Skip to main content
Official casework recordDismissedCurrent release

Appeal 3312643

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey side and rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matter

    The address for the appeal site used in the heading above has been taken from the application form and decision notice (Chigwell), rather than that give on the appeal form ( [site address] ).

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the living conditions of neighbouring residents, with particular reference to outlook and the potential for overshadowing.

  4. Section 05

    Reasons

    The appeal property is part of a terrace of dwellings of the same original design and form. Within the terrace there is a pattern of two-storey rear wings (‘outriggers’) joined at a shared boundary, with gaps either side to the opposite boundary. This creates a series of deep, undeveloped recesses between outriggers.

    The proposed side and rear extension would fill the gap between the outrigger of the appeal property and the boundary with [address] (No.775), save for an enclosed but open courtyard directly behind the main rear wall of the house. Although the courtyard wall would be no higher than the existing fence at this point between the two properties, it would do little to mitigate the overall depth of the proposed extension along the shared boundary. Even taking into account the higher ground level of No.775, the combination of the proposed depth and height means the resultant extension would appear unacceptably intrusive and overbearing to the outlook for occupants of No.775. This adverse sense of enclosure would be exacerbated by the narrow gap between the outrigger of No.775 and the shared boundary, creating an oppressive ‘tunnelling’ effect in views from ground-floor habitable rooms.

    I acknowledge that the side-facing window to the neighbouring kitchen/dining area of No.775 is secondary, but the proposal would nevertheless be oppressive given the reasonably close proximity. The outlook from the ground-floor rear-facing window in the main section of the dwelling would already be restricted by the outriggers at Nos. 773 and 775, but this outlook would be further diminished by the proposal.

    At points of the day there would be a degree of overshadowing of No.775 due to the position of the outriggers, but in the absence of any evidence to the contrary I consider that the excessive depth and additional height of the proposal is likely to add to overshadowing of the ground-floor rear habitable rooms of the dwelling. This would be contrary to Policy DBE9 of the Epping Forest District Local Plan 1998 and Alterations 2006 (LP), which seeks to ensure that extensions do not result in an excessive loss of amenity for neighbouring properties in matters including visual impact and loss of daylight/sunlight.

    A store at the end of the outrigger on the appeal property would be demolished to make way for the rear extension. The relationship between buildings means that the extra depth and height next to No.771 is unlikely to cause a sense of enclosure that would materially harm the outlook for occupants of that property. However, this does not alter my conclusion in respect of the effect on No.775.

    I am mindful that no objections to the proposal were submitted by neighbouring residents at the application stage. Nevertheless, paragraph 130 (f) of the National Planning Policy Framework (the Framework) seeks to create places which promote health and well-being, with a high standard of amenity for existing and future users. As occupants and their opinions change over time, it is appropriate to secure by design reasonable living conditions for all users.

    I therefore conclude that the proposal would diminish the outlook and increase the potential for overshadowing for occupants of [address] to a degree that living conditions would be harmed. This would be contrary to the Framework, LP Policy DBE9, and LP Policy CP7, which although it supports extensions to buildings in built-up areas, opposes any development which would result in loss of amenity. It would also conflict with Policy DM 9 (H) of the Epping Forest District Local Plan [name] 2017, to which I have had regard given its advanced stage in the examination process.

  5. Section 06

    Other Matters

    The appellant has drawn attention to a planning permission1 granted at [address], Chigwell. However, the supplied delegated report indicates that both neighbouring properties had been extended and that the proposed rear extension would project “3m past the rear elevation of both adjacent neighbours”. The submitted plans suggest that the projection beyond the 1 EPF/2992/14 – single storey side and rear extension. recess of [address] was approximately 6m, and the plans do not indicate any window in that recess. The projection is materially less than proposed in this case, and that permission would not therefore justify acceptance of the

  6. Section 07

    appeal proposal.

    The appellant has raised concerns about the Council’s decision-making process and impartiality. However, these are not matters for consideration within this appeal, which has been assessed on its planning merits.

  7. Section 08

    Conclusion

    For the above reasons, I conclude that this appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 867No official casework-database value to compare
    Extracted decision date · page 1
    20 February 2023Matches the official casework database
    Extracted site visit dates
    7 February 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3312643
Application reference
EPF/1325/22
Lead case reference
Not recorded
Planning authority
Epping Forest District Council
Planning authority code
E07000072

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 December 2022
Valid date
6 December 2022
Start date
3 January 2023
Planning authority decision date
4 October 2022
Appeal decision date
20 February 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
28519
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21