official casework-database value to compare
    Extracted decision date · page 1
    30 March 2023Matches the official casework database
    Extracted site visit dates
    10 March 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3312521
Application reference
PP/22/05829
Lead case reference
Not recorded
Planning authority
Royal Borough of Kensington and Chelsea
Planning authority code
E09000020

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
0 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
5 December 2022
Valid date
5 December 2022
Start date
17 January 2023
Planning authority decision date
23 November 2022
Appeal decision date
30 March 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
30580
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21