Appeal 3313262
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a loft conversion with provision of a dormer to rear roof elevation, a side return roof dormer and insertion of 3no Velux windows to front roof slope.
Section 02
Decision
The appeal is dismissed.
Section 03
Main issue
The main issue is the effect of the proposed development on the character and appearance of the host building and the local area.
Section 04
Reasons
The appeal property is a 2-storey mid-terrace dwelling that lies within a mainly residential area, wherein terraces predominate. The appeal dwelling is not a listed building, and it does not fall within a conservation area.
The proposal is to erect 2 dormer extensions with a larger upper element on the rear roof slope of the main dwelling and a smaller lower part on the existing 2-storey rear projection. The new additions would be set in from the edges of the host roof with external materials to match the existing dwelling and windows that would be in keeping with the appearance of the house. New roof lights are also proposed on the upper main front roof slope of No 101.
The Council has recently granted a certificate of lawfulness (proposed) (CoL) for a dormer on the main rear roof slope of No 101 together with 2 front roof lights and a new rear window. From the evidence provided, the CoL scheme is a realistic fallback position against which to assess the proposed development.
The new dormers would be sizeable additions. Together, they would extend across almost the full width of the main building and about half the length of its rear projection with the top of the smaller element projecting noticeably above both the eaves of the main building and the ridge line of existing rear projection. On this scale, the proposal would be much larger than the CoL scheme, in which the rear dormer would be confined to the main rear roof slope of No 101.
With flat roofs and an overall ‘L’ shape, albeit staggered in height, the new dormers would appear as overly large and bulky ‘box-like’ additions that would relate poorly to the traditional style, modest proportions, and the pitched roof of the host building. The visual impact of the appeal scheme would be far greater than might be implied simply from a numerical exercise that compares the volume of living space to be created with an alternative extension that could come forward through the exercise of permitted development (PD) rights.
[address], just beyond the rear of the site, the new dormers would be conspicuous features of the host building given their size and elevated position. Whether or not this highway is lightly used due to it being a no through route, public views of the proposal from it would be at a reasonably close range. From this vantage point, the new dormers would draw the eye because their combined scale and mass would give the completed dwelling an awkward top-heavy appearance.
When seen from [address], the appeal scheme would also interrupt the regular simple lines of the terrace to which No 101 belongs and its roof scape that, with one notable exception, is of free of significant roof level extensions. While the CoL scheme would do likewise, the dormer in that case would be limited to the main roof slope and so its visual impact would differ to that of the proposal. I also acknowledge that there is an isolated dormer extension in the same terrace at [address]. However, this existing dormer is atypical. It is not characteristic or reflective of the basic form of buildings in the same terrace nor is it an appropriate reason to find in favour of a development that would cause significant harm.
The appellant places some reliance on roof level extensions to other properties notably on [address] and [address], with some background details and photographs provided. Several of the examples cited are like the proposal with the case at [address] the subject of a CoL, which is a different process to that of a planning application because it seeks to establish whether or not a scheme qualifies as PD. In any event, a key principle of the planning system is that each development should be assessed on its own merits. Having done so, my own conclusion is that the proposed dormers, seen together, would unduly compromise the form of the existing dwelling and there would be a significant adverse impact on the local area.
On the main issue, I therefore conclude that the proposed development would materially harm the character and appearance of the host building and the local area. As such, it is contrary to Policy D4 of The London Plan, [name] 8 and CS 9 of [name] and Policy DM2.1 of Islington’s Local Plan: Development Management Policies. These policies aim to ensure that development achieves a high standard of design and positively contributes to local character and distinctiveness of an area.
The proposal also conflicts with the Council’s Urban Design Guide insofar as it advises that the design of dormers should be in keeping with the original dwelling. It is also at odds with the policies of the National Planning Policy Framework (the Framework), which require that development is sympathetic to local character and add to the overall quality of the area.
Section 05
Other matters
Once complete, the proposal would provide additional living, home working and study space that would meet the needs of the appellants and their family. The proposal would make efficient use of the space available at roof level. However, these matters do not outweigh the significant harm that I have identified. The absence of objections from others does not necessarily indicate that the proposal is therefore acceptable.
Section 06
Conclusion
The proposed development would conflict with the development plan, as a whole. There are no material considerations, including the Framework, which indicate that the decision should be taken otherwise than in accordance with
Section 07
the development plan.
For the reasons set out above, and having regard to all other matters raised, I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 287No official casework-database value to compare
- Extracted decision date · page 1
- 21 March 2023Matches the official casework database
- Extracted site visit dates
- 28 February 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3313262
- Application reference
- P2022/3182/FUL
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Islington
- Planning authority code
- E09000019
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 15 December 2022
- Valid date
- 15 December 2022
- Start date
- 3 February 2023
- Planning authority decision date
- 25 October 2022
- Appeal decision date
- 21 March 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 30005
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21