Appeal 3313400
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as proposed rear first floor extension as built.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I noted on my site visit that the development had been carried out. From the evidence before me, it is clear that the proposal is to retain the development that has already occurred, and I have dealt with the appeal on that basis.
Section 04
Main Issue
The main issue is the effect of the extension on the living conditions of the occupants of [address], with particular reference to outlook, sunlight and daylight.
Section 05
Reasons
No 4 is a two-storey, semi-detached dwelling located within a residential area. The dwelling has a large single storey extension. The single storey extension was subject to a prior notification application1. The scheme before me only relates to the first-floor extension, and there is no substantive evidence before me to suggest that the single storey extension was not built and in use before the addition of the first-floor extension. Therefore, I have only assessed the first-floor extension.
[address] sits at a lower level to No 4, due to the topography of the area, and sits at an angle. No 2’s rear elevation faces towards the appeal site and the extension. The rear elevation contains windows serving the living room, porch, kitchen, bedroom, landing, WC and bathroom. Some of the windows serve non-habitable rooms, have obscure glazing and some of the rooms benefit from two windows. Having said that, a significant number of No 2’s windows face towards the extension and there is a limited gap between the extension and the windows. 1 20/03971/PNH
No 2 also has a private amenity space adjacent to the extension and an area of private amenity space towards the front of the property which is relatively private due to the height of the boundary hedge. The size of the private amenity spaces is limited.
The appellant has submitted sun path analyses and highlight that the siting of the extension is at the point where there is an increased gap between the rear elevation of the host property and No 2. However, No 2 is particularly sensitive to any further overshadowing resulting from the increase scale of the host property due to the siting of No 4 (including the existing large single-storey extension) in relation to No 2. Furthermore, the occupier of No 2 has highlighted, in their objection comment, that the extension blocks out light to the rear of their home and they need to have lights on during the day.
[name] 4 already overshadowed No 2 at certain times of the day, the proposal unacceptably exacerbates the loss of light to No 2. The extension results in No 2 being further overshadowed for much of the afternoon and results in an unacceptable loss of light to No 2’s rear elevation windows. This is because of the orientation of the sun, topography of the area, limited gap between the extension and No 2’s windows as well as the extension’s height and length. Similarly, the extension results in an unacceptable loss of light to No 2’s private amenity space because of the limited size of No 2’s private amenity space, orientation of the sun, topography of the area as well as the extension’s height and length.
In relation to outlook, the appellant highlights that the extension results in the side elevation area increasing by less than 15%, the extension is located at the point where the gap between the dwellings increases and set out sight lines. The Council state that the plan showing the street scene is incorrect, and the distance between the dwellings is less than that shown on the plan.
I observed on my site visit that when viewed from No 2, the extension is a dominant addition and has an overbearing effect on the outlook from the rear elevation windows and private amenity space, with the effect of feeling hemmed in. This is due to limited gap between the extension and No 2’s windows, the topography of the area, No 2’s limited private amenity space and the extension’s height and length.
For these reasons I conclude that, due to its depth, scale and siting, the extension has an unacceptable effect on the living conditions of the occupants of [address], with particular reference to outlook, sunlight and daylight. Consequently, it conflicts with Policy DS5 of the Local Plan for the Bradford District: Core Strategy Development Plan Document (2017). This states, amongst other things, that development proposals should not harm the amenity of existing or prospective users and residents. The extension also conflicts with the Council’s Householder Supplementary Planning Document (2012). This states that extensions should not over dominate, seriously damage outlook or unacceptably reduce natural daylight reaching any neighbours’ property.
Section 06
Conclusion
For the reasons given above, having considered the development plan as a whole, and all other material considerations, the appeal does not succeed. [planning inspector] INSPECTOR
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 603No official casework-database value to compare
- Extracted decision date · page 1
- 17 April 2023Matches the official casework database
- Extracted site visit dates
- 3 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3313400
- Application reference
- 22/03519/HOU
- Lead case reference
- Not recorded
- Planning authority
- City of Bradford Metropolitan District Council
- Planning authority code
- E08000032
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 19 December 2022
- Valid date
- 19 December 2022
- Start date
- 3 January 2023
- Planning authority decision date
- 6 October 2022
- Appeal decision date
- 17 April 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 31210
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21