Appeal 3312671
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
to extend the current bay window from 2nd to 3rd floor rear elevation to match adjoining semi-detached villa of no. 49 Tregunter. Remove unsightly iron bridge railing from 2nd floor bay to 3rd bay floor window of no. 49 Tregunter.
Section 02
Decision
The appeal is allowed, and planning permission is granted to extend the current bay window from 2nd to 3rd floor rear elevation to match adjoining semi-detached villa of no. 49 Tregunter. Remove unsightly iron bridge railing from 2nd floor bay to 3rd bay floor window of no. 49 Tregunter at [site address] , Kensington and Chelsea, London, [postcode] in accordance with the terms of the application ref: PP/22/05900 dated 28 September 2022, subject to the following conditions:
The development hereby permitted shall be begun before the expiration of three years from the date of this permission;
The development shall not be carried out except in complete accordance with the details shown on submitted plans: 000.001 (location plan), 000.0002 (site plan), 220.001B (proposed rear elevation) and 120.004C (proposed second floor plan);
The materials used in the development hereby permitted shall match those of the existing dwelling or those stated on the submitted application form as appropriate unless details are submitted to, and approved in writing by, the Local Authority;
The windows hereby permitted shall be timber framed, white painted, double hung, sliding sashes, and so maintained;
No development shall commence until: A) An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council’s Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the [name] and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.
Section 03
Procedural Matters
Whilst both the appellant’s description, and the Council’s decision notice, reference number [address] I note from my site visit that the appeal site is paired with number [address], not 49. This is correctly referenced in the appellant’s original design and access statement. For the avoidance of doubt the proposal would therefore result in development matching, and removal of railings to, number [address].
Section 04
Main Issue
The main issue is the impact of the proposal upon the character and appearance of the host property, terrace, and Boltons Conservation Area.
Section 05
Reasons
The appeal site is three storey, semi-detached, dwelling house with a lower ground floor level. It is paired with [address] (no. 45) as well as being part of a wider terrace (of semi-detached villas) along [address] (numbers 37-51) which stand within the Boltons Conservation Area (CA). The appeal site is identified in the Boltons Conservation Area Appraisal (CAA) as a positive building which makes a positive contribution to the CA in terms of its character and appearance. As a result of this, proposals should be sympathetic with regards to the character and design of the property as well as the wider CA.
The proposal seeks to extend an existing bay window from second to third floor as well as remove an iron bridge railing that currently links from the appeal site to No. 45. The extension would be sited on the existing canted bay of the property and would be approximately 1 metre in depth, 3 metres in width and 2.7 metres in height. The proposal would be constructed in matching brickwork with timber sash windows at the rear elevation which would be consistent with the appearance of the existing dwelling as well as surrounding materials in the wider row of dwellings.
The CAA notes that some of the semi-detached pairs on [address] have elegant shallow canted stucco bays at ground floor and first floor levels and that these are special features that are unusual in the area. Within the wider terrace I acknowledge that there is a general rhythm of canted bay extensions which rise up to (a maximum of) the first-floor level of the buildings. There is, however, a canted bay window and extension/bay window at no. 45, that already extends up to level within the proposal before me and I find that this currently unbalances the pair of villas and already disrupts the rhythm of rear extensions along the row. Whilst there is no planning history for the upward extension at no. 45, the Council have not evidenced that this adjoining development is subject to, or likely to be subject to, enforcement action which could result in its subsequent removal.
The CAA, in discussing urban form, notes the importance of gaps and I further note important views being recorded. The proposal would not, however, impact upon either of these elements which are of important to the character and appearance of the CA. The appeal site forms a clear pairing with no. 45 with important gaps either side of the villas being maintained as a result of the proposal. The appellant’s submissions show that the proposal would be extremely limited in views from [address] and [address] and indeed I found this to be the case at the time of my site visit. Views from [address] would be near impossible within the street scene given the brick wall, fencing and vegetation boundary treatments alongside number [address]. In addition, from that direction, the proposal would be behind the existing extension at no.45.
As a result of the proposal, I find that the extension would be consistent with the neighbouring extension and would result in a more balanced, and symmetrical, appearance for the pair of villas which is appropriate for the character and appearance of the host dwelling. In addition, the proposal would result in the removal of a cast iron gate bridge which currently extends from the appeal site to the adjoining property which I find is uncharacteristic, and unsightly, when considering the rear elevation of these properties.
On balance, I consider that the upward extension to the existing bay window would result in development which would balance out the pair of properties within the overall row but would essentially be limited in general views within the CA. The remaining features, identified in the [name], remain for the rest of the semi-detached pairs on [address]. As well as improving balance the proposal would remove the iron railing bridge which would be a positive enhancement to the host property as a result of the proposal. Overall, I find the proposal to have a neutral impact upon both the host property and the CA and that there would be no harm to the CA.
Section 72 of the Planning (Listed Buildings in Conservation Areas) Act 1990 requires that special attention shall be paid to the desirability of preserving when enhancing the character or appearance of the CA. In this context, preserving can also be taken to mean doing no harm. In accordance with paragraph 199 of the National Planning Policy Framework 2021 when considering the impact of the proposed development on the significance of a designated heritage asset, great weight should be given to the asset’s conservation. I do not find that the proposal would impact upon the character or appearance of the property, terrace or the wider CA and it would, on the basis of doing no harm, preserve the character and appearance of the CA.
The proposal would be consistent with The Royal Borough of Kensington and Chelsea Local Plan 2019 (LP) Policy CL1 which requires all development to respect the existing context, character and appearance, LP Policy CL2 which requires development to take opportunities to improve the quality and character of buildings, the area and the way it functions, and LP Policy CL3 which requires development to preserve and take opportunities to enhance the cherished and familiar local scene. LP Policy CL3 further requires that development should preserve or enhance the character or appearance of the Conservation Area.
The proposal would also be consistent with LP Policy CL6, which requires that alterations and additions do not harm the existing character and appearance of the building and its context, LP Policy CL9 which requires extensions and modifications to existing buildings to be subordinate to the original building, to allow the form of the original building to be clearly understood, and to reinforce the character and integrity of the original building, or group of buildings. The proposal would also be consistent with LP Policy CL11, which requires development to protect and enhance views and gaps that contribute to the character and quality of the area.
Section 06
Conditions
The Council’s questionnaire suggests that conditions relating to timing, materials and accordance with the approved plans are not necessary however, I consider they are necessary and have applied them to the permission granted. A time condition is attached to comply with section 51 of the Planning and Compulsory Purchase Act 2004. A condition requiring the development to be in accordance with the approved plans is required to control and define the development which is granted consent.
A materials condition, and a condition regarding the window type, is required to ensure the proposal matches the host dwelling and that any deviations in materials from existing are approved by the Council to ensure an appropriate finish. A condition regarding a construction management plan is required to mitigate the impact of construction work upon the levels of amenity for neighbouring occupiers.
Section 07
Conclusion
For the reasons outlined above, and taking account all other matters raised, I conclude that the appeal should be allowed subject to conditions.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 115No official casework-database value to compare
- Extracted decision date · page 1
- 7 June 2023Matches the official casework database
- Extracted site visit dates
- 9 May 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3312671
- Application reference
- PP/22/05900
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Kensington and Chelsea
- Planning authority code
- E09000020
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 2 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 7 December 2022
- Valid date
- 2 March 2023
- Start date
- 27 March 2023
- Planning authority decision date
- 24 November 2022
- Appeal decision date
- 7 June 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 33694
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21