Appeal 3312855
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the ‘erection of a first floor extension and alterations together with the removal of outbuildings.’
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The appeal site is located within an area of Green Belt. Accordingly, the main issues are: • Whether the proposed development would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the ‘Framework’) and relevant development plan policies; • The effect of the proposal on the openness of the Green Belt; and • If the development would be inappropriate, whether the harm to the Green Belt by way of inappropriateness and any other harm, would be clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify it.
Section 04
Whether Inappropriate Development
The Framework states that the construction of new buildings is to be regarded as inappropriate development subject to the exceptions which are set out in paragraph 149. Part c) of this paragraph lists the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building, as one such exception. This is also set out in Policy P2 of the Guildford Borough Local Plan: Strategy and Sites (2019) (LP).
The appeal property has been extensively extended, particularly to the rear, and the Council set out that the addition of a further extension as proposed would result in a 156% increase on the original property.
The appellants however set out that the rear-most part of the single storey rear projection was originally constructed as a separate detached outbuilding. However, there is no substantive evidence before me that this previous outbuilding was part of the original property, which is defined in LP Policy P2 as: i. the building as it existed on 1 July 1948; or ii. if no building existed on 1 July 1948, then the first building as it was originally built after this date'.
Even if I accepted the appellant’s argument, they put the total increase at some 80%. Neither LP Policy P2 nor the Framework define disproportionate however, I consider that an increase of this magnitude of the floorspace of the original property across two storeys would be significant. Moreover, there would be a considerable increase in the massing of the first floor element of the house. This would, in combination with the previous additions, amount to a substantial increase in the form, bulk and overall scale and size of the original building. This is consistent with how the two appeal decisions1 referenced by the appellants were considered.
In light of the above I conclude that the further addition proposed would comprise a disproportionate addition over and above the size of the original building and would result in inappropriate development in the Green Belt, as described in LP Policy P2 and paragraph 149 of the Framework.
Section 05
Openness
The proposal would increase the depth and massing of the property at first floor level, which would be visible from the adjacent properties. There would be therefore a visual impact upon openness in addition to the spatial impact that would result, and openness would be reduced.
In this regard, the Framework makes it clear that openness is an essential characteristic of the Green Belt.
Section 06
[name]
The appellant proposes to remove two outbuildings, sited at the end of the rear garden. The appellants measure these single storey buildings at a combined total of 23.2sqm, less than the proposed additional floorspace. Whilst lessening the spread of development across the site, their removal would not therefore mitigate nor offset the scale, nor, given the first floor element proposed, the height and additional massing proposed.
The proposal would provide additional living space for the appellant and would generate some economic benefits during the construction phase. However, these are modest benefits that are common to most developments of this type and size.
Section 07
Other Matters
Whilst the appellant has set out that the development would comply with other policies and various paragraphs of the National Planning Policy Framework (the Framework), would meet standards and not cause harm with regards to 1 Appeal reference APP/Y3615/D/17/31855 & APP/Y3615/D/18/3209793 matters such as, amongst others, character and appearance and impact on the living conditions of neighbours, this to be expected in any development and does not weigh in favour of the proposal.
Section 08
Conclusion
The proposal would constitute inappropriate development in the Green Belt and would reduce openness in this location. The Framework states that substantial weight should be given to any harm to the Green Belt. Even when taken together, I conclude that the other considerations do not clearly outweigh the harm in this case. Consequently, the very special circumstances necessary to justify the development do not exist. The proposal is therefore contrary to LP Policy P2 and guidance contained in the Framework relating to Green Belts.
For the reasons given above I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3478No official casework-database value to compare
- Extracted decision date · page 1
- 29 June 2023Matches the official casework database
- Extracted site visit dates
- 19 June 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3312855
- Application reference
- 22/P/00815
- Lead case reference
- Not recorded
- Planning authority
- Guildford Borough Council
- Planning authority code
- E07000209
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 23 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 December 2022
- Valid date
- 22 December 2022
- Start date
- 17 February 2023
- Planning authority decision date
- 7 October 2022
- Appeal decision date
- 29 June 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 34802
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21