Skip to main content
Official casework recordAllowedCurrent release

Appeal 3313057

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as “first floor rear extension”.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for first floor rear extension at [site address] in accordance with the terms of the application, Ref 22/01829/FU, dated 9 March 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: [name] 1 and 2A.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

  2. Section 03

    [name]

    The main issues are whether the proposal is inappropriate development in the Green Belt and the effect of the proposal on openness.

  3. Section 04

    Reasons

    Policy N33 of the Leeds Unitary Development Plan 2006 (LUDP) and Policy HDG3 of the [name] Planning Document 2012 (SPD) relate to development in the Green Belt. Paragraph 149 of the National Planning Policy Framework (the Framework) states that construction of new buildings in the Green Belt should be regarded as inappropriate, unless the development falls within the exceptions list. This list includes the extension or alteration of a building provided that it does not result in the disproportionate additions over and above the size of the original building.

    Policy HDG3 states that extensions to dwellings in the Green Belt should represent limited development and in order to be considered as limited development all existing and proposed extensions should not exceed 30% increase over and above the original house volume. The Council calculate that the volume of the proposed extension including existing extensions would exceed a 30% increase over the volume of the original house. I have no reason to question these calculations therefore the proposal would be contrary to Policy HDG3 as it exceeds 30% increase over and above the original house volume.

    The proposal would replace an existing balcony area which has an existing floorspace. There is a high screen fence along the side and a metal framework around the balcony. Whilst this does not necessarily indicate a structure with a volume it does have a floorspace which can be used by the occupants of the appeal property. The floorspace of the balcony would be similar to the floorspace of the proposed extension.

    The proposed extension would be a relatively small addition, with a low roof that would not be prominent within the surrounding area. Given the size of the proposal, the existing floorspace of the balcony and the existing fence screening and metal framework, the proposal would not be a disproportionate addition over and above the size of the original building.

    Paragraph 149(c) of the Framework does not include any requirement for openness to be assessed. The proposal would not compromise the openness of the Green Belt in this location.

    Whilst the proposal would be in breach of Policy HDG3 of the SPD for the reasons detailed above, the SPD is not part of the adopted development plan. There would be no material harm to the Green Belt or its openness and the proposal would be a limited extension that would not be a disproportionate addition over and above the size of the original building. The proposal would be in accordance with Policy N33 of the LUDP and paragraph 149(c) of the Framework.

  4. Section 05

    Conditions

    I have imposed conditions specifying the standard timescale condition and relevant drawings as this provides certainty. In the interests of character and appearance it is necessary for a condition to be imposed relating to materials.

  5. Section 06

    Conclusion

    The proposal would not conflict with the development plan as a whole and there are no other considerations, including the provisions of the Framework, which outweigh this finding.

    For the reasons given above, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 173No official casework-database value to compare
    Extracted decision date · page 1
    1 March 2023Matches the official casework database
    Extracted site visit dates
    14 February 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3313057
Application reference
22/01829/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Unknown
Appeal reason
Not recorded
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 December 2022
Valid date
13 December 2022
Start date
15 December 2022
Planning authority decision date
18 November 2022
Appeal decision date
1 March 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
29071
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21