Skip to main content
Official casework recordAllowedCurrent release

Appeal 3314050

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for a ground floor rear extension with balcony (extension previously approved).

  1. Section 02

    Decision

    The appeal is allowed and planning permission [name]/22/05141 for a ground floor rear extension with balcony (extension previously approved) at [site address] , [site address] , Whepstead, [name]. Edmonds, [postcode] , granted on 1 December 2022 by Babergh District Council, is varied by deleting condition No.3.

  2. Section 03

    Procedural Matters

    The appellant describes the proposed development as a ‘ground floor rear extension with balcony (extension previously approved)’ while the local planning authority (LPA) describes it as the ’installation of a glass balustrade balcony (over an approved rear extension)’. I have used the appellant’s description in the banner heading above and in my decision.

    The appellant describes the address as being in Whepstead whereas the LPA describes it as being in Lawshall. I have used the appellant’s site address in the banner heading above and in my decision.

  3. Section 04

    Background and Main Issue

    Planning permission has been approved for a flat roofed extension at the appeal site, where the flat roof is to be used as a balcony with glass balustrading around it. It was approved subject to condition No.3 requiring that the glass balustrade on the north facing elevation shall be 1.8 metres high, whereas the submitted plans show the balustrade to be approximately 1.0 metre high. It is this condition which is the subject of this appeal.

    The main issue is, therefore, whether the condition No.3 of planning permission DC/22/05141 is reasonable and necessary, taking into account the living conditions of the occupiers of the adjoining property to the north in terms of privacy.

  4. Section 05

    Reasons

    [site address] is a two-storey, relatively large, detached dwelling with a neighbouring property immediately to the north. Planning permission has been granted previously for an extension where the appeal proposal is to be sited. The current appeal relates to an application for a flat roofed extension including a glass balustrade to its balcony roof. The approved plans show the balustrade to be approximately 1.0 metre high. The decision notice includes the appeal condition that the balcony on the north facing side shall be 1.8 metres high to restrict overlooking to the property on the north side.

    The appellant has included a cross section showing that a person standing at the front of the balcony would be some 20 metres from the northern boundary of the host property. The LPA considers that the distance is some 15 metres. Notwithstanding this dispute, I was able to consider distances as part of my site visit. The cross section includes an intervening garden structure on the boundary.

    The LPA has not provided any guidance as to advisory distances to protect privacy. However, on my site visit I was able to note that the intervening, substantial, open fronted garden structure with a pantile roof would provide significant screening from any overlooking and that there are some intervening boundary trees, albeit somewhat sparce, but of approximately 10 metres in height, located in the neighbouring garden. The boundary is marked by a close boarded fence of some 1.8 metres in height.

    The adjoining property is a detached dwelling in substantial grounds. Its garden land immediately facing the appeal property is a relatively narrow piece of land relative to the main garden. Its elevation includes two obscurely glazed windows and a further window located behind the existing garden structure to the host appeal property. Thus, any overlooking from the proposed balcony would be substantially reduced by the existing garden structure and the existing trees.

    I can appreciate that it might be possible to see into the neighbouring garden land on the eastern side of the neighbouring property, but this area would be at a somewhat greater distance from the proposed balcony than the neighbouring garden immediately facing it.

    The host property already has windows and also an existing balcony at first floor level facing the neighbouring dwelling. I accept that the proposed additional balcony would bring its users somewhat closer. Nevertheless, given the distance to the adjacent dwelling and the intervening garden structure and some tree planting in the neighbouring garden, I do not find that the balcony with the proposed height of the balustrading would lead to material overlooking in relative terms.

    It is possible that the garden structure might not always be present, in which case the impact upon overlooking would be somewhat greater. However, given the distance involved and the presence of trees on the boundary side of the neighbouring property, I do not consider that this would be decisive. In any event, I have no evidence before me to indicate that the garden structure might be removed.

    Furthermore, as some people may exceed a height of 1.8 metres, the condition relating to the height of the balustrade would not, in any case, be effective in all instances.

    For the above reasons, I conclude that condition No.3 is not reasonable or necessary. The proposed development, without it, would accord with paragraph 130(f) of the National Planning Policy Framework 2021 which requires a high standard of amenity for existing and future users. Consequently, the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3544No official casework-database value to compare
    Extracted decision date · page 1
    21 June 2023Matches the official casework database
    Extracted site visit dates
    1 June 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3314050
Application reference
DC/22/05141
Lead case reference
Not recorded
Planning authority
Babergh District Council
Planning authority code
E07000200

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.237 hectares
Floor space
18 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
3 January 2023
Valid date
18 February 2023
Start date
21 March 2023
Planning authority decision date
1 December 2022
Appeal decision date
21 June 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
34344
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21