Appeal 3314465
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as double storey side extension with an open porch to protect the main entrance door on the front elevation, first floor rear extension and loft conversion with the erection of an L shaped box dormer, and demolition of an existing garden shed.
Section 02
Decision
The appeal is allowed and planning permission is granted for a double storey side extension with an open porch to protect the main entrance door on the front elevation, first floor rear extension and loft conversion with the erection of an L shaped box dormer, and demolition of an existing garden shed at [site address] , Kent, [postcode] in accordance with the terms of the application, [name]/223/01993/FULL6, dated 17 May 2022, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3years from the date of this decision.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
The development hereby permitted shall be carried out in accordance with the following approved plans, drawings: BL/DRG/270921/01, 02, 03, and 04.
Section 03
Main Issue
I consider the main issue to be the effect of the proposed development on the architectural integrity of the host property and thereby the wider street scene.
Section 04
Reasons
The appeal property, [site address] is a detached two-storey, inter war house located on the corner of [address] and Forest Way.
The area comprises a mix of large detached two-storey dwellings and smaller semi-detached dwellings of varying architectural styles. Nevertheless, as with number 96 hipped roofs and expressed timber framing are common features of many of the properties. [name] observed a number of the surrounding properties have been the subject of alteration and extension and there are also examples of mansard or crown style roofs, including the neighbouring property, [address].
The appellant proposes a two-storey side extension with entrance porch canopy, two storey rear extension, loft conversion with an ‘L’ shaped box dormer and roof lights to the front and side roof slopes.
The Council raised no objection to the two-storey rear extension, porch canopy and found the choice of external materials acceptable. From what I have seen and read I would concur with its findings on these matters.
As identified above the property is located on a prominent corner plot and therefore any design solution for an extension to the host property should have due regard to the visual transition from one street façade/scene to the next. Furthermore, in this context the three-dimensional form, massing and detail proposed while respecting the design of the neighbouring properties does not, in my judgement, need to slavishly follow that of those which only face the street.
The proposed design, while maintaining a hipped roof form to the front elevation has introduced gables to the rear and side elevations. This would be a departure from the established roof form. However, when viewed from [address] the contrasting gable ended roof of the extension would clearly define this house as the end of this section of development in the road. In this context therefore, I consider that the introduction of a gable end facing Forest Way in contrast to the hipped roof of the street façade would be acceptable. In addition, I consider that the proposal to extend the dwelling closer to Forest Way while helping to address the corner does not result here in creating an unduly excessive addition to the host property.
The ‘L’ shaped box dormer is large. However, it would be set down below the ridge line of the host property, located above the eaves line of the main roof and be set well in from the roof verges. On balance therefore I consider that although large it would not, in this case visually overwhelm the roof.
The mansard style roof here would allow, while maintaining the roof pitch of the host property, the new roof to finish below the ridge line of the main house. Thereby, despite its overall size it would be visually subservient to the existing dwelling.
Furthermore, the proposed development would alter the form and massing of the original dwelling. However, the design, while retaining the hipped roof to the front elevation would also replicate many of design details found in the host property, roof pitch, expressed timber framing, fenestration proportions, matching materials etc.
For all these reasons I conclude in respect of the main issue that, while the proposed extension would be relatively large in the context of the host property, due to the overall design and its corner plot location it would nevertheless appear as well-mannered development in this location, one that would not unduly impact on the architectural integrity of the host property or the wider street scene. It would therefore accord with the objectives of Policies 6 and 37 of the London Borough of Bromley Local Development Framework– Local Plan ([name] 2019) as they seek to secure, along with other things, high-quality imaginative and attractive design that is compatible with surrounding development.
Section 05
Conditions
The conditions follow from those suggested by the Council. To ensure a high quality development, I shall include a condition about the materials to be used in the construction of the external surfaces of the building.
In the interests of certainty, I shall also impose a condition requiring the development to be undertaken in accordance with the approved plans.
Section 06
Conclusions
For the reasons given above and having regard to all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1184No official casework-database value to compare
- Extracted decision date · page 1
- 18 May 2023Matches the official casework database
- Extracted site visit dates
- 25 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3314465
- Application reference
- 22/01993/FULL6
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bromley
- Planning authority code
- E09000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 10 January 2023
- Valid date
- 10 January 2023
- Start date
- 19 January 2023
- Planning authority decision date
- 21 November 2022
- Appeal decision date
- 18 May 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 32854
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21