Skip to main content
Official casework recordDismissedCurrent release

Appeal 3312924

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a loft conversion with reduced front dormer and rear dormer.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the development on the character and appearance of the local area.

  3. Section 04

    Reasons

    The appeal site is a two storey detached dwelling set on a slightly elevated, prominent corner plot at the entrance to [address]. The immediate local area is characterised by two storey brick-built dwellings with hipped and open gable roof forms, giving a strong sense of uniformity to the street scene.

    The appeal scheme is for a pitched roof front dormer and flat roof rear dormer with side roof light. The size of both dormers has been reduced since previous applications and the council has not objected to the choice of materials nor the rear dormer element.

    The dormers would each be located in the centre of a large roof space and small in size in proportion to the roof. However, the front dormer would introduce an anomaly to an otherwise uniform street scene, and one that is exacerbated by the appeal site’s highly visible and prominent location. This would result in an incongruous addition which would cause harm to the established character and appearance of the local area.

    The appellant highlights an existing new build property with a flat-roofed front dormer with rendered walls further down [address]. This property is located at the very end of the cul-de-sac and the front dormer element is oriented away from the street scene and neighbouring properties and towards woodland, therefore having limited visibility in the street scene. In contrast, the appeal site is in a prominent, raised corner plot position at the entrance to [address].

    The dwellings at [address] and [address] have front dormers, but are located on streets with a range of building styles and designs, some of which also have front dormers so these examples are not comparable.

    The dwelling at [address] is an end-of-terrace property which is set next to open space and three-storey flats, with a range of different property styles further along the road, so is in a more mixed context than the appeal site. [address] has two front dormers but is some distance from the appeal site and, again, in a different context.

    Consequently, I conclude that the proposed development would have a harmful effect on the character and appearance of the local area. It would therefore conflict with Policy BE14 of the Brentwood Local Plan, which seeks to ensure - amongst other matters - that new development responds positively and sympathetically to the context. In addition, the proposal would not accord with the National Planning Policy Framework (the ‘Framework’) which states that developments should be sympathetic to local character.

  4. Section 05

    Other Matters

    The appellant has stated that the front dormer is necessary to accommodate a staircase to access the proposed second floor. [name] understand the reasons for this design, this does not outweigh the concerns which I have in relation to the main issue identified above.

    There are no objections to the proposal from neighbouring occupiers or other authorities. However, this does not alter my conclusions on the main issue.

    The appellant has stated that the concerns regarding substandard accommodation could be resolved with the addition of roof lights installed under permitted development rights. However, a scheme with rooflights is not before me and it is unclear whether or not they would provide adequate living conditions for occupiers.

    Concerns have been raised by the appellant regarding the Council having taken inconsistent approaches to similar applications. However, this matter is not determinative as to the acceptability of the proposal, and I have therefore considered the appeal based on the evidence before me.

    Planning permission has been previously granted on the appeal property for a hip to gable roof extension with a dormer and rooflights to rear1. A previous application also secured permission for a rear dormer with Juliette balcony and rooflight to side2. I note that construction of a rear dormer with [name] and rooflight to side was found to be lawful under the Town and Country Planning (General Permitted Development) (England) Order 2015. However, as these schemes do not include the front dormer element, they would have a lesser impact on the character and appearance of the local area and therefore do not alter my conclusions above.

  5. Section 06

    Conclusion

    For the reasons given, I conclude that the development conflicts with the development plan, read as a whole. No material considerations have been shown to carry sufficient weight to warrant a decision otherwise than in 1 22/00707/HHA 2 22/00552/S192 accordance with it. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4148No official casework-database value to compare
    Extracted decision date · page 1
    26 May 2023Matches the official casework database
    Extracted site visit dates
    5 April 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3312924
Application reference
22/01297/HHA
Lead case reference
Not recorded
Planning authority
Brentwood Borough Council
Planning authority code
E07000068

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
35 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
11 December 2022
Valid date
15 December 2022
Start date
3 February 2023
Planning authority decision date
6 December 2022
Appeal decision date
26 May 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
33260
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24