Skip to main content
Official casework recordAllowedCurrent release

Appeal 3313222

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the extension of the existing outrigger to provide better connection to the existing garden, new kitchen and utility room.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the extension of the existing outrigger to provide better connection to the existing garden, new kitchen, and utility room, at [site address] , [site address] , Bisley, Woking, Surrey [postcode] in accordance with the terms of the application, Ref 22/0652/FFU, dated 4 July 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: OI1548989; PA16-1(11)00 P1; PA16- 1(11)01 P1; PA16-1(12)00 P1; PA16-1(12)01 P1; PA16-1(14)02 P1; and PA16-1(14)03 P1.

    The development hereby permitted shall use materials in the construction of the external surfaces that match those used in the existing building.

    Prior to any equipment, machinery or materials being brought onto the site for the purposes of the development, protective fencing shall be erected for the trees shown on plan PA16-1(11)00 P1, and any trees whose canopies overhang the site. The protective fencing shall be erected in accordance with an [name] (AMS) and Tree Protection Plan (TPP) that shall have first been submitted to, and approved in writing by the local planning authority. The development shall then be carried out in accordance with the approved AMS and TPP.

  2. Section 03

    [name]

    The main parties have not put forward any relevant development plan policies in relation to the reasons for refusal, referring only to the National Planning Policy Framework (the Framework). Therefore, the main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the Framework; • the effect it has upon the openness of the Green Belt; and • if the development is inappropriate whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstance necessary to justify the development.

  3. Section 04

    Reasons

    Paragraph 149 of the Framework states that the construction of a new building is inappropriate in the Green Belt but sets out 7 exceptions to this. On review of the evidence before me I am satisfied the proposed development should be considered under paragraph 149 c), the extension or alteration of a building.

    Paragraph 149 c) requires that the extension or alteration does not result in disproportionate additions over and above the size of the original building. The Council have used a mathematical calculation to assess the physical increase in volume. However, the Framework does not prescribe what constitutes a disproportionate addition, and I find the use of a mathematical calculation as a starting point unsupported by evidence or policy.

    The appeal property constitutes one half of a semi-detached pair which are both similar in form. They both have broadly rectilinear, 2 storey main sections with a single storey rear outrigger along the shared boundary. The appeal property’s outrigger is smaller than that on the attached property which is L shaped.

    Looking at the physical characteristics of that proposed, it would alter the outrigger so that it would be a similar shape to that of the attached property. It would retain the outrigger’s subsidiary relationship with the main part of the building and balance the existing stepped rear elevation. The overarching layout and form of the appeal building, as well as the semi-detached pair, would be retained and not subsumed by the proposed extension. There are several outbuildings within the garden of the attached property, positioned directly behind the location of the proposed extension, so it would also not extend beyond existing development.

    Consequently, the proposal would retain the sense and character of the original building. Even though the proposed extension, in combination with prior extensions, may constitute a relatively large increase in volume mathematically, it would nevertheless retain the building’s overall proportions and form both in terms of design and its relationship to the wider area.

    The proposal would not, therefore, be inappropriate development in the Green Belt and would comply with paragraph 149 c) of the Framework. As the proposal would not be inappropriate development, it is not necessary to further consider the effect of the proposal on openness nor is it necessary to consider very special circumstances, and there is no other harm to weigh it against.

  4. Section 05

    Conditions

    The Council has suggested several conditions which I have considered against advice in the Framework and Planning Practice Guidance. As a result, I have amended them for consistency and clarity.

    In addition to securing commencement within the relevant statutory timeframe, I have imposed conditions requiring adherence to the approved plans; the use of materials which match the existing building; and the protection of nearby trees during construction. This is to ensure all parts of the proposal would integrate with the appeal dwelling and protect the character and appearance of the area.

  5. Section 06

    Conclusion

    For the reasons given above the appeal scheme would not conflict with the Framework, when read as a whole, and there are no sufficiently weighted material considerations, which would indicate a decision otherwise. The appeal is, therefore, allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2199No official casework-database value to compare
    Extracted decision date · page 1
    1 August 2023Matches the official casework database
    Extracted site visit dates
    24 July 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3313222
Application reference
22/0652/FFU
Lead case reference
Not recorded
Planning authority
Surrey Heath Borough Council
Planning authority code
E07000214

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
15 December 2022
Valid date
15 December 2022
Start date
10 March 2023
Planning authority decision date
10 October 2022
Appeal decision date
1 August 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
36447
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21